Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Earthwork and Utility Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Earthwork and Utility Installation involves providing specialized construction services for prime contractors on municipal projects within the City of South San Francisco. The scope of work encompasses general earthwork, excavation for concrete footings, utility trenching and backfilling, and the implementation of soil erosion and sedimentation controls. The primary objective is to deliver fully installed underground utility conduits and a prepared building pad. The project is categorized under NAICS code 237990 and is located in South San Francisco, California, zip code 94080. Interested parties must note that the solicitation was posted on October 15, 2026, with a response deadline set for November 13, 2026.

General Info

Earthwork and utility installation subcontract for municipal projects in South San Francisco, California.

Place of Performance

South San Francisco, CA, 94080, USA

Set-Aside

NONE

Documents

This scope was carved out of 2725.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

South San Francisco - Fire Station No. 63 Community Civic Campus: Phase 3

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of South San Francisco
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, grading, and utility trenching for prime contractors on City of South San Francisco municipal projects. Executes general earthwork, excavation for concrete footings, trenching and backfilling for utilities, and soil erosion/sedimentation control. Delivers a prepared building pad and installed underground utility conduits.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details

More opportunities from California → City of South San Francisco

Same awarding agency

NAICS: 541330
SLED
Professional Services For Administrative, Building Plan Check And Inspection, And Fire Plan Check And Construction Inspection Services
Solicitation # 20261015022
The City of South San Francisco is seeking professional consultants to establish a pool of qualified firms to provide administrative services, building plan check and inspection, and fire plan check and construction inspection services. The scope of work includes providing key personnel such as a City Building Official, Fire Marshal, Permit Technician, and Plan Examiner, as well as delivering quarterly training for Fire Prevention staff based on National Fire Protection Association standards. Performance requirements are strict, with initial plan reviews due within 10 business days, resubmittals within 5 business days, and inspection results submitted on the same business day the work is performed. All fire plan reviews must be conducted under the California Fire Code by personnel with at least five years of experience in a California municipal or county fire department, while the overall process must be supervised by an individual with experience equivalent to a highly skilled Fire Marshal. The anticipated contract term runs from July 1, 2027, through June 30, 2030, with the City holding the option to extend for up to two additional one-year periods. Proposals must be submitted electronically via ProcureNow by November 20, 2026. Award selection is based on a ranking system by a selection panel and is not necessarily granted to the lowest bidder; final approval rests with the City Council. Compensation is based on a proposed rate schedule and authorized through specific Task Authorizations or Work Orders. Consultants are required to maintain specific insurance certifications, comply with the Americans with Disabilities Act, and adhere to strict confidentiality and data security protocols regarding City information.
Engineering Services

POSTED

13 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS