This Solicitation opportunity from Tennessee was posted on September 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Development Resource Center Interior Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive interior carpentry and related modifications across multiple floors of a building in Chattanooga, Tennessee, with a project value estimated between $500,000 and $1,000,000. Key tasks include constructing new interior walls with windows, installing additional electrical and plumbing systems, and adding a sprinkler head in the main lobby area. Additionally, an ADA-accessible system with door activation buttons will be installed on three doors, alongside new lighting fixtures. On the main corridor, work entails removing existing walls, creating four new doorways, and adjusting door swings for accessibility and flow. The second-floor scope covers repairing a door frame and replacing a damaged door, while the third-floor project involves constructing two new walls with doors and windows in a conference room. The contract emphasizes adherence to detailed plans and specifications, with a deadline for responses set for October 23, 2025. The project is managed by the City of Chattanooga, and interested contractors can contact Debbie J Talley for further information.
General Info
Place of Performance
TN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 15 days
- Water Pump ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Interior Carpentry on the First Floor (North End of the Building, Main Lobby) which includes adding two new walls with windows, electrical. Plumbing, adding a sprinkler head. Adding an ADA button activated system to three sets of doors (two existing, one new). Electrical, adding new lighting. Interior Carpentry on the First Floor (Main Corridor) which includes removing a section of wall and putting in four new doorways. Repositioning a door to swing in the opposite direction. Interior Carpentry on the Second Floor (City Engineering) which includes repairing a door frame and replacing a damaged door. Interior Carpentry on the Third Floor (Conference Room 3A) which includes adding two new walls with doors and windows. And others that are identified within the Plans and specifications.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
