Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DFCM Construction - VBS Construction Stage II - Invitation to Bid - POMSLA - The Point Infrastructure Package 2C Porter Rockwell Blvd Bridge - Project #25406300

Closed
MP26019-Stage IIState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract pertains to a multistage bidding process for the construction of infrastructure improvements along Porter Rockwell Blvd at The Point in Draper, Utah, managed by the Utah Division of Facilities Construction and Management (DFCM). The project involves completing approximately 772 feet of roadway, including the installation of culverts, hot mix asphalt (HMA), curb, gutter, sidewalk, MSE retaining walls, earthwork, landscaping, lighting, and other roadway appurtenances. The estimated construction cost is around six million dollars, with a substantial completion deadline set for September 15, 2026. Only contractors shortlisted during the initial Request for Proposals stage are invited to submit bids by December 2, 2025, with provisions for bid bonds and adherence to standard procurement procedures outlined in the solicitation documents. The project also includes detailed technical specifications, preliminary site plans, and structural calculations for bridge foundations, emphasizing compliance with AASHTO and UDOT standards. The contractual framework is governed by the DFCM General Conditions, revised in July 2023, which detail responsibilities, safety protocols, modification procedures, payment processes, and claims management, serving as a comprehensive guide for project administration. Supporting documentation includes technical specifications for the bridge structure, incomplete site plans with pending final design details, and instructions for subcontractor listing and health insurance compliance. The procurement process emphasizes transparency, with all addenda and related documents accessible via the designated online portal, ensuring bidders are well-informed of project requirements, schedules, and submission criteria. Overall, this contract represents a significant infrastructure development effort aimed at enhancing transportation and site amenities at The Point redevelopment area.

Documents

7

DFCM General Conditions August 2020 Revision July 2023

PDF, High priority: read this first60 pages · general-conditions
High

Stage II Invitation to Bid - The Point Infrastructure Package 2C Porter Rockwell Bridge

PDF, High priority: read this first7 pages · itb
High

The Point Package 2C Site Infrastructure Incomplete Plan Set Nov 2025

PDF, High priority: read this first49 pages · plans
High

Utah DFCM Project 22427100 Package 02C PRB Bridge Structure Technical Specifications and Bid Schedule

PDF, High priority: read this first570 pages · other
High

3-C-DFCM Health Insurance Statement of Compliance Form Revised 7.28.25

DOCX, Low priority1 page · other
Low

Structural Calculations for Porter Rockwell Blvd Bridge Arch Foundation

PDF, Low priority330 pages · other
Low

Subcontractors List Form Instructions 7.1.2021

DOCX, Low priority3 pages · instructions
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → DFCM - Division of Facilities Construction and Management
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
INVITATION TO BID This solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to bid during this stage of the selection process. VanCon W.W. Clyde & Co. Whitaker Construction Project Description: This bid package consists of completing Porter Rockwell Blvd at The Point. Work consists of completing 772 feet of roadway with: two precast three-sided culverts (64’ span), HMA, curb, gutter, sidewalk, MSE retaining walls, earthwork, landscaping, lighting and associated roadway appurtenances. Construction Cost Estimate:$6,040,957.33

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS