Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Electrical and Control System Integration

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → Navsup Flt Logistics Ctr YokosukaView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Yokosuka, JP-14, JPN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Flt Logistics Ctr Yokosuka
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navsup Flt Logistics Ctr Yokosuka
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Electrical connection, control panel integration, and power system synchronization for the air compressor unit.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Main Terminal Improvement Program Emergency PowerThe Main Terminal Improvement Program – Emergency Power project seeks to equip the Main Terminal, concourses, and parking garage with emergency power systems compliant with NEC 700, 701, and 702 requirements, ensuring uninterrupted critical operations in a 24/7/365 airport environment. The contract, issued by the Port of Seattle’s Aviation Project Management Group, has an estimated value of $3,348,000 and will be executed under a two-year term with the possibility of extension at the Port’s sole discretion. Work will be authorized through Service Directives using either firm fixed price or time and expense billing structures, with strict limitations on subconsultant markups—four percent for first-tier and zero percent for second-tier—and no markups allowed on travel, materials, or supplies except for lab services. Billing is monthly with Net 30 payment terms, and consultants must report subconsultant payments electronically via the Port’s Contractor Database System, ensuring transparency in diversity contracting efforts. Proposals must be submitted via email by August 6, 2026, at 12:00 PM PT, with strict formatting requirements including a searchable PDF proposal body limited to eight pages, separate attachments for the Diversity in Contracting Inclusion Plan, Company Information, Resumes, and Evidence of Agreement, and no compressed file attachments permitted. Evaluation prioritizes specialized experience and technical competence of key personnel alongside interview performance, with proposals rated as Outstanding, Good, Acceptable, Marginal, or Unacceptable based on approach, understanding, and risk assessment. Compliance with federal, state, and local laws including Title VI of the Civil Rights Act, Section 504 of the Rehabilitation Act, the Trafficking Victims Protection Act, and Washington State’s Public Disclosure Act is mandatory, along with adherence to non-discrimination and affirmative action obligations that flow down to all subcontractors. Contractors must provide proof of workers' compensation and other specialized insurance coverage, indemnify the Port against negligence-related losses, and maintain all records on generally accepted accounting principles for audit purposes for at least three years post-completion. All deliverables must meet Port-specific standards, including participation in the 30% Design Review and submission of QA/QC checklists, a Design Quality Management Plan, and performance reports, with time being of the essence in all project phases.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the comprehensive design, permitting, and construction of a new camera surveillance system across the Bagwell and North Cargo Operations areas of the Port of Seattle, with the goal of enhancing security and enforcement capabilities through higher-resolution video coverage. Current camera placements, focused primarily on conveyor systems and security doors, will be expanded to include main drive lanes and entrances in the Bagwell area, ensuring improved visibility of vehicle movement and compliance with port regulations. In the North Cargo Operations zone, flexible surveillance will be implemented using Pan Tilt Zoom units to provide dynamic, user-controllable coverage over large surface areas, addressing gaps in existing monitoring. A total of 50 cameras will be installed at 43 distinct locations, combining fixed and adjustable systems to optimize surveillance efficiency and forensic accuracy. The project is led by the Aviation Project Management Group under the Port of Seattle, with Angela Peterson as the primary point of contact and Randa Williams serving as the Project Manager. The work is classified under NAICS code 238210 for electrical contractors and is forecasted with a posted date of July 23, 2026, though no solicitation number or set-aside details are provided. The scope is narrowly focused on operational security enhancement, with no mention of maintenance, training, or future upgrades.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle is planning to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility located in SeaTac, specifically targeting the removal of all PFAS-contaminated components. This project entails the complete dismantling and disposal of the current wet foam system, including tanks, piping, valves, and sprinkler heads contaminated with harmful substances, and the design and installation of a new full dry chemical fire suppression system. The new system will include all necessary components such as reserve tanks, pumps, valves, sprinkler lines, and sprinkler heads, ensuring full compliance with current fire safety standards. All new equipment must be integrated with the facility’s existing fire alarm system to ensure seamless operation and emergency response coordination. This initiative is part of a proactive effort to eliminate environmental and health risks posed by PFAS chemicals previously used in fire suppression. The project is classified under NAICS code 238210 and is being managed by the Port of Seattle’s Aviation Project Management Group. The work is scheduled under a quick turnaround (QTA) framework, indicating urgency and efficiency requirements. Primary point of contact for inquiries is Todd Rehm, with Pat Nakamura serving as the project manager. The solicitation is publicly forecasted with a posting date of July 23, 2026, and all interested parties are directed to the official Port of Seattle procurement portal for further details and future bidding opportunities.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
International
STRUCTURED CABLING INFRASTRUCTURE UPGRADE PARISH COURTS OF JAMAICAThe Court Administration Division of the Judicial Branch of Jamaica is seeking qualified Structured Cabling Contractors to deliver a comprehensive cabling infrastructure upgrade across selected Parish Courts. The scope encompasses the full lifecycle of the project including design, supply, installation, testing, certification, documentation, and commissioning of a modern, standardized structured cabling system. This initiative is integral to the Judiciary’s broader modernization strategy, aiming to establish a secure, scalable, and high-performance network foundation capable of meeting current and anticipated information and communications technology demands. The system must support reliable data transmission, future expansion, and integration with existing and emerging digital services within court facilities. Proposals must be submitted by the response deadline of August 28, 2026, under solicitation number 1519/565, which was posted on July 22, 2026. The contract is managed by Court Management Services under the Government of Jamaica, with all work to be performed at designated Parish Court locations across the country. Contractors are expected to demonstrate proven experience in delivering similar large-scale structured cabling projects with adherence to industry standards for performance, durability, and security. Documentation and certification outputs will be critical components of deliverables, ensuring traceability, compliance, and long-term maintainability of the installed infrastructure.
Court Management Services

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → Navsup Flt Logistics Ctr Yokosuka

Same awarding agency

NAICS: 336611
New
Federal
USS RUSHMORE (LSD-47) 7C1 SRA 52pkgThe solicitation N6264926R0011 for the USS RUSHMORE (LSD-47) 7C1 SRA has been amended to refine the scope of work by reducing the number of Independent Contract Items (ICNs) from 54 to 52, with two ICNs fully removed from the requirement package and 38 ICNs having their Production Completion Dates revised to align with updated specifications. The revised specifications are accessible via DoD SAFE, and vendors previously interested in the solicitation will receive direct instructions for access. Section B has been updated to reflect the new ICN count of 52 for CLIN0001, and the growth CLIN percentage for CLIN0002 has been adjusted from 16.27% to 16.21% of CLIN0001’s total proposed cost. Section J has been modified to rename Attachment (1) as “SRF-JRMC Det. Sasebo Work Specifications (Revised 38 ICNs)” and to advance Attachment (2) to Revision 3 of the Price Proposal Breakdown Sheet, ensuring alignment with the revised ICN structure and pricing documentation. The contract remains a Firm Fixed Price (FFP) arrangement under a Master Agreement for Repair and Alteration of Vessels, with performance scheduled from October 12, 2026, to July 31, 2027, at Sasebo Naval Base, Japan, under F.O.B. Destination terms. Proposals must be submitted electronically by 10:00 hrs on July 29, 2026, via email or DoD SAFE, organized into four distinct volumes as prescribed, with pricing detailed exclusively in Volume 4. Evaluation prioritizes Technical acceptability, followed by Past Performance, which holds greater weight than Price, with award based on Best Value Trade-Off rather than Lowest Price Technically Acceptable. Compliance with MIL-STD-130 and MIL-STD-129 is mandatory for item and shipment marking, with Unique Item Identifiers encoded in machine-readable data matrix symbols. Contractors must maintain an ISO 9001:2015-compliant Quality Management System, submit a Test and Inspection Plan and Objective Quality Evidence, and adhere to strict protocols for Controlled Unclassified Information under SRF-JRMC directives. Disputes are subject to U.S.-Japan SOFA conciliation procedures
Ship Building and Repairing

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 336611
New
Federal
USNS CITY OF BISMARCK (T-EPF 9) Mid-Term Availability (MTA)The USNS CITY OF BISMARCK (T-EPF 9) Mid-Term Availability (MTA) is a competitive solicitation issued by NAVSUP Fleet Logistics Center Yokosuka under solicitation number N6264926RL017 for performance from 1 February 2027 to 16 April 2027, with an optional extension through 16 May 2027. The contract will be awarded as a hybrid type combining Firm-Fixed Price (FFP) and Time and Materials (T&M) Contract Line Item Numbers (CLINs), with CLIN 0001 covering the base MTA work as defined in the Work Item Package (Attachment J-1), while CLINs 0003 and 0004 serve as T&M, not-to-exceed lines for anticipated growth in labor and material/subcontractor costs, respectively. Performance must occur at the contractor’s facility within the U.S. 7th Fleet Area of Responsibility, explicitly excluding India, and all work must conform to Military Sealift Command (MSC) specifications, ABS standards, and stringent configuration control requirements to maintain ship systems and material baselines. The acquisition is governed by the FAR, DFARS, and NMCARS, and requires full compliance with SAM.gov registration and applicable representations, including disclosures on foreign ownership, Buy American provisions, and prohibitions on covered defense telecommunications equipment. Proposals must be submitted electronically by 7:00 AM Singapore Time on 30 July 2026, using a single zip file divided into Volume 1 (pricing) and Volume 2 (technical), with pricing exclusively contained in Volume 1 and presented in net U.S. dollars. Technical proposals must demonstrate understanding of the work package, adequate facilities and berth arrangements, a robust quality control plan, hazardous waste management, and organizational capability with key personnel identified. The evaluation is pass/fail on technical and past performance factors, with award made solely on the lowest evaluated price among those meeting minimum acceptability standards. Invoicing must be processed through WAWF, with cost vouchers for T&M items and invoices/receiving reports for fixed price items, and must include all required elements as per FAR 52.232-25. All offerors must request secure access to non-public Section J documents via DoD SAFE by 10 July 2026 using their Unique Entity Identifier (UEI), and must adhere
Ship Building and Repairing

POSTED

1 day ago

DEADLINE

in 18 days
View Details