Diablo Dam Access Road Crib Wall Replacement

Closed
PW#2024-001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423860
New
NRP,SON LNCH DIST V — 1680016443714 — SPRPA127QWA20
Solicitation # SPRPA127QWA20
Solicitation SPRPA127QWA20 is an emergency acquisition issued by the Department of the Navy via the DLA Aviation office in Philadelphia for the procurement of NSN 7RH 1680-01-644-3714 CB, described as NRP, SON LNH DIST V. The requirement specifies a delivery timeline of 90 days with shipping terms set as FOB Destination. Inspection and acceptance will occur at the origin. The government intends to make a single award to a technically acceptable offeror, with the evaluation prioritizing past performance over price. Risk assessments may be conducted using the DoD Supplier Performance Risk System to evaluate item, price, and supplier risks. The contract mandates strict adherence to military packaging and marking standards, including MIL-STD-2073-1 for system stock and MIL-STD-129 for labeling. Specific requirements are outlined for electrostatic discharge protection per ANSI/ESD S20.20-2021 and shelf-life markings, requiring at least 85 percent of the Navy shelf-life to remain upon receipt. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment requests. Compliance with the Buy American Act and safeguarding covered defense information under DFARS 252.204-7012 is required. Offerors must provide current catalogs or price lists and validate their status in the System for Award Management.
Pa DLA Aviation At Philadelphia

POSTED

6 days ago

DEADLINE

in about 2 hours
NAICS: 423860
SLED
RFQ-171-270000000015-2 | 472/23129.KMM; Woodland C.F. - Site Mechanical Underground
Solicitation # 472/23129
Solicitation 472/23129, managed by the Michigan Department of Technology, Management and Budget, is for site mechanical underground construction at the Woodland Correctional Facility in Whitmore Lake, Michigan. The scope of work involves critical updates to the sanitary sewer and water main systems, including the installation of 6.0 and 8.0-inch watermains. Key project requirements include obtaining necessary permits from DLARA, MDOT, and EGLE, performing hydro excavation and dewatering, and adhering to MDOC utility and security shutdown standards. Bidders must participate in a mandatory walk-through and submit proposals via the SIGMA VSS portal by November 18, 2026. Due to the secure nature of the facility, personnel requiring access to the perimeter must complete a Law Enforcement Information Network background check. The project is governed by MICHSPEC Division 0 Specifications and includes specific requirements for project restoration and the testing of existing water main piping. Technical guidelines are supported by a geotechnical data report providing subsurface soil boring data and engineering recommendations for trenchless crossings. The contract emphasizes compliance with state and federal regulations, including the Build America, Buy America Act and prevailing wage requirements. Award selection is based on the responsive and responsible bidder providing the lowest price, with a 10 percent pricing preference available for qualified Service-Disabled Veteran-Owned Businesses.
DTMB

POSTED

10 days ago

DEADLINE

in 21 days
NAICS: 423860
SLED
Locomotive Overhaul Kit
Solicitation # 195772A
Metra is soliciting bids under solicitation number 195772A for the procurement of Locomotive Overhaul Kits to support the in-house rehabilitation and modernization of F40PH-3 locomotives. This indefinite quantity contract is established for a five year period with a total value not to exceed 19 million dollars. The award will be granted to the lowest responsive and responsible bidder based on gross individual unit prices or the gross bid total. Key requirements for responsiveness include bidding on all items, providing a signed contract signature page, acknowledging all addenda, and submitting a correctly executed Buy America Certificate for FTA funded procurements exceeding 150,000 dollars. The scope includes the provision of materials and overhaul kits delivered F.O.B. Destination within the Chicagoland Six County Area, specifically to the 47th Street Maintenance Facility. Pricing must be all inclusive of packaging, transport, handling, and remanufactured costs. The contract mandates a one year warranty period and requires compliance with various federal and state regulations, including 49 CFR Part 26 for Disadvantaged Business Enterprises, the Americans with Disabilities Act, and FTA Circular 4220.1G. Bidders must provide notarized non collusion affidavits and certifications regarding debarment and suspension. The successful contractor is responsible for performing all inspection and acceptance testing of items prior to delivery.
Metra

POSTED

15 days ago

DEADLINE

in 12 days
NAICS: 423860
International
Multiple Victoria-Class Spares - Anti- Flash Device, Cooler,Fluid,Industrial, Cartridge,Check Valve, Parts Kit, Fluid Pressure Filter, Valve, Safety Relief
Solicitation # W8482-275589/A
The Department of National Defence is soliciting proposals under solicitation number W8482-275589/A for the procurement of various Victoria-Class spares. The required items include anti-flash devices, industrial fluid coolers, check valve cartridges, fluid pressure filter parts kits, and safety relief valves. These components are to be delivered in equal quantities to CFB Esquimalt and CFB Halifax. All goods must be new and delivered Free Carrier (FCA) per Incoterms 2020. Bids are due by November 9, 2026, at 14:00 EST, with the Department of National Defence reserving the right to negotiate delivery dates around March 31, 2027. The contract mandates strict quality and packaging standards, including specific marking requirements for manufacturer names and part numbers, and the use of PDF417 bar code symbols for unique identification. Certain items require permanent stamping or etching and must adhere to specific shelf-life requirements, ensuring at least 75 percent of the authorized shelf life remains upon delivery. Bidders proposing equivalent or substitute products must provide comprehensive technical specifications and compliance statements to prove full interchangeability. Payment for undisputed invoices will be issued within 30 days of receipt.
Department of National Defence

POSTED

about 1 month ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The project involves comprehensive construction activities along the Diablo Dam Access Road, including mobilization, traffic control, and installation of Best Management Practices. Key tasks encompass the installation of a new soldier pile wall with steel H columns and permanent concrete lagging, removal and reinstallation of existing barriers, excavation and removal of large boulders, and the construction of a crib wall veneer. Additionally, the project requires removing an existing wooden log crib wall, excavating in front of the new wall, and repaving the access roadway from State Route 20 to Diablo Dam, restoring it to its original elevation and condition. The work also includes installing temporary wooden lagging and backfilling behind the new wall to ensure stability and safety. Located along the Diablo Dam Access Road in Whatcom County, approximately 130 miles north of Seattle, the project has an estimated cost between 1.1 and 1.3 million dollars, excluding sales tax. The contract, titled "Diablo Dam Access Road Crib Wall Replacement," was posted on October 23, 2024, with a response deadline of November 13, 2024. The project is managed by the Washington Public Works agency, with Jessica Guerrette serving as the primary contact. The scope of work aims to improve infrastructure safety and stability in this scenic area, ensuring the roadway's integrity and accessibility are maintained.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A
Contacts

Full Description

Show more
Project Description: This Project consists of the following elements of Work: Mobilization/demobilizationProject SubmittalsTraffic Control Plan, barriers, and devicesInstall BMPsRemove and reinstall existing jersey barriersBreak up and remove select large bouldersShaft constructionInstall temporary wooden laggingInstall new soldier pile wall (steel H columns and permanent concrete lagging)Install backfill behind new wallRemove existing wooden log crib wall (approximately 12’ x 40’)Excavation/removal in front of proposed wallProvide and install crib wall veneerRemove asphalt pavement and 12” of subgradeRepave access roadway pavement from State Route 20 to the Diablo Dam in the same location/elevation as existing pavementEngineer's Estimate: $1.1 to $1.3 Million (before sales tax)Project Location: This Project is located along the Diablo Dam Access Road, between State Route 20 Milepost 127.8 (North Cascade Highway) and the Diablo Dam.  Diablo Dam is located approximately 130 miles north of Seattle in Whatcom County.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project (PW# 2025-041 / HSIP-000S(708)) is a federally funded infrastructure initiative managed by the Seattle Department of Transportation. The project focuses on enhancing pedestrian safety across eight specific locations in Seattle, including intersections at 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, Renton Ave S and Holden St, 55th Ave S and Renton Ave S, Rainier Ave S and S Byron St, Rainier Ave S and S Findlay St, Rainier Ave S and S Mead St, and Beacon Ave S and S Webster St. The scope of work encompasses sidewalk and pavement removal and restoration, the installation of pedestrian islands, curbs, curb ramps, drainage structures, and pipes, as well as clearing, grubbing, landscaping, and the installation of RRFB and traffic signals, signing, channelization, electrical work, and rebar. The engineer's estimate for the project is between $3,250,000 and $3,350,000. The contract is awarded to the apparent low bidder who meets all mandatory responsibility criteria, with a tie-breaker based on the highest percentage of recycled materials proposed. Performance must be completed within 120 working days from the Notice to Proceed. Funding is provided by the HSIP FHWA Grant and the Transportation Levy Fund, requiring compliance with Federal Prevailing Wage Rates, Buy America standards, and Federal Small Business Enterprise (FSBE) goals. Bidders must provide a bid guaranty of five percent of the total bid and certify compliance with equal opportunity and non-discrimination laws. The project is subject to rigorous inspection by the Engineer to determine substantial completion, which requires the owner to have full operational and safety use of the facilities.
Highway, Street, and Bridge Construction

POSTED

about 21 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
1st Ave NE Shared Use Path - N 120th to N 130th
Solicitation # PW#2026-005
Solicitation PW#2026-005 is for the improvement of the 1st Ave NE Shared Use Path from N 120th St to N 130th St in Seattle, Washington, located near North Acres Park and James Baldwin Elementary School. The scope of work is divided into a base bid, which includes pavement removal, roadway paving, sidewalks, curb ramps, storm drains, landscaping, channelization, and signage, and additive work consisting of electrical foundations and pedestrian lighting. The project is managed by the City of Seattle Public Works department, with bids opening on October 28, 2026. Performance requires a conventional Critical Path Method schedule with monthly updates and three-week look-ahead schedules. Bidders must submit proposals electronically via OpenGov, including a pricing proposal, a signed declaration, and a recycled materials proposal. A bid guaranty of five percent of the total bid is required. A critical evaluation factor is the Inclusion Plan; bidders scoring fewer than 10 points will be deemed non-responsive. Additionally, the City will not award the contract until an approved Social Equity Plan is received. Mandatory certifications include a UBI number, registration under RCW 18.27, industrial insurance coverage, and proof of prevailing wage training. The contractor must also ensure ADA compliance for curb ramps and adhere to specific marking and packaging standards for hazardous materials and infrastructure components.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 2 hours
View Details
NAICS: 236220
New
SLED
Dahl Restroom Renovation
Solicitation # 2025-068
Solicitation PW#2025-068 is for the renovation of a fire-damaged Parks storage and restroom building located at 7700 25th Ave NE, Seattle, WA. The scope of work includes replacing fire-damaged structural timber frames, installing shear walls, replacing the roof, and removing an existing stone chimney. Interior improvements involve converting the facility into two single-occupancy restrooms with entirely new electrical and plumbing systems. Additionally, the project requires accessibility site improvements, including the revision of accessible parking stalls, sidewalks, and the pathway leading to the restrooms. The engineer's base estimate for the project is $968,676.00. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with evaluation based on mandatory responsibility criteria and supplemental factors such as labor standards compliance, equal benefits declarations, and apprentice utilization. Bidders must submit their proposals electronically via OpenGov by November 4, 2026. Key requirements include a bid guaranty of five percent of the total bid, adherence to prevailing wage rates, and compliance with ADA standards. The contractor is subject to liquidated damages of $1,000.00 per working day for delays beyond the substantial completion date. All work is subject to inspection and final approval by the Engineer.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 562991
New
SLED
Stormwater Filter Facility Maintenance
Solicitation # 2026-GEN-013
The City of Washougal is soliciting bids for the inspection and maintenance of stormwater filter cartridge facilities, including filter catch basins, manholes, and vaults. The scope of work comprises a base bid for 23 City-maintained facilities containing up to 134 cartridges and an optional alternate bid for up to 10 HOA-maintained facilities containing up to 63 cartridges. Key responsibilities include facility inspections, replacement of cartridges based on Ecology TAPE guidance, vacuum cleaning of facility floors, implementation of traffic control plans for specific high-traffic areas, and the proper hauling and disposal of all waste materials. All work must be documented via Survey123 and completed within 90 calendar days of the notice to proceed, with a final completion deadline of March 15, 2027. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 2:00 p.m. PT. Requirements for bidders include the submission of a Bid Bond, E-Verify Declaration, Wage Compliance, and Non-Collusion forms, as well as acknowledgment of Addendum No. 1. The project mandates the payment of prevailing wages and requires the contractor to provide performance and payment bonds for the full contract amount. Payment will be made via checks within 30 days of approved progress payment requests, with a 5 percent retention held during the progress of the work. Partial funding for this project is provided through the Washington State Department of Ecology.
Septic Tank and Related Services

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (Solicitation 2025-074) is a federally funded infrastructure initiative managed by the City of Seattle Department of Transportation. The project focuses on roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. The scope of work includes planing asphalt overlay, removing and replacing select concrete panels and base repair, and performing an intersection realignment at NE 113th Street. Additional requirements include the installation of curb bulbs at NE 114th and 115th Streets, ADA-compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000, with a physical completion timeline of 250 working days from the Notice to Proceed. Bids for the project open on November 4, 2026, and must be submitted via the OpenGov portal or in hard copy. The contract mandates a 13% Frontline Small Business Enterprise (FSBE) goal and requires strict adherence to the Buy America Act, Title VI of the Civil Rights Act of 1964, and various state and federal wage and labor laws. Bidders must provide a bid guaranty of 5% of the total bid and maintain a valid Seattle Business License and UBI number. Performance and payment bonds are required to protect claims under Washington state law. Quality control is the sole responsibility of the contractor, with specific inspection requirements for shelter footings by KC Metro and strict compliance with Department of Ecology and EPA water quality standards.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

8 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS