Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Oregon was posted on April 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ductile Iron Pipe Supply with Corrosion Protection

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the supply of four 24-inch lined ductile iron discharge pipes designed specifically for use in H₂S-bearing sewer environments, featuring a corrosion-resistant coating to enhance durability and performance under harsh conditions. This procurement is managed by Water Environment Services in Oregon and is classified under NAICS code 332212, which pertains to the manufacturing of iron pipe products. The materials are intended for installation in Oregon City, with a specified zip code of 97045, ensuring a local point of delivery and use. The solicitation was posted on April 20, 2026, with responses due by May 20, 2026, indicating a 30-day window for bid submissions. The contract is structured as a subcontract, though no information about set-aside types or organization types is provided. Overall, this contract targets suppliers capable of delivering specialized ductile iron pipes with corrosion protection suited for challenging sewer environments, emphasizing reliability and resistance to hydrogen sulfide-induced degradation.

General Info

Supply four 24-inch lined ductile iron pipes with corrosion resistance for Oregon sewer use.

Place of Performance

Oregon City, OR, 97045, USA

Set-Aside

NONE

Documents

This scope was carved out of S-C01010-00016669.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFQ#2026-28 Kellogg Creek Influent Pump Station Headworks Pipe Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Water Environment Services
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of four 24-inch lined ductile iron discharge pipes with corrosion-resistant coating for use in H₂S-bearing sewer environments.

More opportunities from Oregon → Water Environment Services

Same awarding agency

NAICS: 237110
SLED
BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements
Solicitation # S-C01010-00018145
The Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements project, solicitation S-C01010-00018145, is a construction effort managed by Water Environment Services for Clackamas County, Oregon. With an engineer's estimate of $3,700,000.00, the project involves replacing worn components across four parallel concrete aeration basins, including pumps, mixers, diffusers, gates, instruments, and electronic controls. A critical requirement of the scope is that the contractor must maintain continuous operation of the existing wastewater facilities throughout the construction process. The project is governed by EJCDC C-700 Standard General Conditions and requires adherence to Oregon state prevailing wage rates. The contract establishes a strict performance timeline with substantial completion required within 700 calendar days of the Notice to Proceed. Key milestones include the refurbishment of Aeration Basins 1 and 2 by September 30, 2027, and the completion of all four basins by September 30, 2028. Award will be granted to the lowest responsive and responsible bidder. Contractors are required to provide bid, performance, and payment bonds, and must submit a comprehensive Quality Control Plan within 30 days of the Notice to Proceed. Technical deliverables include a Facility Performance Demonstration certification and final as-built drawings provided in AutoCAD and PDF formats.
Water and Sewer Line and Related Structures Construction

POSTED

21 days ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS