Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

DLR TEx - Cadent Gas Feasibility and Options Study

Awarded
CW90498International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Transport for London has entered into a direct award contract with Cadent Gas Limited valued at 1,594,000 pounds for a C3 stage feasibility design and options study. This project is essential for the DLR Thamesmead Extension, as the current route intersects a strategic and asset-dense section of the London Network containing high, intermediate, and medium-pressure gas mains, as well as the Beckton Above Ground Installation and pressure reduction infrastructure. These assets represent a critical technical and programme risk that must be addressed to enable the extension. The scope of the C3 works involves a comprehensive desktop-based assessment to identify potential diversion and AGI rationalisation requirements. This includes the development of design options, the engagement of a Cadent-approved design house, initial material take-off assessments, and high-level cost estimates for subsequent phases. Additionally, a multi-disciplinary project management team will be mobilised to coordinate technical interfaces and third-party stakeholders. The contract performance period runs from August 14, 2026, to February 24, 2027, and the direct award is justified by Cadent's exclusive legal rights as the statutory Gas Distribution Network Operator.

General Info

TfL awarded Cadent Gas 1,594,000 pounds for DLR Thamesmead Extension feasibility design studies.

Agency

Transport for LondonView Agency

Contract Value

$0

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GBR

Set-Aside

NONE

Awardee

Cadent GASView Profile

Documents

(1)

2026/S 000-087963 - DLR TEx Cadent Gas Feasibility and Options Study

PDFaward

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTransport for London
Contacts1 person available
OfficeN/A
Organization / Agency
Transport for London
View Agency Profile
Office AddressN/A

Full Description

Show more
Contract for the provision of a C3 stage feasibility design and options study for potential gas diversion works required to enable the proposed DLR Thamesmead Extension. The current alignment of the Thamesmead Extension (TEx) route intersects a highly strategic and asset-dense section of Statutory Undertaker Cadent's London Network, comprising high, intermediate and medium-pressure gas mains, alongside key installations including the Beckton Above Ground Installation and associated pressure reduction infrastructure. These assets present one of the most significant technical and programme-critical risks to the TEx programme. This request relates solely to the Feasibility Design and Options Study (C3 Works), This phase will provide a comprehensive desktop -based assessment of all potential diversion and AGI rationalisation requirements aligned to the current TEx design. The scope includes options development, engagement of a Cadent-approved design house, initial material take-off assessments, high level cost estimates for later phases, and mobilisation of a dedicated multi-disciplinary project management team to coordinate technical interfaces and third party stakeholders. The value for this contract is £1,594,000

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing utility locating and potholing, geotechnical and geophysical investigations, LIDAR surveying, and comprehensive engineering support across civil, structural, mechanical, electrical, and instrumentation and controls disciplines. Additional requirements include BIM/3D modeling, commissioning and startup planning, environmental assessments, permitting support, hazardous materials surveys, and CPM scheduling. This opportunity is specifically targeting qualified Disadvantaged Business Enterprises, including Minority, Women, and Other Business Enterprises. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid through the Building Connected electronic system. The bid deadline is September 11, 2026. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the bond premiums. Kiewit, as a signatory to multiple collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. Plans and specifications are available for review at the Kiewit office in Costa Mesa, California.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline and installing service laterals to decommission existing residential pump stations. The scope of work includes infrastructure extensions from the Cinder Lane and McMullin Drive intersection to the Poplar Street and Lodgepole Drive intersection, including the Tara Lane and Melody Lane cul-de-sacs, and may include minor transportation improvements such as a mini roundabout or turn lane. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The selection process is based on a scoring system evaluating project understanding, team qualifications, and firm experience, with a potential optional interview. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall/Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority, and women-owned businesses. The response deadline for this opportunity is September 29, 2026.
Parametrix

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601) to mitigate chronic flooding and improve water quality. The selected consultant will be responsible for advancing the project to a shovel-ready phase, which includes a comparative evaluation of pump station siting alternatives at Ironwood and Aster Park, the development of 60, 90, and 100 percent plans, specifications, and estimates, and the management of CEQA and NEPA environmental reviews. The project involves the replacement of storm drain lines, culverts, and catch basins, as well as the design of a stormwater pump station and retarding basins. This procurement is funded in part by a U.S. EPA Community Project Funding award, requiring strict adherence to federal procurement standards under 2 CFR Part 200, including drug-free workplace certifications and non-discrimination compliance. Selection is based on a qualifications-based process consistent with the Brooks Act and California Government Code, with evaluation weights focused on scope understanding (40 percent), team qualifications (25 percent), and project approach (25 percent). The contract is estimated at 1.3 million dollars and will be administered on a time-and-materials basis with a not-to-exceed total. Key deliverables include a detailed work plan, monthly progress reports, and final design documents provided in electronic formats. The consultant must comply with California Labor Code prevailing wage requirements and maintain comprehensive general liability, workers compensation, and disability insurance. Proposals were due by September 22, 2026, with an estimated notice to proceed occurring eight weeks after the submittal deadline.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Transport for London

Same awarding agency

NAICS: 333921
New
International
Escalator Programmable Logic Controllers, Drives, inverters and interfaces
Solicitation # WS3006219152
Transport for London and London Underground Limited are establishing a framework for the manufacture and supply of escalator components, divided into two distinct lots. Lot 1 focuses on the manufacture and supply of new escalator Programmable Logic Controllers built to TfL specifications, including associated field wiring, motor drives, and Human Machine Interfaces, with a priced option for installation. Lot 2 covers the manufacture and supply of drives and inverters required for OPEX maintenance. The framework includes an initial call-off for the supply and installation of PLCs at Piccadilly Circus. The framework is scheduled to commence in late winter or early spring 2027 for an initial five-year term, ending March 1, 2032, with an option to extend for up to three additional years in a two-plus-one year sequence, potentially extending to March 1, 2035. The total estimated value of the contract is 18,061,649 GBP excluding VAT, with Lot 1 estimated at 10,837,169 GBP and Lot 2 at 7,224,779 GBP. Award criteria for both lots are weighted at 50 percent for technical quality, 40 percent for commercial price, and 10 percent for social value. The procurement is open to small and medium-sized enterprises and follows an open procedure under the utilities special regime.
Elevator and Moving Stairway Manufacturing

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS