Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

East Hospital - Endoscopy Expansion and Cath Lab Upgrade

Active
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-OSU-255807.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio State University is soliciting qualifications for a Commissioning Agent to support a comprehensive, multi-phased renovation of approximately 48,000 square feet at the Wexner Medical Center's East Hospital in Columbus, Ohio. The project involves the modernization of the fifth-floor Cardiac Catheterization Laboratory and the relocation and renovation of the first-floor Endoscopy Department, Rehabilitation Services, and various public and administrative areas. Key infrastructure work includes replacing a second-floor air handling unit and upgrading electrical, plumbing, and utility systems. Because the project takes place within an active healthcare environment, the selected firm must have extensive experience in occupied hospital settings to ensure operations remain fully functional. Construction is estimated to run from mid 2027 through the end of 2030, with a total project cost of 38 million dollars and a construction cost of 22.5 million dollars. The Commissioning Agent will be involved from the design phase through the warranty phase, responsible for developing the Owner’s Project Requirements and ensuring compliance with the University’s Sustainable Design and Construction Policy and ADA accessibility standards. Deliverables include detailed commissioning specifications, a testing plan for MEP and HVAC systems, and electronic O&M manuals. The project requires a collaborative BIM-enabled environment for asset tagging and the use of the e-Builder Project Management System for all compatible services and closeout documentation. Evaluation of firms will be based on location, workload, professional qualifications, team organization, and a proven track record of managing complex healthcare renovations. Submissions must include Form F110-330 and documentation of participation in the Encouraging Growth, Diversity and Equity program.

General Info

OSU seeks a Commissioning Agent for Wexner Medical Center's multi-phase hospital renovations.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1

RFQ-OSU-255807: East Hospital - Endoscopy Expansion and Cath Lab Upgrade (Commissioning Agent)

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
Contacts
Christina VetranoProject Manager

Full Description

Show more
Project number: OSU-255807
The Ohio State University is soliciting qualifications from experienced Commissioning firms for a comprehensive renovation project at The Ohio State University Wexner Medical Center's East Hospital, located at 181 Taylor Avenue, Columbus, Ohio. This transformative project involving approx. 48,000 SF will involve the strategic relocation and renovation of multiple departments on the first floor, as well as renovations within the fifth-floor Cardiac Catheterization Laboratory (Cath Lab). The project is intended to modernize facilities, enhance infrastructure, improve patient and staff circulation, and support the long-term strategic objectives of the health system. The completed design will incorporate The Ohio State University Wexner Medical Center branding and finish standards, aligning East Hospital with the system-wide patient experience and design framework. This multi-phased project requires a highly collaborative, detail-oriented, and adaptable Commissioning partner with demonstrated expertise in active healthcare projects and phased renovations within complex medical environments. Significant experience performing work in occupied hospital settings is essential, as hospital operations must remain fully functional throughout all phases of work. Funding has been approved for design services across all project components. Funding for the construction may be allocated either as a single construction package or through annual phased implementation, subject to leadership approval and funding availability at the time of construction. Project Scope: Cardiac Catheterization Laboratory (Cath Lab) -Upgrade medical equipment in two fifth-floor Cath Labs. -Renovate and modernize finishes throughout the department. -Expand and reconfigure two pre-operative/post-operative patient bays. -Implement ADA accessibility improvements Endoscopy Department -Full demolition of the first-floor west wing to relocate and renovate the entire Endoscopy Department from the first- floor East Tower to this location. -Construct two additional appropriately sized procedure rooms, increasing the total number of procedure rooms to six. -Expand pre-operative and post-operative patient care capacity through the addition of new patient bays. -Renovate and provide support spaces including clean and soiled utility rooms, a combined high-level disinfection (HLD) area, medication room, offices, and other operational support functions. Rehabilitation Services -Full demolition of the first-floor East Tower space that Rehab will occupy to relocate them from the first-floor West Wing to this location. -Enhance Physical Therapy and Occupational Therapy treatment areas. -Expand and improve staff work areas and support functions. Public Spaces and Administrative Areas -Reconfigure and renovate the first-floor entrance, security checkpoint, information desk, patient registration areas, corridors, and waiting spaces to improve safety, circulation, and the overall patient experience. -Relocate and renovate public restrooms, the hospital sanctuary, and retail gift shop space. -Centrally locate Patient Experience, Medical Records, conference facilities, and Hospital Administration offices to promote operational efficiency, collaboration, and service delivery. Facilities Storage and Enabling Relocations -Relocate existing bed storage, facilities storage, and staff training functions to a new location yet to be determined. -Provide enabling work necessary to support future phased construction activities. Infrastructure -Replace an original hospital air handling unit located on the second floor of Tower 2 to support newly renovated and relocated program areas. -Investigation may be required for electrical, plumbing and/or utilities to determine capacity and locations. -General infrastructure throughout all areas may be upgraded including electrical panels, FCU’s, VAVs, Lighting, etc. This project represents a significant investment in East Hospital's future and requires a commissioning partner capable of delivering innovative, efficient solutions, phasing strategies, and exceptional execution within an active healthcare environment. Firms with a proven track record in complex hospital renovations are encouraged to submit qualifications. Participation in weekly design meetings will be expected during Precon and Construction as well as an onsite presence throughout the project. Construction duration is estimated to run from mid 2027 – end of 2030. Professional design services are held under a separate contract by Gensler. Areas highlighted in orange reflect the proposed renovation areas. Areas highlighted in blue indicate enabling projects that will be delivered as separate projects but may influence the overall construction phasing strategy. First Floor Fifth Floor This project is required to be constructed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. This project is required to deliver asset tagging within a collaborative BIM-enabled environment. The Primary firm submitting for the project will be required to have the expertise capable of meeting this requirement and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Workflow and the OSU PDS Tools can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The objective of commissioning is to provide documented confirmation that a facility fulfills the functional and performance requirements of the building owner, including but not limited to fundamentals contained within Climate Action Plan, The Ohio State University’s Sustainable Design and Construction Policy, and Integrated Energy & Environmental Implementation Strategies. To reach this goal it is necessary for the commissioning process to develop and document the owner’s criteria for system function, performance, and maintainability, as well as, to verify document compliance with these criteria throughout design, construction, start-up, initial operation and seasonal operation. In addition, complete electronic operation and maintenance (O&M) manuals, as well as training on system operations, should be provided to the building operators to ensure the building continues to operate as intended. The Commissioning Agent (CxA) will develop the Owner’s Project Requirements (OPR). The University is committed to commissioning this facility to ensure that all systems are well designed, complete and functioning properly upon occupancy and through all seasons, and that staff has adequate system documentation and training. Maximizing energy conservation is a critical component of the design goals to comply with the Sustainable Design and Construction Policy. The CxA will assist in providing design review comments, commissioning related documents to incorporate into the construction documents and a commissioning plan for the project to ensure that the Sustainable Design and Construction Policy requirements of the project are met. The anticipated Building systems to be commissioned include but are not limited to: HVAC equipment and systems, temperature controls, renewable energy systems (if any), electrical, fire alarm, and plumbing. The CxA will be involved from the design phase through warranty phase. The CxA will be responsible for reviewing and thoroughly documenting the Owner’s Project Requirements and providing input on the Basis of Design through reviews and interaction with the Project Engineer, University Architect, University Engineering, Facilities Operations and Development, and the A/E. The primary role of the CxA during the overall design phase is to develop detailed commissioning specifications, and to review design to ensure it meets the Owner’s objectives as well as The Ohio State University’s Sustainable Design and Construction Policy. During construction, the CxA coordinates the execution of a testing plan, which includes observing and documenting all systems’ performance to ensure that systems are functioning in accordance with the Owner’s objectives and the contract documents. The CxA is not responsible for design or general construction scheduling, cost estimating, or construction management, but it may be necessary to assist with problem solving non-conformance issues and deficiencies. The CxA will be required to provide input on the overall master schedule where they are to perform tasks. The goal is to partner with an advocate for high-quality patient care and staff safety while holding the project to the standards of our BDS, including the WMC specifics. CxA may be present for installations and/or start-ups as needed. The selected CxA, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Consultant Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity (“EDGE”) Program as required by statute and the Agreement. The CxA may be responsible for contracting with an outside firm for independent testing and balancing of systems. The project team (Owner / A/E / CxA / Contractor) will be required to utilize e-Builder, the University’s Project Management System, for all compatible services required by the University. The project shall follow the applicable University Sustainability Standards. https://fod.osu.edu/sites/default/files/div_18.pdf. The Commissioning Agent shall review, comment, and participant in all aspects of the standards applicable to their scope of work. Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The CxA will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The CxA is responsible for all costs incurred related to compliance with these policies. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Multi-phased renovation experience in an occupied Healthcare facility as a Commissioning Agent 2. Experience in writing commissioning specifications 3. Experience with Sustainable Design & Construction 4. Experience in the operations and troubleshooting of building control systems, and MEP systems 5. State and/or Ohio State University Administered Projects. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Commissioning Firm.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from The Ohio State University

Same awarding agency

NAICS: 238220
New
SLED
OSU-255480, JOC HHW and CHW Meter Replacement
Solicitation # OSU-255480
The OSU-255480 project involves the replacement of existing insertion-style chilled water and heating water meters with in-line electromagnetic flow meters at the James Outpatient Care facility in Columbus, Ohio. The scope of work includes necessary pipe modifications to meet straight-pipe requirements, the installation of 304 stainless steel flow tubes with 316 stainless steel electrodes, and the provision of remote wall-mounted programmable transmitters with a billing accuracy of plus or minus 0.25 percent. Additionally, the contractor must provide and wire OSU and ENGIE compliant gas meter integration, including all required power, building automation, and wiring pathways. All work must adhere to the 2024 Ohio Building Code, NFPA 70, NFPA 70E, and ANSI standards for pipe identification and safety signs. The contract has a trade estimate of 341,000 dollars and a performance period of 120 consecutive days from the Notice to Proceed. Bids are due by October 30, 2026, and will be awarded to the lowest responsive and responsible bidder based on experience, financial condition, and management capability. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage laws, and the maintenance of builder's risk insurance on a special causes of loss form. Contractors are required to submit detailed bidder qualifications and a pre-work evaluation regarding construction site safety. Final acceptance is contingent upon a successful final inspection by the Architect/Engineer and the delivery of approved O&M manuals.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS