Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Environmental Review No. 8979 – Coalinga Disposal Site Groundwater Monitoring Well Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Fresno County is initiating a project at the Coalinga Disposal Site to install groundwater monitoring well CMW-8 as a replacement for CMW-2A. This action is required because several existing wells are becoming dry or have insufficient groundwater levels for necessary sampling. The project includes the construction of a small access road for installation and monitoring purposes, followed by the decommissioning of CMW-2A. The replacement is essential for maintaining compliance with California Code of Regulations Title 27 and Waste Discharge Requirements Order R5-2026-0007 to ensure the protection of public health and the environment. All work will be conducted within the current boundaries of the Coalinga Disposal Site and will not expand the existing use of the land.

General Info

Fresno County will install monitoring well CMW-8 and decommission CMW-2A at Coalinga Disposal.

Agency

California → Fresno County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

W. Lost Hills Rd and S Merced Ave, Coalinga, CA, 93210

Set-Aside

NONE

Documents

(1)

E2026/00026 Fresno County Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fresno County
Office AddressN/A
Contacts

Full Description

Show more
The proposed project consists of installing groundwater monitoring well CMW-8 to replace CMW-2A within the existing monitoring network at the Coalinga Disposal Site. A small access road will be constructed for installation and monitoring of CMW-8, and CMW-2A will be decommissioned after CMW-8 is installed. Several wells in the existing network are becoming dry or contain insufficient groundwater for required monitoring and sampling because of declining groundwater levels. CMW-8 is identified as a planned detection monitoring well in Waste Discharge Requirements Order R5-2026-0007. The replacement is necessary to maintain compliance with Finding 28 of the Order and California Code of Regulations, Title 27, Section 21720 et seq., for protection of public health and the environment. The work will occur within the existing Coalinga Disposal Site and will not expand the existing use.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse bond premiums. The solicitation specifically encourages quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms, and emphasizes the importance of maintaining labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 16 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details