This Subcontract opportunity from Department Of Defense was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dredging and Channel Modification

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
PWC Mosquito ADA Fishing Pier
Solicitation # SRC0000042902
The Ohio Department of Natural Resources is soliciting bids for the replacement and installation of an ADA-compliant fishing pier at Mosquito Lake State Park. The project requires the fabrication, delivery, and installation of a modular aluminum dock system, which includes a gangway, a 40 by 8 foot main walkway, and a 40 by 8 foot fishing extension. The contractor is responsible for providing all labor, materials, and equipment, and must remove existing old structures and debris from the site. All components, including handrails and fishing benches, must conform to ADA requirements. Work is scheduled to commence on December 1, 2026, with a final completion and delivery deadline of April 30, 2027. The contract will be awarded to the lowest responsive and responsible bidder based on the low lot total, calculated by multiplying unit costs by estimated usage. To be deemed responsive, bidders must provide quotes for all items. The selected contractor must maintain a performance bond and insurance from a provider with an A.M. Best rating of A or better and a financial size of VII or better. Additionally, the contractor must comply with Ohio ethics laws, maintain financial records according to Generally Accepted Accounting Principles, and provide a signed Affirmation and Disclosure Form regarding the location of services and data.
Dnr353411 Mosquito Lake State Park Dnrtru

POSTED

about 10 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
The Cayuga Inlet Flood Risk Reduction and Restoration project, identified as Project No. 46108-C, is a unit price construction contract issued by the New York State Department of Environmental Conservation and the Office of General Services. Located at 900 Taber Street in Ithaca, New York, the project has an estimated value between 23 million and 24 million dollars. The primary scope of work involves comprehensive environmental remediation and construction, specifically focusing on hydraulic dredging, earthwork for the preparation of a site management facility cell, and the establishment of staging and laydown areas. Key technical requirements include the use of geotextile tubes for dewatering, the implementation of a marine traffic control plan, and strict adherence to USACE and APWA standards for surveying and utility marking. Bids are submitted via Bid Express, with the contract awarded to the apparent low bidder based on responsiveness and responsibility, including an evaluation of financial data and past performance on similar projects. Bidders must provide bid security of 599,200 dollars, and the successful contractor is required to furnish performance and labor and material bonds for 100 percent of the contract amount. The project mandates compliance with New York State prevailing wage schedules, MWBE-EEO guidelines, and specific safety certifications for the transport of hazardous materials like calcium oxide. Deliverables include pre-construction and progress bathymetric surveys, daily dredge reports, and detailed waste manifests for disposed materials.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Dothan All-Wheel Park
Solicitation # 271007
Bid 271007 is a solicitation by the City of Dothan for the construction of the Dothan All-Wheel Park located at 100 Recreation Road, Dothan, Alabama. The project scope includes the development of a BMX Pump Track and a Freestyle Park, along with comprehensive site improvements such as grading, landscaping, site lighting, parking lot enhancements, and the installation of connecting sidewalks and pedestrian pathways. A critical requirement for the project is that the General Contractor must employ a specialty construction subcontractor who is a USA BMX-approved builder to handle the construction of the BMX facilities. The procurement follows a two-stage process beginning with pre-qualification proposals, which were due by November 23, 2026, in three hard copies and one digital copy on a USB flash drive. Only General Contractors licensed under the State Licensing Board for General Contractors per the Code of Alabama, 1975, are eligible. Following pre-qualification, sealed bids for the base project and alternates are due by December 17, 2026, at 2:00 PM CST. Bidders must provide a cashier's check or bid bond of at least 5 percent of the bid amount, capped at 10,000 dollars. A mandatory pre-bid conference was scheduled for December 3, 2026. Upon contract signing, the selected contractor must provide performance and payment bonds, insurance, and immigration documentation in compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act.
City of Dothan

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Milpitas Sports Center Football Bleacher Replacement
Solicitation # 26-283
The City of Milpitas is soliciting bids for Project No. 3505, the Milpitas Sports Center Football Bleacher Replacement. This project involves the demolition and removal of existing football bleachers and footings, followed by the construction of new home bleachers and various site improvements. The scope of work includes earthwork, grading, erosion and sediment control, concrete work, electrical conduit routing and relocations, and the installation of fencing and gates. Additionally, the project requires comprehensive ADA upgrades to parking areas, restrooms, and access ramps. The engineer's estimate for the base bid is between $1.2 million and $1.4 million, with a required completion timeframe of 330 calendar days from the Notice to Proceed. Eligible bidders must hold a Class A contractor license and comply with California prevailing wage laws for Santa Clara County. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid alone. Submission requirements include a 10% bid security, a noncollusion declaration, and certification of registration with the Department of Industrial Relations. The successful contractor must self-perform at least 40% of the work. Project administration includes progress payments at 95% of the City's estimate with a 5% retention, contingent upon the submission of updated CPM schedules and construction photographs. Liquidated damages for delays are set at $4,200 per day.
Engineering (CIP)

POSTED

about 14 hours ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
Lewis Park Improvements
Solicitation # 2026-IFB-222
Solicitation 2026-IFB-222 is an invitation for bids issued by the City of Pittsburgh Department of Public Works for a general contractor to perform improvements at Lewis Park in Hazelwood. The scope of work includes the construction of two basketball courts, a playground area, a pavilion, and greenspace. Base bid activities encompass staking, demolition, site preparation, grading, concrete and asphalt work, site furnishings, pavilion installation, and backfill and seeding. The project also includes several alternates for the installation of trees, trash and recycling receptacles, general landscape plantings, and an upgrade to six-inch concrete for vehicular access. The contractor is responsible for coordinating the installation of owner-supplied items, including the pavilion, spray features, safety surfaces, and playground equipment. The contract will be awarded to the lowest responsive and responsible bidder on a lump sum basis. Bids must be submitted electronically via OpenGov by November 16, 2026, at 2:00 pm. Required submission documents include a Vendor Questionnaire, a Schedule of Values following the provided template, a Vendor Contact Sheet, a Vendor Registration Form, and an EORC Participation Form. The City has established specific participation goals for disadvantaged business enterprises, including 18 percent for MBEs, 7 percent for WBEs, 5 percent for Veteran-Owned Small Businesses, and 3 percent for LGBTQIA+ businesses. Performance is subject to strict compliance with Pennsylvania prevailing wage rates and certified payroll requirements. Post-award requirements include the submission of a performance bond equal to 100 percent of the contract price, a payment bond, and current certificates of insurance. The City intends to pay invoices within 45 calendar days of receipt, provided they are submitted within 30 days of work completion and include the necessary purchase order and controller numbers. All work must adhere to the provided bid drawings and meet industry standards, with final acceptance contingent upon a pre-final inspection and the completion of a deficiency punch-list.
Public Works

POSTED

about 16 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
2026008-RFP3819 RIVERWOOD PARK
Solicitation # 2026008-RFP3819
Columbia County, Georgia, is soliciting bids for the construction of Riverwood Park under solicitation number 2026008-RFP3819. The project requires a General Contractor to provide all labor, equipment, materials, and supervision to execute a comprehensive scope of work including site demolition, clearing, grading, and the construction of facilities. Key deliverables include the installation of play structure assemblies, splash pad equipment and plumbing, mountain biking trails, concrete paths, parking lots, site lighting, furnishings, and landscaping improvements. The project must be completed within 480 consecutive calendar days following the notice to proceed, with liquidated damages set at 1,000 dollars per day for delays. Bidders must submit a Non-Collusion Affidavit, a list of at least five clients for similar projects of comparable size and complexity, and a comprehensive list of all major subcontractors. The base bid includes a general allowance of 500,000 dollars covering overhead and profit. Several deductive alternates are available, including sports field lighting, sand cap and sod, toddler play equipment, bonded rubber surfacing, a slide mound, and mountain bike trails. Bids must remain valid for 60 calendar days after the closing date, and the successful bidder must execute the formal contract and provide surety bonds as required by AIA 101 and AIA 201 standards within 10 days of acceptance.
Columbia County

POSTED

about 16 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

This subcontract for the Department of Defense under the USACE Galveston District involves the widening and deepening of the main Houston Ship Channel. The project focuses on the section between Boggy Bayou and Sims Bayou, where the navigation channel will be widened to approximately 530 feet and deepened from -41 feet to -46.5 feet. The contractor will utilize bathymetric surveying equipment and cutterhead, hopper, or suction dredges to meet specific USACE dredging specifications. This opportunity, categorized under NAICS code 237990, requires a response by October 9, 2026, to deliver a fully modified and deepened navigation channel in Houston.

General Info

USACE subcontract to widen and deepen Houston Ship Channel by October 9, 2026.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Houston, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of W912HY27RA001.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs widening and deepening of the main Houston Ship Channel for prime contractors on USACE Galveston District projects. Widens the channel to approximately 530 feet and deepens the navigation channel from -41 feet to -46.5 feet between Boggy Bayou and Sims Bayou. Utilizes cutterhead, hopper, or suction dredges and bathymetric surveying equipment per USACE dredging specifications. Delivers a widened and deepened navigation channel.

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou
Solicitation # W912HY27RA001
The Houston Ship Channel Expansion Channel Improvement Project 11, Package 9, Segment 4 is a negotiated, unrestricted Firm-Fixed-Price contract issued by the US Army Engineer District Galveston. Located in Harris County, Texas, the project focuses on widening the main channel to approximately 530 feet and deepening it from -41 feet to -46.5 feet between Boggy Bayou and Sims Bayou. The scope of work includes new-work dredging, the removal of abandoned pipelines and a steel bulkhead, and the completion of dredged material placement areas at Beltway 8, East Clinton, and West Clinton. The estimated contract value ranges between 100 million and 250 million dollars. The contract is structured with a base period of 477 days and five options, extending the total potential duration to 603 days. Award will be based on the Lowest Price Technically Acceptable (LPTA) procedure, evaluating technical approach, schedule, and past performance. Contractors must provide performance and payment bonds, adhere to Davis-Bacon Act wage standards, and comply with DFARS cybersecurity requirements for handling controlled unclassified information. Final acceptance of dredging work is determined by government-performed hydrographic surveys, while the contractor is responsible for continuous quality control and the management of temporary discharge pipelines.
Other Heavy and Civil Engineering Construction

POSTED

about 18 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
Federal
FY27 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS
Solicitation # W912HY27BA011
Solicitation W912HY27BA011 is a total small business set-aside issued by the US Army Corps of Engineers, Galveston District, for improvements to Placement Areas 10 and 13 in Cameron County, Harlingen, Texas. The project scope includes clearing and grubbing of existing dikes, the construction of semi-compacted containment dikes using onsite borrow materials, and repairs to drop-inlet structures. Specific requirements for Placement Area 13 include the construction of a revetment for the drop-inlet structure, while optional tasks for Placement Area 10 include the repair of its drop-inlet structure and the construction of a splash pad. The estimated contract value ranges between 1 million and 5 million dollars, with a final delivery date of January 7, 2028. The contract will be awarded to the low offeror based on the lowest aggregate amount for the base bid and prioritized additive or deductive items, with performance risk evaluated via the Supplier Performance Risk System. Technical standards include adherence to AWS D1.1/D1.1M for welding and MIL-DTL-24441 for epoxy-polyamide paint. Contractors must utilize Wide Area WorkFlow for electronic invoicing and comply with prevailing wage requirements and Buy American construction material standards. Bids must be submitted by November 30, 2026, in searchable PDF format, and must include a bid guarantee of a percentage of the offer or 3 million dollars, whichever is less.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS