Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Douglas Drive Bridge Seismic Retrofit Project

Forecast
R9-2025-0161State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Oceanside is executing the Douglas Drive Bridge Seismic Retrofit Project, located at the San Luis Rey River in San Diego County. The primary scope of work involves increasing the structural stability of the bridge by constructing full-height infill walls between columns at Piers 4 through 12 to reduce movement during seismic events. Additionally, the project includes the installation of two fish passage flumes, a wildlife crossing, and the in-kind reconstruction of affected portions of Levee 3 and the San Luis River Trail. The project is governed by several regulatory approvals, including Lake and Streambed Alteration Agreement EPIMS-SDO-55909-R5 pursuant to Fish and Game Code section 1602 and Clean Water Act section 401 water quality certification R9-2025-0161. To offset environmental impacts, the applicant will implement a mitigation plan at the 2.28-acre El Corazon site, which includes establishing 0.07 acres and enhancing 0.02 acres of freshwater wetlands, restoring 0.26 acres of coastal sage scrub, and eradicating 0.04 acres of invasive riparian vegetation. The project has been cleared under the California Environmental Quality Act, with Notices of Determination issued by the California Department of Fish and Wildlife and the San Diego Water Board in late 2025.

General Info

Oceanside bridge seismic retrofit including fish passage, wildlife crossing, and environmental mitigation.

Place of Performance

Oceanside, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oceanside
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Keith YaegerEnvironmental Scientist
Kymberly CorbinProject Manager

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SDO-55909-R5), pursuant to Fish and Game Code section 1602, the project Applicant, the City of Oceanside. The project is the seismic retrofit of the Douglas Drive bridge and the installation of two fish passage flumes and a wildlife crossing. To compensate for the impacts associated with the Project, the Applicant will establish of 0.07 acres of freshwater wetlands, enhance of 0.02 acres of freshwater wetlands, restore of 0.26 acres of coastal sage scrub, eradicate of 0.04 acres of invasive riparian vegetation, and manage invasive vegetation in the 2.28-acre mitigation site at El Corazon.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure works. Key scopes of work include underground construction such as tunneling, boring, jacking, and micro tunneling; site preparation including land surveying, site clearing, shoring, and subgrade roadbed work; and environmental and support services including storm water pollution prevention (SWPPP), traffic control, and quality control. Required materials and services also include precast concrete, ready mix supply, cathodic protection, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for ADA Improvements at Cannonsburgh Village under solicitation number ITB-10-2027. The project scope involves establishing an accessible path from adjacent buildings to the visitors center toilets, which includes ramp modifications, hardscape improvements from the street to new accessible parking spaces, and minor interior toilet facility upgrades such as the installation of ADA grab bars and adjustments to fixtures and countertops. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Bids must be submitted via the OpenGov portal by November 19, 2026, at 8:00 PM CST. Key contractual requirements include a 5% bid security, with performance and payment bonds required for 100% of the contract sum from a Tennessee-licensed bonding company. The contractor must submit an initial construction schedule within 21 days of the award and a quality-control plan within 10 days of the Notice to Proceed. Liquidated damages for failure to achieve substantial completion are set at 500 dollars per calendar day. Bidders must provide a lump sum base bid, a 5% contingency allowance, and unit pricing for the demolition and repouring of exposed aggregate concrete sidewalk. Required submission documents include a bid bond, a contractor responsibility questionnaire, and various certifications regarding Tennessee licensing, drug-free workplaces, and international divestment acts.
Parks and Recreation

