Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Drainage and Infrastructure Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Drainage and Infrastructure Installation involves providing specialized installation services for Natural England facility projects. The scope of work includes the installation of two plastic culverts, the laying of geotextile membranes, and the placement of Type 1 sub-base materials. Additionally, the contractor is responsible for pouring concrete to create headwalls and foundations for gate and fence posts, ultimately delivering fully installed culverts and stabilized concrete bases. The project requires the contractor to supply all necessary plastic culverts, geotextile, and sub-base materials. To ensure safety and regulatory compliance, the contractor must provide a CDM compliant Risk Assessment and ensure a qualified first aider is present. Interested parties must submit their responses by November 27, 2026.

General Info

Documents

This scope was carved out of ocds-h6vhtk-0796c1.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Barrington Hill new gateway

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNatural England
ContactsNo contacts available
OfficeN/A
Organization / AgencyNatural England
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage systems and structural bases for prime contractors on Natural England facility projects. Installs two plastic culverts, lays geotextile membrane, installs Type 1 sub-base, and pours concrete for headwalls and gate/fence posts. Requires plastic culverts, geotextile, and Type 1 sub-base materials. CDM compliant Risk Assessment and qualified first aider required. Delivers installed culverts and stabilized concrete foundations.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of MWBE Good Faith Efforts and Table A documentation. Bidders must provide a bid bond, and the successful contractor will be required to furnish performance and payment bonds, along with insurance from companies rated A-VII or better by A.M. Best. Performance is governed by EJCDC standard forms, specifically the C-700 General Conditions and C-800 Supplementary Conditions. Payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Work must adhere to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project, solicitation ITB-2026141, is an infrastructure initiative for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, a standby generator, site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder registered in the Commonwealth of Virginia. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract amount, compliance with Davis-Bacon wage determinations, and adherence to OSHA and ADA standards. Bidders must provide at least three references for similar projects and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 6 days
View Details

More opportunities from Natural England

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS