Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Drainage Crossing (Water-Gap) Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Interior → National Operations CenterView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CO

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Operations Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → National Operations Center
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install water-gaps to allow natural drainage while maintaining fence integrity, preventing erosion and complying with environmental standards.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of The Interior → National Operations Center

Same awarding agency

NAICS: 238220
New
Federal
Z--HVAC Replacement at Jupiter ONA - Unit B, Tindall
Solicitation # 140L0626Q0018
The Bureau of Land Management, under the Department of the Interior, is seeking a small business to perform an urgent replacement of HVAC systems across three structures within the Jupiter Inlet Lighthouse Outstanding Natural Area in Jupiter, Florida—specifically the Unit B Administration Building, Tindall House, and Tindall Kitchen. This is a firm-fixed-price, lump-sum solicitation issued as an electronic Request for Quotations under the Small Business Set Aside program, with a strict deadline for submissions on August 11, 2026. The acquisition follows Lowest Price Technically Acceptable procedures, meaning technical acceptability serves as a pass/fail gate while award is determined solely by the lowest evaluated price from qualified offerors. The contractor must furnish all labor, materials, equipment, supervision, transportation, and permits necessary to remove existing units and install new systems: a 4-ton unit in Unit B and 2-ton split systems with attic air handlers and condensers on existing pads at Tindall House and Tindall Kitchen. All equipment must meet current ASHRAE and DOE efficiency standards, be hurricane-strapped per Florida Building Code, and comply with the Davis-Bacon Act Wage Determination FL20260079. The work must be completed within 15 calendar days of contract award, beginning no later than 10 days after notice to proceed. All proposals must include detailed information on the proposed equipment manufacturer, model, capacity, and efficiency rating; a clear installation schedule; valid equipment and workmanship warranties; and any assumptions or exclusions. Offerors must demonstrate compliance with the Performance Work Statement and provide proof of insurance meeting DIAR 1452.228-70 requirements, including minimum coverage of $500,000 general liability, $200,000 automobile liability per person, $500,000 bodily injury per occurrence, $20,000 property damage per occurrence, and $100,000 workers’ compensation. The contractor is required to submit a complete SF-1442 form with the lump-sum price in Item 17, ensuring all costs are inclusive of every element of the work. Additionally, all offerors must maintain current Representations and Certifications in SAM, adhere to Buy American provisions for construction materials, comply with prohibitions against internal confidentiality agreements that restrict reporting of waste or fraud, and follow DEI discrimination clauses. Payment will be processed electronically via the U
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Federal
Y--GARNET HILL RECREATION AREA CONSTRUCTION
Solicitation # 140L0626B0006
The U.S. Department of the Interior, through the National Operations Center in Denver, Colorado, is soliciting bids for the Garnet Hill Recreation Area Construction project in White Pine County, Nevada, approximately six miles west of Ely. This total small business set-aside under FAR 19.5 is designated for NAICS code 237990, with a small business size standard of $45 million, and is restricted to qualifying small businesses. The solicitation, issued as an Invitation for Bid (IFB), requires all offerors to maintain an active registration in SAM.gov with a valid Unique Entity ID (UEI) at the time of submission. The contract involves comprehensive improvements to access roads, trailheads, campgrounds, parking areas, picnic sites, vault toilets, signage, and ADA-accessible amenities, supported by detailed civil, topographic, and site-specific drawings including demolition, grading, and road plan sheets, with specifications organized under the CSI/CSC Masterformat system. Deliverables include a subcontract list, field condition reports, operation and maintenance manuals, and a quality control plan that must be submitted for approval prior to construction, though its associated costs are to be included in the bid price without separate payment. The work must be completed by December 2027, with milestones tied to the notice to proceed, substantial completion, and final completion dates. Contractors are required to comply with stringent material handling and storage protocols, including labeled and tested steel reinforcement stored elevated and protected from contamination, and waterstops kept under cover from environmental damage. All welding must be certified through AWS-compliant procedure specifications and qualification records, and manufacturers must provide written certifications of compliance on official letterhead. A stormwater pollution prevention plan must be prepared in accordance with local and contractual requirements, and daily site cleaning following NFPA 241 standards is mandatory. Life safety systems cannot be disabled without seven days’ prior written notice to the owner. Submittals must conform to strict electronic formatting: submitted as a single indexed PDF package with a transmittal form and labeled files containing project name, date, and firm identification, while hard copies of manuals must be bound in white, commercial-quality, vinyl-covered, 3-ring loose-leaf binders. Bonding requirements include bid, performance, and payment bonds, and key personnel roles must be clearly designated. The contracting officer, Lisa McKeon, must be contacted via email for all submissions, with proposals due no later than August 5, 2026.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Federal
GAOA VALE DISTRICT OFFICE BUILDING RENOVATIONS D-B
Solicitation # 140L0626R0009
The U.S. Department of the Interior’s Bureau of Land Management, through its National Operations Center, is seeking industry input for the design-build renovation and addition of the BLM Vale District Office located at 100 Oregon Street, Vale, Oregon. This pre-solicitation under solicitation number 140L0626R0009 targets commercial and institutional building construction services under NAICS code 236220 and is structured as a design-build procurement, with an anticipated notice to proceed in December 2026 and full performance completion expected within 720 days thereafter. The project includes the renovation of a 16,320-square-foot existing single-story office building and the addition of a 1,051-square-foot front extension, along with associated site work, utility upgrades, topographical and geotechnical surveys, and inventory of government-owned systems furniture stored in Troutdale and Vale, Oregon. Design deliverables must adhere to progressive phases—Pre-Design, Schematic Design, Design Development, and Construction Documents—with draft submissions at each stage required to be 70 to 80 percent complete and fully coordinated to enable meaningful government review. All design and construction must comply with the 2024 International Building, Plumbing, and Mechanical Codes, ASHRAE 90.1-2019 Appendix G for energy modeling, the US National CAD Standard for drawings, and AWS D1.1 for structural steel welding. The contractor must also meet indoor air quality standards using SMACNA guidelines, install CAT 6 telecommunications infrastructure, and incorporate ADA and ABA accessibility requirements into all site elements, signage, and ramps. Contractors are required to submit comprehensive documentation including MasterFormat-organized specifications, coordinated design and construction schedules, as-constructed drawings, and an operations and maintenance manual upon project closeout. Monthly reporting is mandated via a concise one-page email update to the Contracting Officer, Contracting Officer’s Representative, and technical representative, detailing the status of all work tasks as started or complete. Additionally, a Microsoft Teams collaboration site must be established for communication. Daily quality control reports must be maintained by the Quality Control Supervisor, and all test reports must be completed by the individuals performing the tests, subject to government-directed testing locations. The contractor assumes full responsibility for temporary climate control until final acceptance, must install new air filters prior to final inspection, and ensure equipment warranties commence only after final acceptance. Bid, performance, and payment bonds are
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details