Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Dockweiler Least Tern Fence Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Dockweiler Least Tern Fence Project, managed by the California Department of Parks and Recreation Angeles District, involves the replacement of approximately 2,500 linear feet of deteriorated chain link fencing at Dockweiler State Beach in Los Angeles. The project is designed to protect a 7.5 acre colony of the federally endangered California least tern by preventing human activity and ground based predators from accessing the habitat. This work is necessary because the existing fencing has suffered advanced deterioration, including mesh gaps and collapsed arm wires, which contributed to colony abandonment in 2022. The scope of work includes the removal of the old fence and the installation of new fencing using heavy equipment and augering post holes to a depth of approximately four feet. The project is classified under NAICS code 237990 and is designated as a forecast with a posted date of August 31, 2026. It is categorized as a Class 4 Categorical Exemption for minor alterations to land under CEQA guidelines. Project administration is led by Environmental Scientist John Ota, and all implementation must adhere to the CDPR Project Evaluation Form and specialist conditions.

General Info

Replace 2,500 feet of fencing to protect endangered California least terns in Los Angeles.

Agency

California Parks and Recreation, Department of

Place of Performance

Via Marina and Pacific Avenue, Los Angeles, CA, 90292

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
John OtaEnvironmental Scientist

Full Description

Show more
Dockweiler SB is host to a federally endangered California least tern colony. In the mid 1980’s, a portion of the beach northwest of Ballona Creek was enclosed to prevent human activity and ground based predators from disturbing the colony. In 2006 the enclosed area was expanded to its current footprint and a new fence was installed. The fencing material is in an advanced state of deterioration. Gaps in the mesh and collapse of arm wires has allowed humans and predators to easily access the colony, and related disturbance is associate with colony abandonment in 2022. Grant funding for Angeles District to replace the existing fence was obtained in 2023. A contractor will replace ~2,500 linear feet of chain link fencing protecting the ~7.5 acre California least tern colony, using heavy equipment and augering new post holes to a depth of ~4’.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS