Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Arizona was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Earthwork and Site Preparation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863039 BRANNAN ISLAND SRA - Marina Rehabilitation
Solicitation # C26863039
The California Department of Parks and Recreation is soliciting bids for the Marina Rehabilitation project at Brannan Island SRA in Sacramento County, California. The scope of work involves the rehabilitation of a half-acre marina, including the demolition of existing docks and piles, the installation of a new dock system, guide piles, and a security gate, and the reuse of the existing gangway and ramp landing structure to ensure ADA compliant access. Additional requirements include dredging and storing dredged material, installing security cameras and LED luminaires, furnishing a fire standpipe system, and performing drainage modifications to the unpaved parking lot and trail repairs. The project requires hydrographic surveys performed by a California registered Independent Surveyor using DGPS capability. Bids are due by 2:00 p.m. on January 7, 2027, and must be submitted electronically in PDF format to [email hidden]. The contract will be awarded using the Low Price Method to the lowest responsive and responsible bidder. A mandatory 6% Disabled Veteran Business Enterprise (DVBE) participation goal is required for a bid to be considered responsive, though an incentive is provided for exceeding this goal. Additionally, a 5% Small Business Preference is available for certified small businesses. All contractors and subcontractors must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Payment and performance bonds, as well as a Certificate of Insurance, are required.
California Department of Parks & Recreation

POSTED

1 day ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

This subcontract for Earthwork and Site Preparation involves critical excavation, embankment placement, and subgrade compaction for airport apron construction. The project requires strict adherence to grade tolerances and the implementation of comprehensive erosion controls to ensure structural integrity and site stability. Managed by the Design and Construction Procurement agency in Arizona, the opportunity is categorized under NAICS code 237990. The solicitation was posted on January 29, 2026, with a response deadline set for February 24, 2026. There is no specified set-aside status for this contract.

Documents

This scope was carved out of AV08000087.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PHOENIX SKY HARBOR INTERNATIONAL AIRPORT TERMINAL 3 NORTH CONCOURSE 2 APRON

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Multiple Award Construction Subcontract (same as above)Open now
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, embankment placement, and subgrade compaction for airport apron construction requiring strict grade tolerances and erosion controls.

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project, with an estimated construction cost of $8.2 million. The scope of work involves the replacement or approved remedy of all existing drain, waste, vent, and storm drainage systems to address aging infrastructure. The selected CMAR will provide preconstruction services, including detailed cost estimating and budget validation, and will be required to submit two Guaranteed Maximum Price (GMP) proposals in MAG or CSI format. Construction services include safety oversight, quality control, and a requirement for 24-hour, 7-day emergency response coverage with an on-site response time of two hours. Additionally, the project includes an add alternate for ADA upgrades, specifically adult changing stations. Interested firms must submit a Statement of Qualifications (SOQ) and a separate bonding statement from a surety company rated A- or better via the City's Procurement Portal by December 11, 2026. The SOQ is limited to 12 pages and must include an information sheet, an organization chart of key personnel, and evidence of at least three comparable CMAR projects. Evaluation is based on a 1,000-point scoring system and reference checks. The project emphasizes Small Business Enterprise (SBE) participation, requiring that eligible SBE subcontractors be located within Maricopa County and provide Letters of Intent. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix is seeking up to five qualified contractors for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261), an on-call program focused on maintaining the wastewater collection system. The scope of work primarily involves the rehabilitation of 8-inch to 15-inch diameter clay pipes using cured-in-place pipe (CIPP) lining, though it may include dig-and-replace operations, manhole repair, sewer cleaning, CCTV scans, and bypass pumping. The contract has a duration of 36 months with a potential value of up to $50,000,000, though individual JOCs are capped at $30,000,000. All work will be performed within the State of Arizona. Selection is based on a qualifications-based process where firms are evaluated on general information, Arizona contractor licensing, and performance reference checks. Applicants must submit a Statement of Qualifications (SOQ) in PDF format via the City's procurement portal by November 30, 2026. Required documentation includes a bonding capacity statement from a surety company and the firm's current Experience Modification Rate (EMR). While the contract includes a Small Business Enterprise (SBE) clause and requires a Statement of Proposed SBE Utilization, the SBE goal for this specific project is set at 0.00%. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
SLED
ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PA75200751 & LS71200119
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Estrella Civic Space Branch Library (GO Bond) and Road Improvements project. The scope of work integrates goals from the Parks and Library Departments, involving the construction of a new 12,000 square foot branch library and significant street improvements at 99th Avenue and Lower Buckeye Road, including a new traffic light, bike lanes, and sidewalks. The estimated construction cost for the project is 9.7 million dollars, and the CMAR will be responsible for delivering the project via a Guaranteed Maximum Price (GMP) contract submitted in MAG or CSI format. Selection is based on a qualifications-based process where firms must submit a Statement of Qualifications (SOQ) by December 4, 2026. The evaluation includes a points-based scoring system for the SOQ and an additional 600 points for finalist interviews. Required submittals include a bonding statement from a surety company with a rating of A- or better, the firm's current Experience Modification Rate (EMR), and an organization chart of key personnel with Arizona contractor licenses. The project also mandates strict Small Business Enterprise (SBE) participation, requiring certified firms to perform at least 75 percent of their contract cost with their own workforce to be considered as performing a Commercially Useful Function. There is no set-aside status for this solicitation.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS