Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Connecticut was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dry Zinc Orthophosphate Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 325314
SLED
Gemperle Family Farms Manure Pelletizing Facility
Solicitation # CUP24-014
Gemperle Family Farms is constructing and operating a manure-based fertilizer pelletizing facility on an 8-acre portion of a 40.55-acre property in unincorporated Merced County, California. Under Conditional Use Permit CUP24-014, the project will centralize poultry manure from applicant-owned farms to produce stabilized, pelletized organic fertilizer for commercial sale. The facility consists of three primary buildings totaling approximately 162,000 to 166,000 square feet, including a 90,000 square foot manure storage building with odor minimization, a 39,000 square foot processing plant equipped with a fire-sprinkler system, and a 37,000 square foot bulk pellet storage warehouse connected by a conveyance system. Supporting infrastructure includes internal driveways connecting Fowler Road and Johnson Road, parking with ADA compliance, and low-intensity exterior lighting. The project is subject to a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program to address impacts on biological resources, specifically nesting birds and Swainson's Hawks, as well as cultural resources and construction noise. Construction is anticipated to take 12 months. Operational schedules range from an initial four days per week to a peak capacity of 24-hour operations six days per week. The project is overseen by the Merced County Community and Economic Development Department, with regulatory coordination involving the San Joaquin Valley Air Pollution Control District and the State and Regional Water Resources Control Boards. Hazardous fertilizer amendments will be stored in exterior silos according to applicable safety regulations.
California Merced County of, Community and Economic Development Department

POSTED

about 1 month ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract calls for the supply of dry zinc orthophosphate in 50-pound bags, with an annual requirement of 4 to 8 tons, to be used for corrosion control within water distribution systems. The material must be delivered in specified packaging and meet the technical standards necessary for effective and safe application in municipal water infrastructure. This is a subcontract under the Water and Sewer agency of Connecticut, with the solicitation posted on May 8, 2026, and responses due by May 22, 2026. The North American Industry Classification System code 325314 indicates the product falls under inorganic chemical manufacturing, emphasizing the industrial nature of the supply. The place of performance and delivery details are not fully specified, but the procurement is managed through the Town of Manchester’s procurement portal, suggesting local implementation and oversight. No set-aside provisions or specific point of contact information are provided, indicating a general open solicitation for qualified suppliers.

General Info

Supply of 4-8 tons dry zinc orthophosphate for corrosion control in water systems.

Documents

This scope was carved out of 25/26-59.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CHEMICALS FOR WATER DEPARTMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Water and Sewer
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → Water and Sewer
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of dry zinc orthophosphate in 50 lb bags (4–8 tons annually) for corrosion control in water distribution systems.

More opportunities from Connecticut → Water and Sewer

Same awarding agency

NAICS: 237110
SLED
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation # 26/27-17
The Town of Manchester, Connecticut, is soliciting proposals for solicitation number 26/27-17 to furnish and install inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The scope of work includes the repair of the trough discharge point, including all necessary piping, fittings, supports, and seals to ensure a watertight and serviceable discharge consistent with previously repaired siphons. All materials used must be equal or superior to those used on Siphons 2 and 4 and must be NSF/ANSI 61-compliant for potable water service. The project requires a phased approach where Siphon 1 must be tested and operational for one week before work begins on Siphon 3. Proposals are due by November 17, 2026, via the OpenGov portal. The award will be based on a weighted evaluation of price (50%), project schedule (25%), and familiarity with the Globe Hollow Water Treatment Plant (25%). Bidders must provide a bid bond or cashier's check for 5% of the total bid and must be prepared to provide performance and labor and materials bonds equal to 100% of the contract price upon award. Compliance with Connecticut prevailing wage laws and OSHA 10-hour construction safety certification for all employees is mandatory. Required submission documents include a current W-9, SAM registration number, FEIN/EIN, a five-year project history, and a detailed project approach.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS