This Government Contract opportunity from Department Of Commerce was posted on November 9, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The National Oceanic and Atmospheric Administration is soliciting proposals for the dry docking and comprehensive repairs of the NOAA Ship NANCY FOSTER, a 186-foot vessel homeported in Charleston, South Carolina. The scope of work includes base requirements such as hull preservation, main engine top end overhauls, Z-drive propeller shaft renewals, and ABS special surveys, along with various option items including tank coating repairs and oceanographic winch installation. The project will be executed as a firm fixed price contract awarded to the best value offeror, requiring bid, performance, and payment bonds, and including a liquidated damages clause.
Performance is scheduled to take place at the contractor's facility for approximately 56 calendar days, starting around January 5, 2016, and concluding by March 1, 2016. This unrestricted procurement falls under NAICS code 336611. Interested parties must be registered in the System for Award Management and provide a DUNS number. The acquisition process is managed via the Federal Business Opportunity website, with the final award anticipated by December 7, 2015.
HighAI Summary for 002-4001-01 Rod End Spacer Ring for 1.75 TM Tiller - Rudder: Technical drawing and specification sheet for a Rod End Spacer Ring (DWG NO. 002-4001-01), including precise dimensional tolerances, angular specifications, and engineering approvals dated March 25, 2002, with a correctness verification date of February 12, 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ABS Review Letter - Nancy Foster Doppler and Multibeam Installation: Dated November 11, 2014, this letter from ABS Americas confirms the review and approval (as amended) of installation drawings for the DSN-450 Doppler Speed Log and EM710 Multibeam Echo Sounder for the vessel 'NANCY FOSTER' (Hull #290). The approval is contingent upon compliance with ABS Rules for Building and Classing Steel Vessels Under 90 meters and includes a specific comment (E-001) regarding IP ratings for electrical equipment enclosures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-240-1 Propulsion Shafts and Propellers: Standard Specification AMC-240-1 (September 1990) for the National Oceanic and Atmospheric Administration (NOAA) Atlantic Marine Center. This document outlines the general requirements, technical procedures, and inspection standards for the removal, installation, and repair of propulsion shafts and propellers on NOAA ships, including specific requirements for FRP shaft coverings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-300-1 Overhaul of Electrical Rotating Machinery: Standard Specification AMC-300-1 (September 1988) for the National Oceanic and Atmospheric Administration (NOAA) Atlantic Marine Center. It defines the general requirements, procedures, and technical standards for overhauling electrical motors and generators on NOAA ships and boats, including detailed instructions for removal, cleaning, inspection, and electrical testing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-573-1C Testing of Davits and Weight Handling Gear: Standard Specification AMC-573-1C (October 1996) from the NOAA Atlantic Marine Center. It establishes general requirements and mandatory procedures for testing davits, cranes, A-frames, and other weight handling gear on NOAA ships, including pre-test inspections, electrical/hydraulic measurements, and specific proof load testing protocols (100%, 125%, and 150% loads).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-581-1A Inspection and Preservation of Ground Tackle: Standard Specification AMC-581-1A (September 1992) for the National Oceanic and Atmospheric Administration (NOAA) Atlantic Marine Center. It defines technical requirements for the removal, sandblasting, inspection, preservation, and marking of anchors and anchor chains. The document includes specific wire diameter and six-link dimensional inspection criteria, a detailed anchor chain measurement table, and precise coating and marking instructions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-602-1 Standard Specification: Weight Test Data Plates: A September 1993 standard specification from the NOAA Atlantic Marine Center (AMC-602-1) detailing requirements for weight test data plates used on boats and weight-handling equipment. It specifies materials (corrosion resisting steel), dimensions (6x4 inches), and provides two design layouts for recording safe working loads and test loads.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-635-1 Thermal Insulation for Piping: NOAA Atlantic Marine Center Standard Specification AMC-635-1 (October 1989) outlines general requirements for renewing and installing thermal insulation on piping and tubing for NOAA ships. It includes detailed material standards (MIL-spec), installation procedures for hot piping, and requirements for removable covers on valves and flanges.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for AMC-635-2 Thermal Insulation for Compartments: NOAA Atlantic Marine Center Standard Specification AMC-635-2 (October 1989) detailing general requirements for renewing and installing thermal insulation on NOAA ships. It specifies material standards (MIL-specs for fiberglass and adhesives), installation methods for studs and vapor barriers, and provides technical guidance for insulation on beams, frames, and stiffeners.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0001 - EA-133M-15-RP-0119: Amendment 0001 to solicitation EA-133M-15-RP-0119 provides answers to vendor questions, incorporates missing technical drawings, manuals, and standard specifications, deletes item 506, and revises Section B (Price) and Section G (GFP list). It specifies a deadline for further questions as August 27, 2015.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0002 to Solicitation EA133M-15-RP-0119: Amendment 0002 dated 09/01/2015 for solicitation EA133M-15-RP-0119 issued by NOAA/ERAD. This document provides clarifications to prospective offerors via a Q&A format, specifically addressing tank capacity/location plans and correcting a part number for bushings in paragraph 7.12.5.1.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 - EA-133M-15-RP-0119: Amendment 0003 to solicitation/contract EA-133M-15-RP-0119. This document provides formal responses to three technical questions regarding crankshaft deflection measurements, the timing for re-torquing head bolts and rocker assembly bolts, and the installation locations for Markey DESH-5 and COM-15 winches and foundations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Anchor Windlass Fritz Culver Model FCWH-6 Technical Manual: NAVSEA Technical Manual (S9581-BP-MMA-010) dated 30 June 1989 for the Fritz Culver Model FCWH-6 Anchor Windlass installed on the 186-foot Torpedo Test Craft (YTT). The document provides comprehensive instructions for description, operation, installation, maintenance, and repair, including troubleshooting and illustrated parts breakdowns.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bilge and Ballast System Specifications: Technical specifications and general notes for a Bilge and Ballast System. The document includes piping requirements, material standards (A.O.C. and U.S.C.G.), a bill of materials, and references to isometric spools and piping diagrams. It contains critical technical details regarding pipe welding, tank level indication, and material finishes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Booklet of General Plans - Nancy Foster: Technical specifications and general plans for the vessel Nancy Foster, based on a shipcheck conducted in October 2002. The document includes general notes, a list of abbreviations, drawing references, and detailed technical specifications for pipework, valves, and fittings, as well as plan views for the hold, Foc's Lee Deck, and Bridge Deck.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Deck Tie Down Drawing NF-611-001: Technical drawing and specifications for a standard deck sock installation and deck tie down, dated September 28, 2005. Includes drill diameters, material specifications (3/4 inch ABS Grade A Steel), and welding details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 101-6500833 Model E [structural]: Technical drawing for Model E [structural], identified as Drawing 101-6500833. The document contains structural specifications for examination purposes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 101-6500837 Aft Focsle House Module (Module J): Technical drawing and specification document dated July 2023 for the Aft Focsle House Module (Module J). It includes Philips LED lighting specifications, parts lists with dimensions and weights, safety warnings, and detailed engineering sections (e.g., Section 3-G, 6-F, 5-D) and deck plans for the module.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 102-MS Watertight Door: Technical drawing and specifications for a Watertight Door (Drawing 102-MS). The document provides technical details necessary for procurement and manufacturing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 109-MS Watertight Door Quick Acting Lever: Technical drawing and specifications for a 109-MS Watertight Door Quick Acting Lever.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 211-MS Watertight Flush Hatch: Technical drawing and material schedule for a Watertight Flush Hatch assembly produced by Cen-Tex Marine Fabricators, Inc. The document includes a detailed parts list and a schedule of materials specifying components made from mild steel, stainless steel, neoprene, and other alloys.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 214-MS Watertight Spring Assist Raised Hatch with Dogs: Technical drawing and material schematic for a Watertight Spring Assist Raised Hatch with Dogs, produced by Raytech Corporation. The document includes a detailed material list (ranging from mud steel to teflon and forged steel) and references multiple plan and section views (A-A through F-F) for the clear opening.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing 601130 - Zinc Anode Installation (USN Discovery Bay CITY-11): Technical drawing and installation specifications for zinc anodes on the USN Discovery Bay (CITY-11). The document includes detailed notes on fabrication, welding, inspection standards (MIL-STD), and specific installation locations between frames 18 and 19, as well as requirements for licensed electricians and material disposition.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing C32734-1 DESH-5 Winch: Technical drawing and specifications for a DESH-5 Winch, featuring a dual gear range clutch lever and drum capacity for 6,000 meters of cable. Includes performance data from August 25, 1994, and weight specifications of approximately 13,250 lbs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing C32827 DESH-5 Winch Bolting and Sill Plan: Technical drawing C32827 detailing the bolting and sill plan for DESH-5 Winch, including specific measurements, holdown bolt drilling requirements, and a reference to outline drawing C-32734.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing C34842 DESH-5 Turntable: Technical drawing and specification document for the DESH-5 Turntable from Seattle Washington Marine Supply Co. Includes outline and sill plan details, assembly instructions for the winch adapter plate and deck plate, and certification of installation by R. Williams dated 11/23/04.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing D42144 DESH-5 Assembly Turn Table: Technical drawing and documentation requirements for the DESH-5 Assembly Turn Table, specifying standards for labels, dimensions, legends, and figure identification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing D42144 DESH-5 Turntable: Technical detail drawing for the DESH-5 Turntable (Drawing D42144), containing assembly part lists, dimensional annotations, and 3D rendering notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawing NF-100-004 Starboard Exhaust Stack Modification: Technical engineering drawing (NF-100-004) from the NOAA Marine Engineering Division for the Starboard Exhaust Stack Modification on the ship Nancy Foster. The document includes detailed schematics, removal and modification instructions, and rigging specifications for the exhaust stack and fume hood exhaust fan.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for DSN-450 Doppler Speed Log Installation Drawing: Technical installation drawing and specifications for the Syqwest DSN-450 Doppler Speed Log for the NOAA Office of Marine and Aviation Operations. The document includes general installation notes, a detailed list of materials (including transducers, cables, and hardware), and technical requirements conforming to ABS and USCG standards.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for EA-133M-15-RP-0119 Section G - Contract Administration Data: Section G of contract EA-133M-15-RP-0119 outlines contract administration data, including the authority of the Contracting Officer, the designation of Richard Holley as the Contracting Officer's Representative (COR), and a detailed list of Government Furnished Property (GFP) including tools, seals, and winches. It also specifies the method of payment based on percentage of completion and provides detailed invoicing instructions for ship repair.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for EHSS Model PA2-1.75-35-CB2 Operation and Service Manual - m/v Nancy Foster: Revision 2 of the Operation and Service Manual for the Electro Hydraulic Steering System (EHSS) Model PA2-1.75-35-CB2 installed on the m/v Nancy Foster. The document provides detailed technical specifications, including torque ratings, working pressures, and recommended oils, as well as operational procedures for normal and emergency steering, local and bridge control configurations, and a system maintenance schedule.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for EM710 Multibeam Echo Sounder Installation: Technical drawing and specifications for the removal of the Kongsberg EM1002 system and the installation of the Kongsberg EM710 Multibeam Echo Sounder system for NOAA. Dated April 2020, the document includes general notes on workmanship, material requirements (ASTM A-36 steel), a detailed list of materials/GFE, and installation plans for the transceiver unit and fairings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Forecaster Deck and Plot House Key Plans: Technical drawing specifications and key plans for a Forecaster Deck and Plot House, including bridge deck plans (Module H). The document contains detailed dimensions, material notes (e.g., deck stiffeners), revision histories, and technical legends for heavy duty, general, and forklift areas. It includes specific section views (A-A, B-B) and structural details dated between 2005 and 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Freeman Marine Equipment Model 1610 Door Product Layout: Technical product layout and specification sheet for the Model 1610 Standard Duty Individual Dog French Door by Freeman Marine Equipment, Inc. The document provides dimensional data for overall, clear, and rough openings, as well as specific measurements for glass and handle placement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for GoodCrane Model 40KSC10000 Technical Manual: Technical manual and specifications for the GoodCrane Model 40KSC10000 40 ft knuckle boom crane for NOAA. The document includes detailed technical specifications (10,000 lbs max rating), material standards (ASTM A514/A36), hydraulic system details, lubrication requirements, and critical safety warnings regarding counterbalance valves.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Halon 1501 Fire Suppression System Technical Specifications: Technical specifications and engineering drawing notes for the Halon 1501 Fire Suppression System. The document includes material specifications, connector service life requirements, pipe thread dimensions (NPT), and drawing scale references for engine room and pull box locations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Manual Formatting Requirements: This document outlines the specific formatting and labeling requirements for manuals, including mandates for labels, dimensions, legends, callouts, notes, figures, and tables.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MOC-300-3 General Requirements for Electrical/Electronic Items: Standard Specification MOC-300-3 (September 2000) from the NOAA Marine Operations Center. It outlines general technical requirements for electrical and electronic work, referencing IEEE STD 45-1988 and USCG 46 CFR. Key mandates include the use of low smoke cabling, secure installation of electronic racks, specific cabling identification via embossed tags, and the delivery of technical manuals to the COTR.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MOC-631-2D Coating Systems for Steel Surfaces: Standard Specification MOC-631-2D (August 2002) for the National Oceanic and Atmospheric Administration (NOAA) Marine Operation Center, Atlantic. This document establishes general requirements for surface preparation and the application of coating systems on steel surfaces for NOAA ships and boats, including detailed references to SSPC standards, environmental conditions for application, and specific surface preparation methods such as near-white blast cleaning and ultrahigh-pressure water jetting.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MOC-631-3B Underwater Body Ablative Coating System: Standard Specification MOC-631-3B (September 2000) for the National Oceanic and Atmospheric Administration (NOAA) Marine Operations Center. It defines the general requirements for applying copper-based, tributyltin-free ablative coating systems to the underwater bodies of steel ships and boats, including detailed surface preparation (sandblasting or UHPWB), application conditions, and approved coating systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Naval Sea Systems Command - AFFF System (Aqueous Film Forming Foam) Technical Drawings: Technical specification and engineering document for the AFFF (Aqueous Film Forming Foam) system for the YTT 9 Class, issued by the Naval Sea Systems Command. The document includes a Bill of Materials, nozzle details, hose reel specifications, flow rate calculations, and technical drawings/plans for the engine hold and bulkhead tanks. Dated between 1989 and 1999.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-243-001 Shafting Arrangement and Details - NOAA Ship Nancy Foster: Technical drawing and specifications for the shafting arrangement and details of the NOAA Ship Nancy Foster. The document includes a bill of materials, assembly plans, detailed dimensions, material specifications (ABS-C-2 GR-2), and shafting calculations for the propulsion engine and tail shaft. Dated 1/1/2007 and 10/15/2007.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-529-002 Plumbing Drain Piping System: Technical drawing and material specifications for a ship's plumbing drain piping system (NF-529-002), dated January 1, 2002. The document includes general notes, material schedules for nickel and coarse steel, and detailed specifications for grey and black water drains, sewage transfer piping, and lavatory/shower drain configurations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-533-002 Potable Water Piping System: Technical specifications and schematic drawings for the potable water piping system of a NOAA research vessel. The document includes material schedules, equipment lists (Sanyo pressure set), symbol lists, and detailed piping layouts for the main deck and forecastle deck, referencing 46 CFR standards. Updated information is noted as of December 2022 and October 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-555-001-1I-SHT_1_Fire_Plan: Technical plan view and specifications for the Main Deck, specifically detailing the Engine Room Exhaust Trunk and Fuel Oil DYA Kits. Dated July 2005, the document includes a revision history (A through C) and engineering designations from Ford Auto Tek & Design.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-555-001-2I-SHT 2 Fire Plan: Technical fire plan and layout document (Sheet 2) featuring plan views of the bridge and forecasted deck. It includes a legend for fire protection systems, CO2 protection, smoke detection panels, and emergency generators, along with a revision history and references to the California State Fire Marshal's Office.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-561-001 Rev C Steering System Installations: Technical drawing and specifications for the steering system installation during the demolitization and conversion of the YTT-12 to a NOAA research vessel. Includes general notes on workmanship, materials (ABS rules), a detailed list of materials with weights, and specific installation instructions for hydraulic components and rudder systems. Document is dated June 2007 and associated with McDermott Shipyard Inc.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NF-562-001 Rudder Stock Design YTT-12 Conversion: Technical design and construction drawing (Rev C) for the blade rudder and rudder stock for the conversion of the YT-12 to a NOA research vessel. The document includes detailed general notes on workmanship, materials (ASTM A36 steel), coating requirements, a list of materials, and specific modification instructions to reduce loads on radial bearings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NOAA Ship Nancy Foster HVAC System Layout (NF-512-003): Technical drawing and specifications for the HVAC system of the NOAA Ship Nancy Foster. The document includes general notes on materials and workmanship, a material schedule for duct thickness and types, and detailed layout plans for the engine room, auxiliary machinery room, and electrical room. It references a shipcheck conducted in October 2002 following the conversion of the ex-USNV Agate Pass.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
3 updates
PhaseAwarded
Posted
Presolicitation
Type Changed
Presolicitation → Combined Synopsis
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Sep 8, 2015 to Sep 10, 2015. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The National Oceanic and Atmospheric Administration (NOAA), Eastern Region Acquisition Division, Norfolk, VA, on behalf of the Office of Marine and Aviation Operations (OMAO), is soliciting for the dry docking and repairs to NOAA Ship NANCY FOSTER. The NANCY FOSTER is 186 feet long overall, and its home port is Charleston, SC. Provide all labor, material, and equipment necessary to perform the following (including, but not limited to): BASE ITEMS: General Requirements; Temporary Services; Drydocking & Routine Drydock Work; Underwater Hull Maintenance Coat; Propeller Shaft Inspection; Z-Drive Propeller Shaft Renewals; Bow Thruster Repairs & Modifications; Sea Valve Overhauls; Main Engine Overhauls; ABS Surveys; Shell Plate Repairs; Steel Repairs & Modifications; Pipe Repairs & Modifications; Aft Deck Crane Overhaul & Test; Vent Duct Cleaning; Anchor Chain Inspection & Preservation & Windlass Repair; Liferaft Annual Inspection & Certification; Firefighting System Certification OPTION ITEMS: Sewage Tank Coating Repairs; Temporary Berthing & Hotel Accomodations; Stack Modifications for New Fast Rescue Boat; Oceanographic Winch Installation & Test; Rudder Stock Inspection & Bearing Renewal; Rudder Stock Bearing Relocation; Transducer Gasket Renewal; Freeboard Preservation, Maintenance Coating; Sacrificial Anode Replacements; Mission UPS Wiring & VSAT Atenna Wiring Upgrades The solicitation will include a liquidated damages clause, as well as a requirement for bid, performance, and payment bonds. The performance period will be approximately 56 calendar days, with a start date on or about January 5, 2016 and a completion date on or about March 1, 2016. Place of performance shall be the contractor's facility. Ship's transit time to and from the place of performance is not included in the specified performance period. The date, time and place for an inspection of the ship is August 19, 2015 at 9:00 A.M. (local time) at U.S. Coast Guard Pier "PAPA" in the former Charleston Naval Station. Vehicle and personnel access to NOAA Ship NANCY FOSTER for pre-proposal inspections is restricted via gated security. Appointments and arrangements for attending the ship inspection can be made by contacting the Port Engineer, Mr. James Stricker, on or before noon on August 18, 2015 at +1 (555) 000-0000 or by email at contact@example.gov. Contact information for personnel attending the ship inspection must be provided to the Port Engineer for access to the Charleston Marine Support Facility. This procurement is unrestricted. The applicable NAICS code is 336611, which has a corresponding size standard of 1,000 employees. The acquisition will be issued as a Request for Proposals (RFP) in accordance with FAR Part 15. A draft copy of the Statement of Work (SOW) is attached to this notice for reference for those planning to attend the ship check. The anticipated award date is December 5, 2015. The Government anticipates awarding a firm fixed price contract to the contractor whose proposal represents the best value, price and price related factors considered. The RFP will be issued via electronic posting on the Federal Business Opportunity (FEDBIZOPPS) web page www.fedbizopps.gov. Hard copies of the RFP will not be issued. It is incumbent upon contractors to monitor FEDBIZOPPS for the release of the RFP, specifications, drawings and all subsequent amendments. The specification will be uploaded to www.fedbizopps.gov with the RFP. Prospective offerors who are interested in submitting a proposal for this acquisition are encouraged to register with the FedBizOpps Vendor Notification Service and to be on the Interested Vendors List for this acquisition (see applicable tab within FedBizOpps where this synopsis is posted). Offerors must be registered in the System for Award Management (SAM) database at www.sam.gov/portal/public/SAM; offerors must also obtain a Data Universal Numbering System (DUNS) number and provide it with the offer. All responsible sources may submit an offer, which shall be considered by the agency. For information concerning this acquisition, please forward inquiries via e-mail to Emily Clark at contact@example.gov.
More opportunities from Department Of Commerce Noaa