Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on September 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

District Office Microgrids with Battery and Solar Integration Turnkey Solution

Closed
2025-78State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 441110
New
International
INVITATION TO QUOTE SUPPLY AND DELIVERY OF All Wheel Drive, Plug-in Hybrid, Sport Utility Vehicle
Solicitation # IWS 2026-064
Solicitation IWS 2026-064 is an invitation for non-binding quotations from the Capital Regional District in British Columbia for the supply and delivery of one All Wheel Drive, Plug-in Hybrid Sport Utility Vehicle. The vehicle is intended for utility data collection and maintenance operations and must comply with Canada Motor Vehicle Safety Standards. Key technical specifications include 10-way adjustable seats with lumbar support, a minimum of 39 inches of driver headroom, and at least 40 inches of driver legroom. The vehicle must be delivered F.O.B. to CRD Fleet Services in Victoria, BC, with the supplier providing 48 hours' notice prior to delivery. Required documentation to accompany the vehicle includes the window sticker, specification sheet, build sheet, and operator manuals. Quotes must be submitted electronically to Michael Sunshine by 2:00 PM PCT on November 13, 2026. Submissions must include a signed copy of the offer, a Schedule of Quantities and Prices, and an acknowledgement of any addenda. Bidders are required to confirm compliance with all specifications using yes or no responses and must provide a pro forma contract review. Award is not guaranteed to the lowest bidder, and the Capital Regional District reserves the right to reject any quotation. Payment terms are set at 30 days from the date of invoice. The successful supplier must maintain all legally required insurance and Workers Compensation Act coverage.
Capital Regional District

POSTED

about 17 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

SECO Energy is seeking proposals from qualified firms to deliver turnkey solutions for three microgrid projects in Florida, funded under the USDA New ERA program. The contractor will be responsible for the complete process, involving design, engineering, procurement, construction, commissioning, and ongoing operational support. The primary objective is to ensure reliable backup power for SECO’s campuses during outages, with additional aims to reduce peak demand through dispatchable distributed energy resources and to generate surplus solar power for sale to SECO members. These projects are an integral part of SECO Energy’s strategic move toward a clean, reliable energy future while satisfying federally mandated greenhouse gas reduction requirements. The contract covers the delivery and integration of advanced microgrid systems utilizing solar generation and battery storage within SECO's service territory, which spans approximately 2,000 square miles and provides electricity to over 256,000 accounts. All necessary qualified labor, equipment, materials, and supervision must be provided by the contractor for both overhead and incidental underground electrical work as required. Interested bidders are required to attend a mandatory pre-proposal Teams meeting for eligibility and must submit proposals and pricing strictly through VendorLink, adhering to all instructions and documentation requirements specified in the RFP, including potential future compliance with RUS funding documentation.

General Info

To support continued interest and growth for renewable energy in Florida, SECO Energy is soliciting proposals from qualified firms to provide turnkey services including design, engineering, procurement, construction, commissioning, and operations support for the deployment of USDA New ERA funded three microgrid projects. The primary purpose of these systems is to provide a highly reliable source of back-up power for each campus during grid outages. The secondary goal is to dispatch the DER systems for peak demand reduction. A tertiary goal is to provide solar generation which can be exported for sale to SECO members. These projects are intended to advance SECO Energy’s transition to clean, reliable, and affordable energy while meeting greenhouse gas (GHG) reduction goals required by USDA and federal law. Please see complete RFP in documents for full scope of work.MUST ATTEND MANDATORY PRE-PROPOSAL TEAMS MEETING IN ORDER TO SUBMIT A BID Meeting ID: 226 213 606 596 2Passcode: Dc7fH6chDial in by phone+[phone hidden],,757249070# United States, ChicagoPhone conference ID: 757 249 070#Sumter Electric Cooperative, Inc., also known as SECO Energy, is a not-for-profit, member-owned electric utility. With over 256K active accounts (90/10 residential/commercial split), SECO Energy is the third largest electric cooperative in Florida and the seventh largest in the entire United States. The service territory area is approximately 2,000 square miles. The Contractor shall provide all qualified labor, equipment, tools, vehicles, documentation and supervision to perform all facets of overhead distribution line work and incidental underground work within SECO`s service territory (the “Services” or “Work”). See attached Statement of Work and Bid Specifications.**** Bid Instructions****All questions and proposals must be submitted in VendorLink. PLEASE NO PHONE CALLS OR E-MAILS.The following requirements must be met, in order to submit your bid in VendorLink:1. Must upload your proposal, choosing `Proposal` as your file type.2. Must enter line item pricing in the Quote/Bid Items section of VendorLink (must match the price sheet from the RFP).Please note: RUS may, in the future, require documents pertaining to the funding of this project that may be required to be completed. As these become available, they will be posted to this RFP. ****Any red lines must be submitted with the RFP****

Place of Performance

FL, USA

Set-Aside

NONE

Documents

1

SECO RFP 2025-78 District Office Microgrids Turnkey Solution

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → SECO Energy
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → SECO Energy
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
To support continued interest and growth for renewable energy in Florida, SECO Energy is soliciting proposals from qualified firms to provide turnkey services including design, engineering, procurement, construction, commissioning, and operations support for the deployment of USDA New ERA funded three microgrid projects. The primary purpose of these systems is to provide a highly reliable source of back-up power for each campus during grid outages. The secondary goal is to dispatch the DER systems for peak demand reduction. A tertiary goal is to provide solar generation which can be exported for sale to SECO members. These projects are intended to advance SECO Energy’s transition to clean, reliable, and affordable energy while meeting greenhouse gas (GHG) reduction goals required by USDA and federal law. Please see complete RFP in documents for full scope of work.MUST ATTEND MANDATORY PRE-PROPOSAL TEAMS MEETING IN ORDER TO SUBMIT A BID Meeting ID: 226 213 606 596 2Passcode: Dc7fH6chDial in by phone++1 (555) 000-0000,,757249070# United States, ChicagoPhone conference ID: 757 249 070#Sumter Electric Cooperative, Inc., also known as SECO Energy, is a not-for-profit, member-owned electric utility. With over 256K active accounts (90/10 residential/commercial split), SECO Energy is the third largest electric cooperative in Florida and the seventh largest in the entire United States. The service territory area is approximately 2,000 square miles. The Contractor shall provide all qualified labor, equipment, tools, vehicles, documentation and supervision to perform all facets of overhead distribution line work and incidental underground work within SECO`s service territory (the “Services” or “Work”). See attached Statement of Work and Bid Specifications.**** Bid Instructions****All questions and proposals must be submitted in VendorLink. PLEASE NO PHONE CALLS OR E-MAILS.The following requirements must be met, in order to submit your bid in VendorLink:1. Must upload your proposal, choosing `Proposal` as your file type.2. Must enter line item pricing in the Quote/Bid Items section of VendorLink (must match the price sheet from the RFP).Please note: RUS may, in the future, require documents pertaining to the funding of this project that may be required to be completed. As these become available, they will be posted to this RFP. ****Any red lines must be submitted with the RFP****

More opportunities from Florida → SECO Energy

Same awarding agency

NAICS: 237130
New
SLED
Pre-Qualification for Upcoming Overhead Construction Bids - WA
Solicitation # 2026-88
Solicitation 2026-88 is a Request for Qualifications issued by SECO Energy to establish a pool of prequalified contractors for future Overhead Feeder Construction and New Feeder Install projects. This is a mandatory requalification process; any firm previously qualified with SECO Energy must resubmit their qualifications to be eligible for upcoming Requests for Proposals expected in October 2026. The general scope of work includes directional boring, underground excavation, installation of 4-inch conduit systems and duct banks, placement of 1000 MCM 25 kV EPR aluminum primary cable, and the installation of underground switchgear, splice boxes, and grounding systems, as well as right-of-way clearing and site restoration. To be deemed qualified, vendors must complete a comprehensive questionnaire covering company information, technical capabilities, and references from electric cooperatives or public utilities. Key requirements include the ability to provide a 10 percent bid bond and a 100 percent performance bond, as well as the submission of three years of safety records, including EMR ratings and OSHA 30A summaries. While projects will utilize Rural Utility Service funding and may require Davis-Bacon Act compliance, a lack of prior RUS experience is not an automatic disqualifier. Evaluation is based on the firm's risk management profile, including sam.gov registration and Dun and Bradstreet PAYDEX scores, and their demonstrated ability to perform similar utility construction activities.
Power and Communication Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS