Merced Avenue Stormwater Capture Project CIP No. 089
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of El Monte is implementing the Merced Avenue Stormwater Capture Project (CIP No. 089) to replace the existing storm drain between Merced Avenue and Brockway Street. This initiative involves replacing an open concrete channel with a subsurface reinforced box culvert and a diversion structure to manage dry-weather and wet-weather flows. The project features a 0.3-acre vegetated bio-swale with a subsurface passive irrigation system designed for water quality enhancement and stormwater treatment, providing a storage capacity of approximately 0.23 acre-feet. Beyond infrastructure improvements, the project focuses on urban connectivity by constructing a shared use path above the culvert, installing raised crosswalks, pedestrian gates, and motion-activated lighting. The 2.56-acre site will also be secured with 8-foot-tall metal screening fences along its boundaries. Construction is scheduled to commence in May 2027 and is expected to reach completion by December 2028.
General Info
Agency
NAICS
Place of Performance
Merced Avenue and Brockway Street, El Monte, CA, 91731Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
