Permit No. 19841 –Hinrichsen Levee Stairs and Utilities Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hinrichsen Levee Stairs and Utilities Project, managed by the Central Valley Flood Protection Board in Sacramento, California, involves the installation of concrete steps and utility infrastructure on a levee. The scope of work includes constructing thirty-three 4-foot wide concrete steps on the landside slope with an accompanying handrail, and twenty-four 4-foot wide concrete steps on the waterside slope. The project also requires the installation of a three-quarter inch PVC water pipe and a double-walled electrical conduit buried at least 24 inches deep, running from the landside toe, across the crown, and down to the waterside. Additional components include an emergency shutoff valve on the landside hinge and 18 pop-up sprinkler heads equipped with a leak detection sensor. To complete the project, natural grasses and wildflowers will be planted as ground cover.

General Info

Installation of concrete steps, utility infrastructure, and landscaping for the Hinrichsen Levee Project.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(1)

Item_5C_2026

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Angela R Nguyen-TanSenior Environmental Scientist
Patrick and Julianne HinrichsenSenior Environmental Scientist

Full Description

Show more
To install thirty-three (33) concrete steps, 4-feet wide, on the landside slope of the levee and twenty-four (24) concrete steps, 4-feet wide, on the waterside slope, with a handrail on the landside stairs; one three-quarter inch PVC water pipe and one three- quarter inch electrical conduit, double-walled, installed at a minimum depth of 24 inches, extending from the landside levee toe up along and parallel to the landside stairs, across the levee crown, and down parallel to the waterside stairs; an emergency shutoff valve located on the landside hinge of the levee; and 18 level pop-up sprinkler heads (nine on the landside and nine on the waterside) in double wall pipe with a leak detection sensor which will be installed at the landside levee toe and on the lower embankment of the waterside slope. Natural grasses and wildflowers will be planted to serve as ground cover

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, encompassing civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and general electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to American Iron and Steel (AIS) provisions, the Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include certified DBE, MBE, WBE, SBE, SBRA, LSFA, and HUB Zone small businesses. To be considered responsive, firms must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and will consider quotes from bidders capable of maintaining such relations on the project.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the project involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The estimated contract value ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for small businesses, including specific preferences for HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Mandatory requirements for responsiveness include active SAM registration, a bid guarantee, and the submission of Standard Form 1442. The contractor is required to provide key personnel, including a Project Manager, Superintendent, QC Manager, and Site Safety and Health Officer, and must adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Failure to meet the delivery schedule will result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 29 days
View Details