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237310
New
SLED
LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes
Solicitation # ITB2025-172CE
The City of Palm Beach Gardens, Florida, is soliciting sealed bids for the LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes (ITB2025-172CE). Funded through the Florida Department of Transportation's Local Agency Program, the project aims to enhance pedestrian and cyclist safety by constructing five-foot bicycle lanes on both the north and south sides of Gardens Parkway between Alternate A1A and Prosperity Farms Road, as well as an eight-foot-wide sidewalk on the south side between Fairchild Gardens Avenue and Prosperity Farms Road. The estimated contract value is 4,600,000 dollars, with a required completion timeframe of 410 calendar days. The contract will be awarded to the responsive and responsible bidder offering the lowest total aggregate price. The selected contractor must provide all labor, materials, and supervision in accordance with FDOT Division 1 specifications and OSHA safety standards. Key requirements include compliance with the Davis-Bacon Act for prevailing wages, Buy America sourcing preferences for steel and iron, and ADA accessibility standards. Bidders must submit a bid bond via surety bond, certified check, or cashier's check. Administrative requirements include invoicing via AIA G702 forms and payment through electronic methods per the Florida Prompt Payment Act. Bids are due by December 18, 2026, and must be submitted through the City's eProcurement Portal.
City Engineer

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → City of Oceanside

Same awarding agency

NAICS: 237110
SLED
Buccaneer Lift Station and Force Main Project
Solicitation # D23-00012
The City of Oceanside is seeking approval for the Buccaneer Lift Station and Force Main Project, which includes the construction of a new wastewater lift station and force main to redirect flow from the La Salina Wastewater Treatment Plant to the San Luis Rey Water Reclamation Facility. The project also encompasses upgrades to existing stormwater treatment infrastructure, the undergrounding of an electric distribution line, and the development of public amenities such as a parking lot, bike and pedestrian path, and enhanced site landscaping. These improvements are intended to modernize regional wastewater management, improve environmental compliance, and increase public access and recreational opportunities along the corridor. Approvals requested include a Development Plan, a Regular Coastal Permit, and a Conditional Use Permit to ensure all regulatory and land use requirements are met. The project is located in Oceanside, California, with a ZIP code of 92054, and is being spearheaded by the City of Oceanside through its planning and infrastructure departments. Primary contact for inquiries is Shannon Vitale, Principal Planner, who can be reached via email or phone, with additional coordination handled by Vanessa Toscano, Project Manager. The project was posted as a forecast on June 9, 2026, and is part of a broader initiative to enhance wastewater resilience, reduce environmental impact, and integrate sustainable community features into urban infrastructure. All necessary permits and environmental reviews are being pursued through the California Environmental Quality Act process as indicated by the provided CEQA Net link.
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
Oceanside Sewer Improvements ProgramThe Oceanside Sewer Improvements Program is a comprehensive infrastructure project managed by the City of Oceanside to construct, install, replace, and rehabilitate underground wastewater conveyance systems. The scope of work spans from the San Luis Rey Water Reclamation Facility to the terminus of the Oceanside Land Outfall at the La Salina Wastewater Treatment Plant. Key deliverables include the installation of 15,000 feet of 36-inch Oceanside Mesa Garrison Force Main, 10,000 feet of 24-inch Mission Avenue Lift Station Force Main, 700 feet of 22-inch HDPE bypass pipeline, 1,500 feet of 24-inch gravity main pipeline, and 1,000 feet of 24-inch gravity sewer with an inverted siphon crossing beneath Garrison Creek. Additionally, the project involves the construction of the new El Corazon Lift Station. Project activities include vegetation trimming, clearing, grubbing, grading, and excavation. While most pipelines will be installed using conventional cut-and-cover methods, trenchless installation is required for crossings beneath the San Luis Rey River, State Highway 76, Mission Avenue, and the Garrison Creek corridors. The project is subject to strict environmental compliance, including CEQA provisions, Clean Water Act section 401 water quality certification, and Fish and Game Code section 1602 under Lake and Streambed Alteration Agreement EPIMS-SDO-64984-R5. Approval for the project was granted by the San Diego Water Board on July 1, 2026, and by the California Department of Fish and Wildlife on September 4, 2026, with requirements for mitigation measures and a monitoring and reporting plan.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 562910
SLED
Eddie Jones Warehouse Manufacturing and Distribution Facility Project
Solicitation # 2022070365
The Eddie Jones Warehouse, Manufacturing and Distribution Facility Project involves the development of four buildings totaling 497,822 square feet of office, warehouse, and manufacturing space with 28 truck bays on a 31.79-acre site in Oceanside, California. A critical component of the project is the implementation of a Department of Toxic Substances Control approved Response Plan to remediate contaminants in shallow soils and soil vapor. This remediation includes the excavation and off-site disposal of approximately 3,920 cubic yards of impacted soils from depths of 3 to 12 feet, groundwater monitoring to assess contaminant trends and plume stability, and the recording of a Land Use Covenant to restrict the property to commercial use and prohibit the use of shallow groundwater. The project is governed by the California Environmental Quality Act and is subject to a Mitigation Monitoring and Reporting Plan. Key compliance requirements include adhering to SDAPCD Rule 55 for fugitive dust control, utilizing low-VOC coatings, and conducting nesting bird surveys within 72 hours of construction during breeding season. Additionally, the project requires archaeological monitoring by a qualified professional and adherence to stormwater pollution prevention best management practices. Post-occupancy requirements include participating in a San Diego Gas and Electric energy audit within one to two years of building occupancy.
Remediation Services

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 236220
SLED
Oceanside Transit Center Redevelopment
Solicitation # 2023010231
The Oceanside Transit Center Redevelopment project, managed by the City of Oceanside, involves the demolition of existing structures and the construction of a mixed-use transit-oriented community at 235 South Tremont Street, Oceanside, California. The development scope includes up to 849,495 gross square feet of construction, featuring 547 residential apartment units, a 170-room boutique hotel, a 64,085-square foot NCTD Headquarters building, a 7,427-square foot modern intermodal transportation center, and 29,196 square feet of retail and food and beverage services. The project also provides for up to 1,868 public and private parking stalls along with associated landscaping and open spaces. To facilitate this development, the City has approved several discretionary actions, including a General Plan Amendment, Zone Amendment, Local Coastal Program Amendment, and the adoption of the Oceanside Transit Center Specific Plan. The project is governed by CEQA compliance, with a certified Environmental Impact Report and an adopted monitoring plan to ensure mitigation measures are met. Additional regulatory oversight may be required from the San Diego Regional Water Quality Control Board for NPDES Construction General Permits and the San Diego Air Pollution Control District. The project was formally approved in late 2025, with official notices of determination filed in December 2025.
Commercial and Institutional Building Construction

POSTED

12 months ago

DEADLINE

N/A
View Details
NAICS: 562910
SLED
Pier View Way Bridges and Lifeguard Headquarters and Beachfront Facilities Phase II Project
Solicitation # RD23-00007
The Pier View Way Bridges and Lifeguard Headquarters and Beachfront Facilities Phase II Project, managed by the City of Oceanside under solicitation RD23-00007, is a comprehensive infrastructure initiative to improve public access and usability at the Oceanside Municipal Pier. The scope includes the reconstruction of the Pier Bridge and Lifeguard Headquarters, the construction of a new east Lifeguard Support Facility, and enhancements to the Junior Seau Beach Community Center, Amphitheatre, Bandshell, and pier plaza. Additionally, the project includes conceptual designs for Betty's Lot to support a new beachfront park with community recreation classrooms and accessible pathways. The estimated budget for the preferred reconstruction option is approximately 39.8 million dollars, covering demolition, structural reconstruction, MEP/FF installations, landscaping, and site lighting. The project is governed by a multi-phase execution strategy, moving from schematic and preliminary design through environmental review and final permitting before construction. Extensive environmental analysis has been conducted to ensure compliance with the California Environmental Quality Act, including a Program Environmental Impact Report that addresses air quality, greenhouse gas emissions, and coastal hazards such as sea level rise and tsunami risks. Technical specifications include a conceptual beachfront lighting plan, a storm water quality management plan, and detailed geotechnical and paleontological assessments. Due to the nature of the site, the contractor must meet stringent hazardous materials qualifications, including California Department of Public Health certifications for lead-related construction and licensed handling of PCB-related wastes. The project also emphasizes tribal consultation under Assembly Bill 52 to protect cultural resources and adheres to strict quality assurance and monitoring programs for all construction activities.
Remediation Services

POSTED

12 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS