R-2071 L-021E MP 97.26-97.35 Feliz Creek Crossing (Project) (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-67383-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-67383-R1C pursuant to Section 1602 of the Fish and Game Code. The agreement authorizes Steve Willoughby, representing Pacific Gas and Electric Company, to perform bank stabilization and pipeline recovery at Feliz Creek in Mendocino County, specifically near the community of Hopland. The project is categorized as a Class 4 categorical exemption under the California Environmental Quality Act. The scope of work involves a single encroachment to stabilize the south bank of Feliz Creek and recover one 12-inch and one 3-inch diameter pipeline. This will be achieved by placing approximately 865 cubic yards of Rock Slope Protection extending 300 feet upstream, 100 feet downstream, and 80 feet into the stream channel. Additional requirements include the in-kind removal and replacement of a storm water culvert and outfall, excavation, compaction, and the implementation of erosion control measures. Restoration efforts will consist of hydroseeding disturbed upland areas with a native seed mix and installing approximately 125 riparian plantings along the embankment.

General Info

PG&E will stabilize Feliz Creek banks and protect pipelines using rock slope protection.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

Place of Performance

approximately 11 miles south of the town of Ukiah,, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Jennifer GarrisonSenior Environmental Scientist Specialist
Steve WilloughbyPlease contact Jennifer Garrison of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-67383-R1C, pursuant to Section 1602 of the Fish and Game Code to Steve Willoughby (Permittee) representing Pacific Gas and Electric Company (PG&E). The Project is limited to one (1) encroachment to stabilize the south bank of Feliz Creek and re-cover two exposed pipelines (one 12-inch diameter and one 3-inch diameter) by placing approximately 865 cubic yards of Rock Slope Protection (RSP) along the bank and within the channel. The RSP will extend approximately 300 feet upstream and 100 feet downstream of the pipelines, and 80 feet into the stream channel. Heavy equipment will access the lower bank and stream channel from upslope to downslope, using the installed RSP. No other access to the creek will be required for the equipment to access the stream bank or channel. Work for this encroachment will include excavation, removal and replacement in-kind of an existing storm water culvert and outfall, to daylight beyond the RSP, compaction, and installation of erosion control measures. The disturbed upland areas will be hydroseeded with a native seed mix and approximately 125 riparian plantings will be installed along the embankment.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 7 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS