Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Energy was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EIN Construction Manager as Advisor

Closed
SS_APP00973Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Brookhaven Science Associates, acting on behalf of the U.S. Department of Energy, is seeking qualified contractors to provide Construction Manager as Advisor (CMa) services for the Electron-Ion Collider (EIC) project at Brookhaven National Laboratory in Upton, New York. This is a sources-sought notice issued under solicitation number SS_APP00973, with a response deadline of August 14, 2026, and is not a formal contract award. The scope of work includes pre-construction support such as detailed cost estimation, schedule development using Oracle Primavera P6, constructability reviews, commissioning plan evaluation, identification of long-lead items, and full compliance with federal, state, and industry standards including ASME, NFPA, OSHA, 10 CFR 835/850/851, and NYS Uniform Codes. Contractors must demonstrate experienced personnel with specific qualifications, including a certified professional estimator, a scheduler with experience on multi-year projects, and a project manager with a decade of industrial construction oversight. All deliverables must be submitted electronically through the EIC Electronic Information Management System, with cost estimates required in Excel or CSV format. The estimated project budget range is $243.9 million to $295.39 million, derived from bid alternatives tied to a $271 million targeted construction cost. Performance is tied to Notice to Proceed events, with key milestones linked to design and planning phases. The contract does not include formal FAR clauses, standard contract types, line-item pricing, packaging or marking requirements, or socioeconomic set-asides, and no formal evaluation weights, award basis, or contracting officer details are specified. All submissions must be directed to Eric Nagel at [email hidden], and no formal representations or certifications regarding UEI, CAGE, or small business status are required, though deviations from requirements must be explicitly documented and justified.

General Info

Brookhaven Lab seeks qualified Construction Manager as Advisor for Upton, NY projects via RFI by August 14, 2026.

NAICS

541330 - Engineering Services

Place of Performance

Upton, NY, 11973, USA

Set-Aside

NONE

Documents

2

EIC-IFD-SOW-014 Construction Manager as Advisor Pre-Construction Support SOW

PDF, High priority: read this firstsow
High

EIN CMa Pre-Construction Support Qualifiers R1

DOCX, High priority: read this firstqualifiers
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Brookhaven National Labor -Doe Contractor
Contacts1 person available
OfficeUpton, NY, 11973, USA
Office AddressUpton, NY, 11973, USA
Contacts

Full Description

Show more

***Request for Information Only***


Brookhaven Science Associates is seeking qualified and interested contractors that can meet the requirements listed in the attached Statement of Work. Additionally prospective contractors must be able to meet the requirements in the attached "Qualifiers" document. Please submit capabilities statements to Eric Nagel at contact@example.gov.


***Request for Information Only***

More opportunities from Department Of Energy → Brookhaven National Labor -Doe Contractor

Same awarding agency

NAICS: 335999
New
Federal
HSR HF Dipole and Quad SC Magnet PS and Quench
Solicitation # APP00730MB
Brookhaven Science Associates, acting as the operator of Brookhaven National Laboratory, has issued a Request for Information and Sources Sought notice under solicitation APP00730MB for the design and manufacture of high-current power supply systems for the Electron-Ion Collider Hadron Storage Ring. The project requires the procurement of two modular units: Model A for the main arc dipole circuit and Model B for the main arc quadrupole circuit. These systems must include programmable PLC controls, current measurement and regulation equipment, quench-protection and control systems, and local operator interfaces. The selected contractor will be responsible for the full lifecycle of the equipment, including nonrecurring engineering, design, analysis, manufacture, inspection, testing, and delivery to the facility in Upton, New York. Technical requirements mandate compliance with ISO 9001 and BNL-QA-101 quality standards, as well as adherence to IEC, IEEE, NEC, and NEMA specifications. The contractor must perform initial testing at their own facility or a pre-approved site, with final acceptance occurring at Brookhaven National Laboratory within 90 days of receipt. Deliverables include a program plan, monthly progress reports, and a series of design reviews. Interested suppliers must submit their capabilities, estimated lead times, a compliance matrix, budgetary pricing, and any exceptions to the general terms and conditions to the contract specialist by December 11, 2026, at 5 PM EST.
All Other Miscellaneous Electrical Equipment and Component Manufacturing

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Mechanical Services Basic Ordering Agreement (BOA)
Solicitation # SJ472268
Brookhaven Science Associates, LLC, operator of Brookhaven National Laboratory, is soliciting offers for a Mechanical Services Basic Ordering Agreement (BOA) under NAICS 238220. This total small business set-aside requires a contractor to provide all labor, materials, tools, and supervision for various mechanical construction projects across the BNL site, with specific work authorized through individual task orders. The anticipated period of performance begins in November 2026 for a base year, with four optional one-year increments extending the potential term through November 2031. While individual BOAs will have specific ceilings, all awarded BOAs under this effort will share an estimated aggregate ceiling of 20 million dollars. The award will be based on the lowest priced technically acceptable (LPTA) criteria, with BSA awarding the BOA to between one and three qualified offerors. To be responsive, offerors must attend a mandatory virtual overview and site visit on October 15, 2026, and submit a completed Qualification Criteria Form, a Sample Project Pricing Sheet, and a Schedule of Unit Rates by October 30, 2026. Technical acceptability is contingent upon meeting all qualification criteria, including safety records and staffing capabilities. Contractors must comply with New York prevailing wage determinations and the BNL Health and Safety Plan. Performance requirements include the ability to mobilize personnel to the site within two hours for after-hours or weekend emergencies and starting task order work within two working days of a Notice to Proceed. Bonding requirements are tiered by project value, requiring payment bonds for work between 35,000 and 150,000 dollars, and both performance and payment bonds for work exceeding 150,000 dollars. All materials must adhere to the Buy American-Construction Materials clause, and electrical or fire protection equipment must be certified by a Nationally Recognized Testing Laboratory.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

7 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS