Emergency Exit Pathway Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation is initiating the Emergency Exit Pathway Installation project at the California State Railroad Museum in Sacramento. The primary objective of this project is to upgrade an existing emergency fire exit egress to ensure full compliance with current fire and accessibility codes, specifically meeting ADA standards. This effort is categorized as a forecast project and has been granted a CEQA notice of exemption under Class 1 and 2. The scope of work involves the removal of twelve 2-foot by 2-foot concrete pads and soil excavation up to 6 inches deep. The contractor will install approximately 90 feet of 4-inch by 6-inch redwood lumber secured with 5/8-inch rebar pins. To complete the pathway, decomposed granite will be installed over a compacted Class A road base. The project is managed by the Associate Park and Recreation Specialist, Ileana Maestas.

General Info

ADA compliant emergency exit pathway installation at California State Railroad Museum in Sacramento.

Agency

California Parks and Recreation, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Second Street and "I" Street, Sacramento, CA

Set-Aside

NONE

Documents

(1)

CEQA #14515 Notice of Exemption - Emergency Exit Pathway Installation

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Ileana MaestasAssociate Park and Recreation Specialist

Full Description

Show more
The goal of this project is to upgrade an existing emergency fire exit egress at the California State Railroad Museum to an ADA compliant emergency fire exit egress to comply with fire and accessibility code. Project will: • Remove twelve (12) existing 2-ft x 2-ft concrete pads; • Excavate soil up to 6-in. deep; • Install approx. 90-ft of 4-in. x 6-in. redwood lumber pinned down with 2-ft long 5/8-in. rebar; and • Install decomposed granite over a compacted Class A road base.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details