General Info
Agency
California → City of Point Arena
NAICS
237990 - Other Heavy and Civil Engineering ConstructionView NAICS
Place of Performance
800, 820, 830 Port Road. At the terminus of Port Rd and Pacific Ocean, Point Arena, CA, 95468Set-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → City of Point Arena
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Point Arena
Office AddressN/A
Contacts
Interested Companies (1)
Show more
City of Point Arena
Fort Bragg, CA
Full Description
Show more
Coastal Development Permit (CDP 2025-4), Use Permit (UP 2025-1) and Variance (VAR 2025-1) to:
1) Establish a seasonal (May to October) ten-site low-cost campground in the Rockwall Property consisting of three RV parking spaces, a Campsite Managers RV, and seven tent camping spaces. This parcel was formerly utilized as a manufactured home park and is currently utilized for boat storage and event parking.
2) Demolition of an existing 550 SF restrooms in the Rockwall property and replacement of it with a 528 SF restroom/showers building to serve the campground. The new restroom would be in the same footprint as the existing restroom.
3) Removal of various abandoned heavy equipment from the Rockwall property which is located less than 50 feet from Arena Creek.
4) Demolition of a 400 SF existing shed in the Arena Cove parking lot and replacement with like for like new 400 SF metal shed; install a commercial ice machine inside the shed; and relocate the boat washing station from the north side to the west side of the shed.
5) Removal of the Citys 900 SF community recycling area from the Arena Cove parking lot and reuse this area for boat and fishing equipment storage.
6) A temporary storage and construction staging area for the Arena Pier Rehabilitation project. The staging area would be located on the western end of the Pier Parking Lot. This area would be fenced off for about 4 summer months during the pier rehabilitation project.
7) Installation of a new signage system for Arena Cove, including interpretive signs, safety signs, wayfinding signs, a sign for the Campground and a sign for Arena Cove Park.
8) Seasonal (summer) installation of short public access pedestrian ramp from edge of arena cove parking lot to the Arena Cove beach.
9) Installation of safety fencing and habitat protective fencing at Arena Cove Park.