Industrial Water Treatment Plant Test Well Conversion and Water Treatment Plant Expansion Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Galt in California is undertaking the Industrial Water Treatment Plant Test Well Conversion and Water Treatment Plant Expansion Project. This initiative involves the design and conversion of a 2016 test well into a production well, requiring a design capacity of at least 1,000 gpm and a variable speed well pump design flow of 1,150 gpm at maximum speed. To support this conversion, the project includes necessary upgrades and the expansion of the existing Water Treatment Plant to facilitate pipeline routing and connection. The project is located in Sacramento County and was approved on June 3, 2025. According to the Notice of Determination, a Negative Declaration was prepared under the California Environmental Quality Act, concluding that no mitigation measures or monitoring plans are required. The project is managed by the City of Galt, with Alejandra Ricci serving as the primary point of contact.

General Info

City of Galt project converting a test well and expanding water treatment plant.

Agency

California → City of Galt

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Galt, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination - Industrial Water Treatment Plant Expansion

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Galt
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Galt
Office AddressN/A
Contacts
Alejandra RicciPrincipal Civil Engineer

Full Description

Show more
This Project consists of the design for converting the 2016 test well into a production well and required upgrades to the Water Treatment Plant to allow pipeline routing, connection, and the expansion of existing plant for the new well. The test well conversion to a production well shall meet a design capacity of at least 1,000 gpm, with the design flow of the new variable speed well pump at 1,150 gpm at maximum speed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details