Electrical and Control Systems Integration for Laboratory Granulator
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract seeks a subcontractor to integrate motor controls, sensors, and user interface systems into a laboratory granulator unit, ensuring full compliance with operational and safety standards specific to a research environment. This effort is critical to enabling precise, reliable, and safe performance of the granulator in a controlled laboratory setting, with emphasis on seamless system coordination and adherence to industry best practices for instrumentation and control. The work must align with the technical expectations of a U.S. Department of Energy contractor and support the unit’s functionality within a high-precision scientific application. All proposals are due by July 21, 2026, and the work is to be performed at Oak Ridge, Tennessee, with a NAICS code of 334318 indicating classification under Electronic Instrument Manufacturing. The contract is structured as a subcontract under Oak Ridge National Laboratory’s management by UT-Battelle LLC, which operates under the Department of Energy. Though no set-aside provisions are specified, the opportunity is open to qualified entities capable of delivering advanced electrical and control system integration services tailored to the unique demands of a DOE-supported laboratory facility.
General Info
Agency
NAICS
Place of Performance
Oak Ridge, TN, 37830, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
