Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on May 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Pony Express Trail Bridge Repairs

Closed
12970224R0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 11 hours ago

DEADLINE

in about 17 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Placerville, CA, USA

Set-Aside

SBA

Documents

13

Davis-Bacon Act Wage Determination CA20240007 (El Dorado County)

TXT, High priority: read this first39 pages · wage-determination
High

Eldorado Forest Standard 6' Foot Bridge Drawings - Sheet 1

PDF, High priority: read this firstspecifications
High

Evaluation Factors for Award

PDF, High priority: read this first5 pages · evaluation-factors
High

Forest Service Supplemental Specifications - Section 557 Timber Structures

PDF, High priority: read this first7 pages · specifications
High

FP-14 Standard Specifications for Construction of Roads and Bridges

PDF, High priority: read this first762 pages · specifications
High

Pony Express Trail Bridge Repairs - Schedule of Items

PDF, High priority: read this first1 page · specifications
High

Pony Express Trail Bridges Map

PDF, High priority: read this first1 page · specifications
High

Pony Express Trail Bridges Rebuild - Standard 6'-0 Foot Bridge Drawings

PDF, High priority: read this firstspecifications
High

Pony Express (XP) Trail Bridge Construction RFP

PDF, High priority: read this first51 pages · rfp
High

Solicitation 12970224R0029 - El Dorado National Forest Bridge Repairs

PDF, High priority: read this first54 pages · rfp
High

SOW for Pony Express Trail Bridges (13E19)

PDF, High priority: read this first10 pages · sow
High

A10+1124263 Q&A - Bridge Construction

PDF, Low priority1 page · q-and-a
Low

Pony Express Trail Bridges Map

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
Contacts1 person available
OfficeWashington, DC, 20250, USA
Office AddressWashington, DC, 20250, USA
Contacts

Full Description

Show more
SCOPE OF CONTRACT: The procurement is for the fabrication, construction, and installation of four trail bridges of varying lengths on the Pony Express trail between Kyburz and Echo Summit. o Remove logs (if any) that served as waterway crossings at the trail bridge sites. o For all four trail bridges (Clubhouse, Fred's Place, Aspen, Huckleberry), the design is determined by the Forest Service standard trail bridge design for a wooden major trail bridge applicable to the appropriate length. See attachment 1 for standard bridge plans. o Minimum dimensions for all trail bridges are: 72 width between top railing which shall be no less than 42 above top of deck. The maximum opening of side railings shall be 8. o Contracting Officer Representative (COR) will verify location of each trail bridge, staging area and the best route between the two with the Contractor. Two bridge sites (Fred's Place, Aspen) are located within 150 of a dirt road or staging area. Two bridge sites (Clubhouse, Huckleberry) are located 2/3 mile and 1/2 mile respectfully from the work site's staging areas. o Contractor shall supply and install all dimensional lumber, concrete, associated hardware and appurtenances, as shown in the drawings. Contractor is responsible for verifying correct length of each trail bridge prior to fabrication. o Construction of the bridge's footings/foundation shall have been completed at least three weeks before attachment and installation of the superstructure implemented to allow concrete to cure and harden. Previous bridge footings left in place post-fire are not the correct dimension of the new footings but can be incorporated into the construction of the new footings. Location and mileage from Silver Fork Store in Kyburz, CA: - To Huckleberry trail bridge-travel east on Hwy. 50 17.8 miles, turn right on Scout Peak Road (FS 11NY06), travel 0.9 miles to the first sharp left-hand turn. The Pony Express trail veers off to the right. Travel on the XP trail for 0.45 miles to the trail bridge site. - To Aspen trail bridge-travel east on Hwy. 50 15.8 miles, turn right on Sierra at Tahoe Road, travel 1.1 miles and before crossing Aspen Creek is a parking area on the right. It is 0.1 miles on the XP trail from the parking area to the trail bridge site. - To Fred's Place trail bridge-travel east on Hwy. 50 4.7 miles, there is a large turnout on the north side of Hwy. 50. A gated dirt road runs up and swings to the left. After 0.15 mile, the dirt road ends within 100 feet of the trail bridge site. - To Clubhouse trail bridge-travel east on Hwy. 50 1.6 miles to the old Kyburz dump road (FS 11N43), turn left and travel 0.15 miles to the XP trail, which is on the right. It is 0.67 miles to the trail bridge site. MAGNITUDE OF CONSTRUCTION PROJECT: The price range for this contract is between $250,000 and $500,000 A pre-bid site visit will be held May 22, 2024 : Contractors will meet Forest Service (FS) personnel at 9:00 AM (local time) at the staging area of the lowest elevation bridge, which would be "Clubhouse". This would be found on the left (west) side of map Caldor Trail Bridge Relief #1. Traveling eastbound on Hwy. 50, and less than a mile east of the town of Kyburz is FS Road # 11N43, where a sharp left turn is required. This road is not signed on Hwy.50 nor is there a left-hand turn lane. It is unknown how long it will take the group to hike in, assess, and hike out, so it would be best if perspective offerors and FS personnel caravan to the other bridge sites together after the first one. SOLICITATION NO. 12970224R0029 PERIOD OF PERFORMANCE 08/15/2024 THROUGH 11/15/2025 NAICS CODE: 237310 Other Heavy and Civil Engineering Construction, $45M BONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE DAVIS-BACON WAGES APPLY RFIs to be submitted to george.staggs@usda.gov by 1200 CDT May 23, 2024.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS