Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Massachusetts was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ductile Iron (DI) Pipe and Fittings Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423330
SLED
FPCM-COR-I-001054-118-309A-RS Roof Replacement
Solicitation # FPCM-COR-I-001054-118-RS
The California Department of Corrections and Rehabilitation is soliciting bids for a materials-only purchase for a complete roofing system at the California State Prison, Corcoran, specifically for Building 309A Central Kitchen Phase 1. This is a product and fabrication purchase only, as the State will handle all installation. The required system must feature a thermoplastic Polyvinyl-Chloride (PVC) roofing membrane, XPS extruded polystyrene insulation, and a 10-year manufacturer's warranty. All proposed assemblies must be FMGI approved with a current RoofNav report and include an FM Global list for wind uplift. Bidders are required to attend a mandatory walk-thru and must submit their responses by December 17, 2026, at 2:00 PM. The contract will be awarded to the lowest responsible and responsive bidder. Required submission documents include a detailed materials list with brands and models, product cut sheets, a completed Roof System Review Checklist, and various state certifications including the Bidder Declaration and California Civil Rights Laws Certification. Deliveries are FOB Destination to the secure perimeter of the prison and must typically occur within 90 days of the Notice to Proceed, with specific material requests fulfilled within three business days. Suppliers must obtain necessary security clearances for site access and provide Material Safety Data Sheets upon delivery.
California Department of Corrections & Rehabilitation

POSTED

21 days ago

DEADLINE

in about 1 month
NAICS: 423330
SLED
FPCM-SVSP-I001020-103-KM COMPLETE ROOFING SYSTEM
Solicitation # FPCM-SVSP-1001020-103-KM
The California Department of Corrections and Rehabilitation is soliciting bids for a product-only purchase of complete roofing systems for Buildings 461 and 420 at Salinas Valley State Prison. The scope of work includes the procurement of 80 mil adhered polyvinyl chloride (PVC) thermoplastic roofing membranes with factory-applied felt backing, XPS tapered insulation, gypsum sheathing, membrane flashings, fasteners, anchors, and protection walk pads. Additionally, the contract requires cladded sheet metal products, snap-on coping metal, and various adhesives and sealants. All materials must be FM Global listed for wind uplift, and insulation adhesives must comply with FM Global Property Loss Prevention Data Sheets 1-29 and 1-49. A mandatory walk-thru is required for prospective bidders, and the final award will be made on an all-or-none basis. Bids are due by November 10, 2026, and must include a detailed materials list with unit pricing, product cut sheets, and a completed Roof System Review Checklist. A critical requirement is a manufacturer's standard ten-year, full-system, no-dollar-limit warranty, which will only be paid once the system is installed and accepted by the manufacturer's representative. Deliveries are FOB Destination to Salinas Valley State Prison and must be coordinated with the construction supervisor 48 hours in advance, with a requirement that all requested materials be delivered within three business days. Bidders may receive preferences for being a California certified Small Business, DVBE, or through the Target Area Contract Preference Act. Security clearances are mandatory for all personnel delivering materials within the secure prison perimeter.
California Department of Corrections & Rehabilitation

POSTED

about 2 months ago

DEADLINE

in 5 days
NAICS: 423330
SLED
FPCM-HDSP-I001066-PH2-148-KR Roof Replacement for HDSP
Solicitation # FPCM-HDSP-I001066-PH2-148-KR
The California Department of Corrections and Rehabilitation is soliciting bids for a material and fabrication purchase to provide a complete roofing assembly for Building 352 at High Desert State Prison in Susanville, California. This is a product-only procurement, meaning the State will handle all installation. The required system consists of an 80 mil adhered polyvinyl chloride (PVC) thermoplastic roofing membrane with factory-applied felt backing to cover approximately 31,000 square feet, along with necessary insulation, sheet metal, and adhesives. Key requirements include a 10-year full system warranty, an FM Global listing for wind uplift, and compliance with CCR Title 24 and CBC fire safety standards. Bids must be submitted by November 5, 2026, at 2:00 PM via email to Kirsten Ruesch or through the US Postal Service in a sealed package. To be considered responsive, offerors must use the State's official bid forms and quote F.O.B. Destination. Required submission documents include a detailed materials list with product cut sheets, a completed Roof System Review Checklist, and a Commercially Useful Function Declaration for those claiming small business preference. Award will be made on an all-or-none basis. The successful contractor must ensure all materials are delivered in original manufacturer packaging and that personnel obtain the necessary security clearances for site access.
California Department of Corrections & Rehabilitation

POSTED

about 2 months ago

DEADLINE

in about 9 hours

AI Contract Overview

Show more

The Town of Winthrop in Massachusetts is seeking a subcontractor for the supply of cement-lined ductile iron pipe, couplings, valves, and fittings. This procurement is intended to support the installation of 2,200 linear feet of water main located at Metcalf Square in Winthrop, zip code 02152. The solicitation was posted on August 5, 2026, and requires responses to be submitted by August 26, 2026, at 4:00 PM. This opportunity falls under NAICS code 423330 and is managed through the PROCU system.

General Info

Winthrop MA seeks subcontractor for water main pipes and fittings at Metcalf Square.

Place of Performance

Metcalf Square Winthrop, MA, 02152, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-25-1374-PROCU-PROCU-132123.

The full solicitation package (28 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Water Main Replacement Bid

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → PROCU - Town of Winthrop
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of cement-lined ductile iron pipe, couplings, valves, and fittings for 2,200 LF water main installation.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS