Goleta Water District - Corona Reservoir Rehabilitation & Filter Washtrough Replacements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Water District is seeking a contractor for the Corona Reservoir Rehabilitation and Filter Washtrough Replacements project located at the Corona Del Mar Water Treatment Plant in Santa Barbara County. The project focuses on two primary objectives: replacing deteriorated fiberglass filter troughs, which have been in service since 1974, with new stainless steel troughs to ensure uninterrupted water treatment and improved reliability. Additionally, the project involves the rehabilitation of the Corona Reservoir to preserve a critical storage facility. This scope includes removing the deteriorating interior liner, replacing joint sealant, repairing concrete cracking and palling, replacing the entry ladder, and addressing a suspected minor floor leak. The project is classified under NAICS code 237990 and is currently listed as a forecast with a posted date of August 27, 2026. It has been identified as a categorical exemption under CEQA Article 19, Section 15301 Class 1, as the work involves the rehabilitation of existing deteriorated facilities without expanding capacity. Key administrative contacts for the project include Project Lead Karina Darke and Engineering and Infrastructure Manager Daniel Brooks. The work is essential to prevent potential water quality impacts, safety hazards, or emergency shutdowns caused by continued facility deterioration.

General Info

Goleta Water District will rehabilitate Corona Reservoir and replace CDMWTP filter washtroughs.

Agency

California → Goleta Water District

Place of Performance

Goleta, CA, 93117

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Goleta Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Goleta Water District
Office AddressN/A
Contacts
Karina DarkeProject Lead
Daniel BrooksEngineering & Infrastructure Manager

Full Description

Show more
This project consists of replacing the deteriorated fiberglass filter troughs at CDMWTP with new stainless steel troughs and rehabilitating Corona Reservoir by removing the deteriorating interior liner, replacing join sealant, repairing concrete cracking and palling, replacing the entry ladder, and addressing a suspected minor floor leak. The filter troughs, in service since 1974, have deteriorated due to continuous exposure to water, sunlight and treatment chemicals. Replacement will improve filter reliability, particularly during outages, and ensure uninterrupted treatment. Rehabilitation of Corona Reservoir will preserve a critical storage facility and sustain reliable water service. Without this work, continued deterioration could impact water quality, create safety hazards, or force an emergency shutdown.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 7 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS