This Sources Sought opportunity from Department Of Defense was posted on June 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dworshak Unit 4

Closed
W912EF25RSS27Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Ahsahka, ID, 83520, USA

Set-Aside

NONE

Documents

1

Dworshak Unit 4 Figure Book

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 12, 2025 to Jul 11, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more
THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY. This notice does not constitute a commitment by the Government. All information in response to this announcement is voluntary, and the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government. As part of its market research the US Army Corps of Engineers (USACE), is issuing this sources sought to seek out interested firms capable of completing one or all aspects of the work defined below. The Government may use the responses to this sources sought for information and planning purposes. Responses are requested regardless of business size. Estimated magnitude of construction will be included in future market research after an acquisition strategy is determined. Further market research (including a site visit) will be conducted once an acquisition strategy is determined. 1. Project Summary The U.S. Army Corps of Engineers (USACE), Walla Walla District intends to expand the generation capability of the Dworshak Dam Powerhouse by installing a fourth generating unit (Main Unit 4) and associated powerhouse structure extension. Dworshak Dam is located on the Clearwater River in Ahsahka, ID, approximately 50 miles east of Lewiston, ID. The Government intends to accomplish this work through one or multiple, firm fixed-price procurements with a proposed work breakdown and general scopes as follows: a. Civil/Structural - Preparation of site, construction of powerhouse and tailrace substructure, and erection of functional building envelope for powerhouse extension. b. Generator Step-Up Transformer - Supply contract for the procurement and delivery of three single-phase oil filled transformers with an approximate rating of 13.8 Delta - 500/288.68 GrdY kV at 100,000 kVA each. c. Turbine-Generator - Design, supply, installation and commissioning of a hydroelectric generator with an approximate rating of 250-300MW. d. Balance of Plant - Auxiliary mechanical and electrical systems to support power generation and powerhouse operations. e. Hydraulic Steel Structures - Supply of standalone steel structures such as gates, bulkheads and trash racks. 2. Existing Conditions Construction of the existing powerhouse and installation of its three units completed in 1973. Allowing for updates in technology and operation, Main Unit 4 is generally considered to analogous to Main Unit 3, and they will operate concurrently. At 259MW, Main Unit 3 is currently the largest installed unit and provides approximately 56% of plant capacity. Main Unit 3 is a 192-inch diameter turbine runner and rotates at 128.6 rpm; the rated head is 560 ft. Owing to its size, Main Unit 3 is also most important environmentally, providing temperature and total dissolved gas control for downstream flows. The original Dworshak design anticipated six units at full build-out. Bays 4-6 are currently empty down to bedrock (skeleton bays) with intake structure, penstocks embedded in the intake, and some of the discharge structure already constructed. 3. Project-Specific Constraints and Challenges a. The Government intends to generally extend the configuration and design of the existing powerhouse for Main Unit 4. b. Operations activities in the existing powerhouse will continue throughout the construction phase of all the work related to the addition of Main Unit 4. Contractor operations will generally not be allowed to disrupt Government operations and personnel. c. Disruption of the power generating capacity of existing units will not be allowed except during specific defined times when the units are normally not used. These periods will be referred to as - outages. d. Some areas of work will involve extensions of existing powerhouse systems. The window to do this associated work may have work windows corresponding to outages that have very limited flexibility for extensions or changes. e. The project work site has very limited room for contractor operations and staging of equipment. Remote sites, either Government- or Contractor-provided, will likely be needed for work crew parking, equipment staging, office trailers and tool storage. Access to the powerhouse is currently through a single road which has minimal turnaround and parking spaces. f. Transportation and delivery routes for large or heavy equipment may be limited by the capacity of bridges and other public transportation infrastructure. g. The community in the vicinity of the project area has limited capacity to accommodate a surging construction workforce. Available land for temporary housing, project offices, and life support areas is constrained by the mountainous terrain, rivers, and federal, tribal, and other land ownership and usage agreements. h. The work will occur adjacent to, over, or in water. Environmental controls will be critical to avoid oil spills and other impacts. i. There may be multiple prime contractors with the various proposed procurements. Contractors will need to coordinate between other contractors and with the Government. 4. Scope Description a. Civil/Structural 1) Design (potentially contractor-provided, as under design-build) a) Draft tube & spiral case modifications: Design and oversight of modifications to the existing draft tube and construction of a new spiral case. b) Penstock extension: Design and installation of a new penstock extension between the existing penstock and the spiral case to be provided, including foundation and support structures. c) Powerhouse superstructure: Design and construction of a new powerhouse superstructure, including foundations, walls, roof, and crane support. d) Transformer yard & diesel generator area: Site preparation, foundation design, and construction of a new transformer yard and diesel generator area, including fire protection and oil containment systems. e) Structural steel design: Design of steel structures other than embedded turbine-generator components. f) (Reinforced) Concrete design: Design of reinforced concrete foundations, retaining walls, mass concrete placements, powerhouse superstructure. g) Drainage design: Civil drainage design for site runoff and dewatering systems. 2) Construction (based on either government- or contractor-provided design) a) Site preparation & demolition: Controlled demolition of existing structures (transformer bridge), excavation, dewatering, and site preparation activities. b) Penstock extension installation: Installation of the penstock extension, including connections to existing structures. c) Retaining wall construction: Construction of retaining walls and powerhouse walls d) Drainage system installation: Installation of civil drainage systems for site runoff and dewatering. e) Foundation construction: Construction of foundations for the powerhouse superstructure, transformer yard, diesel generator area, and penstock extension. f) Powerhouse concrete work: Placement of reinforced concrete for foundations, walls, mass concrete (draft tube, spiral case), and other structural elements. g) Structural steel erection: Erection and installation of structural steel components (penstock, spiral case liners, powerhouse superstructure). h) Draft tube & spiral case installation: Installation of steel draft tube liners and spiral case components. i) Removal of toro-spherical bulkhead: This blocks the penstock for Main Unit 4. j) Powerhouse Superstructure: Construct generator pedestal, powerhouse walls and galleries, powerhouse roof, powerhouse end wall. k) Building systems: All high-bay lighting, HVAC and ducting, convenience and user lighting, doors, surface finishes, hand/guard railings, access controls, and fire alarm, control, and suppression systems that are not power-train equipment-specific. b. Three Generator Step-Up (GSU) Transformers 1) 13.8 Delta - 500/288.68 GrdY kV at 100,000 kVA each 2) Core or shell form construction 3) BIL: H winding 1,425 kV; X winding 110 kV 4) Nitrogen blanketed 5) ODAF or OFAF cooling 6) Maximum shipping weight of 315,000 lbs 7) One, three-phase transformer is acceptable if it can meet the shipping weight restriction for movement across the powerhouse facility. c. Turbine-Generator 1) Turbine a) A minimum of 346,000 hp at 560 ft of head. Final size, dimensions, and rotational speed not determined. b) Existing Unit 3 has a flanged split runner design to accommodate shipping c) CA6NM Stainless Steel d) Coordination will be required with the construction of the powerhouse extension. Specifically, the extension from the existing penstock through the existing skeleton draft tube (from approximately Section 11 of the Unit 3 draft tube) will be coordinated with the Civil/Structural Construction. e) A model test will be required 2) Generator a) Roebel Bar construction b) Totally Enclosed, Water-Air Cooled (TEWAC) construction c) Radial-free stator frame hold down design d) Intended winding design life of 45 years e) Wedge design pole to rim interface f) Continuously stacked core d. Balance of Plant Procurement includes design, supply, installation, and/or commissioning of various mechanical and electrical systems (referred to here as - balance of plant equipment) that support the operation of the newly installed hydroelectric turbine-generator unit. Potential equipment or systems of equipment that may be covered by this effort include, but are not limited to: 1) Direct current (DC) Power distribution systems [125Vdc class], including extension of existing systems, and preferred AC systems using an inverter powered by the station DC battery. 2) High voltage alternating current (AC) 500kVac class power distribution systems, including taps, bus work, disconnect switches, and interconnections between the transformer high voltage bushings and existing overhead 500 kVac transmission line. 3) Medium voltage alternating current (AC) 15kVac class power distribution systems including isolated phase bus from the generator terminals to the main unit circuit breaker, isolation points, taps, disconnect switches, and main unit circuit breaker, and isolated phase bus from the breaker to the transformer low voltage winding. 4) Low voltage alternating current (AC) 600 Vac and under power distribution systems including extension of existing station service systems, new motor control centers, and lighting circuits 5) Generator control, metering, and annunciation switchboard 6) Generator, transformer, and bus protective relays 7) Integration of new equipment with existing plant SCADA system 8) Generator fire protection system (high pressure CO2 system using bottles). 9) Turbine-Generator unit governor systems including digital controllers and hydraulic systems with a pressure rating of 350 psi or greater 10) Generator excitation system; full inverting potential source static rectifier exciter 11) Plant raw water distribution systems 12) Plant compressed air systems including 100 psi shop air and 350 psi or greater governor air. 13) Installation of government-furnished (via separate contract) generator step-up (GSU) transformer including mounting, containment and water-deluge-type fire protection system. 14) Extension of existing powerhouse drainage and unwatering systems. 15) Heating, ventilating and air-conditioning systems for the powerhouse and auxiliary conditioned spaces. e. Hydraulic Steel Structures 1) New Trash Racks. Fabrication, delivery, and installation of new trash racks. (At this time, designer is assumed to be USACE.) 2) New Draft Tube Bulkheads (Optional). Fabrication to EM 1110-2-2107 requirements, delivery, and installation of new draft tube bulkheads (At this time, designer is assumed to be USACE.) 3) New Intake Headgate (Optional). Fabrication to EM 1110-2-2107 requirements, delivery, and installation of new intake headgates (At this time, designer is assumed to be USACE. 5. Questions for Industry a. General 1) What in your opinion is the optimal packaging of this scope and corresponding number of government-issued contracts 2) Given the answer to Question #1 above, what portions of work or contracts would contractor-provided design (ex. design-build) be preferred? 3) Does anything in this project scope discourage you from bidding? 4) Does anything in this project scope as written increase pricing uncertainty? 5) What factors other than scope would incentivize you to bid on this work? 6) Are there any market conditions or industry practices that you feel the Government needs to be aware of? 7) If bidding as a prime, what features of work or percentage of the project scope would you self-perform? b. Schedule and Workforce 1) Given the limited scope above, what is the approximate estimated duration for this project scope, inclusive of both design and construction elements? 2) Are there recommended scope items (above) that should be phased? 3) What would be the estimated maximum size of work crew needed to accomplish the work? 4) If workforce accommodations in the project area are insufficient and Lewiston does not provide viable options, what lodging and other facilities would the contractor anticipate needing to provide to practically accomplish this effort? c. Logistics 1) Are there shipping considerations the Government should be aware of? For example, is another flanged, split runner anticipated? d. Balance Of Plant 1) Would you recommend any of the systems or equipment identified in the proposed balance of plant effort be combined into one of the other proposed efforts for this project? 2) Are there any specific systems or equipment not identified in this notice that you would recommend including under this effort rather than one of the other proposed efforts for this project? 3) If the procurement required the balance of plant contractor to interface and coordinate with the turbine-generator contractor during commissioning activities of the new turbine-generator unit, would there be any objections, provided the limits and requirements of coordination for each party were clearly defined? 4) The Government intends to lead the commissioning, energizing, and systems integration startup processes. The various subcontractors and suppliers would each be responsible for their area of installation, procedures for energizing, and any tuning. Is this proposed process acceptable or would contractor(s) prefer it was assigned to a specific prime contractor. 6. Submission Instructions Responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought - W912EF25RSS27. Please email to Jani Long, Contracting Officer, at contact@example.gov and Cyndi Jacobsen, Contracting Specialist at contact@example.gov before 2:00 pm Pacific time on 12 June 2025. Interested parties responses to this Sources Sought shall include the following information: a. Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID. b. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB). c. An explanation of the prime firm's capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. d. A description of work that has been performed by the prime firm that is similar to scope described in Paragraph 1 and was completed under similar constraints and challenges listed under Paragraph 2. e. Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): - Provide up to five (5), (List the critical elements required) project examples. These project examples must be similar in size, scope and complexity to the work described in this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following: Project Title Contract Number Contract award date Customer name, phone number and email address Prime or Subcontractor Initial contract dollar value Final contract dollar value Initial contract completion date Final contract completion date The Government may verify information in CPARS or PPIRS. f. Firm's Joint Venture information if applicable - existing and potential. g. Firm's Bonding Capability in the form of a letter from Surety. h. Firm's interest and the likelihood in bidding on a potential solicitation related to the scope described above, if advertised. i. Responses to the government's questions in paragraph 5 and any other information the Firm feels the government needs to be aware of. 7. Disclaimer and Important Notes a. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract. 8. Attachments a. See Dworshak Unit 4 Figure Book

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting bids for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project, under solicitation W912EF27QA0020001, requires the contractor to provide all personnel, materials, and equipment necessary to transport the bulkheads from the dam to their repair facility and return them upon completion. The scope of work includes the removal of existing coatings, performing weld repairs, and applying new coatings. The project is divided into phases with specific pickup and return windows occurring between November 2026 and July 2027. All transportation must be coordinated with the Contracting Officer at least 15 calendar days in advance and conducted Monday through Thursday during specified hours. Technical requirements are stringent, requiring 100 percent inspection of all welds using Visual Testing and Magnetic Particle Testing in accordance with AWS D1./D1.M. Coating applications must meet specific dry film thickness standards, with a minimum average of 7.0 mils for the completed system. The contractor must provide a third-party certified coatings inspector and ensure all paint materials are certified by the CERL Lab. To be considered technically acceptable, bidders must submit specific pre-award documentation, including SSPC QP 3 or AISC Complex Coating Endorsements, paint product datasheets for System 5-E-Z, manufacturer warranties, and qualifications for both weld inspectors and welding operators. Government representatives will conduct internal inspections at the contractor's facility following the removal of existing coatings.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

about 20 hours ago

DEADLINE

in 3 days
View Details
NAICS: 811310
New
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

6 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS