Merced Avenue Stormwater Capture Project CIP No. 089

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of El Monte is implementing the Merced Avenue Stormwater Capture Project (CIP No. 089), a comprehensive infrastructure initiative located on a 2.56-acre site between Merced Avenue and Brockway Street in Los Angeles County. The project focuses on replacing an existing open concrete storm drain with a subsurface reinforced box culvert and a diversion structure designed to capture dry-weather and partial wet-weather flows. These captured flows will be managed by a treatment system featuring pretreatment facilities and a 0.3-acre vegetated bio-swale with a storage capacity of 0.23 acre-feet and a subsurface passive irrigation system. In addition to water quality enhancements, the project includes significant pedestrian and bicycle connectivity improvements. This involves the construction of a shared use path above the new culvert, the installation of raised crosswalks at Merced Avenue and Brockway Street, motion-activated lighting, pedestrian gates, and an 8-foot-tall metal screening fence along the northern and southern boundaries. Managed by the Public Works Division, the project is subject to environmental review under CEQA, with an Initial Study and Mitigated Negative Declaration process. Construction is anticipated to begin in May 2027 and reach completion by December 2028.

General Info

El Monte's Merced Avenue project replaces storm drains with culverts and paths by December 2028.

Agency

California → City of El Monte

Place of Performance

Merced Avenue and Brockway Street, El Monte, CA, 91731

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of El Monte
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of El Monte
Office AddressN/A
Contacts
Frank CoyleDirector of Planning
Jerry MorenoPublic Works

Interested Companies (1)

CASC Engineering and ConsultingColton, CA

Full Description

Show more
The City of El Monte proposes to replace the existing City-owned El Monte Storm Drain between Merced Avenue and Brockway Street. The Project includes stormwater infrastructure improvements, water quality enhancements, and pedestrian and bicycle connectivity improvements. Specifically, the existing open concrete channel will be replaced with a subsurface reinforced box culvert and a diversion structure designed to capture dry-weather flows and a portion of wet-weather flows. Captured stormwater will be conveyed to a treatment system consisting of pretreatment facilities and a vegetated bio-swale with a footprint of approximately 0.3 acres, a ponding depth of 0.75 feet, and a storage capacity of approximately 0.23 acre-feet. The bio-swale will include a subsurface passive irrigation system to support vegetation. The Project also includes construction of a shared use path above the culvert, raised crosswalks at Merced Avenue and Brockway Street, pedestrian gates, motion-activated lighting, and installation of an 8-foot-tall metal screening fence along both the southern and northern boundaries. The Project site is approximately 2.56 acres in size and is located within a fully developed urban area. Construction is anticipated to begin in May 2027 and be completed by December 2028.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS