Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Connections and Controls Integration

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract covers the electrical wiring, circuit integration, thermostat installation, and control system setup necessary for the new heat pump system, ensuring full operational compatibility and energy efficiency. All work must be performed in accordance with industry standards and code requirements, with a focus on seamless integration into the existing building infrastructure. The scope requires precise coordination between electrical systems and heating control protocols to guarantee reliable performance under varying environmental conditions. This subcontract is issued under NAICS code 238210 and is associated with Construction A/e Team 1 FWS under the Department of the Interior. The opportunity was posted on May 4, 2026, with a firm response deadline of May 13, 2026, at 1:00 PM. The place of performance and exact location details are not specified, but the work is tied to a federal project managed by the Department of the Interior. Interested parties must submit proposals prior to the deadline through the provided SAM.gov link.

General Info

Supply and install electrical wiring, circuit integration, thermostat, and controls for heat pump system.

Agency

Department Of The Interior → Construction A/e Team 1 FwsView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

VA

Set-Aside

NONE

Documents

This scope was carved out of 140FC126Q0017.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

J--OR-OR ISLANDS NWR-NEWPORT HEAT PUMP

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 1 Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Construction A/e Team 1 Fws
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Electrical wiring, circuit integration, thermostat installation, and control system setup for the new heat pump.

More opportunities from Department Of The Interior → Construction A/e Team 1 Fws

Same awarding agency

NAICS: 541370
New
Federal
R--NM BITTER LAKE NWR AERIAL IMAGING
Solicitation # 140FC126R0018
Solicitation 140FC126R0018 is a Total Small Business set-aside for a Firm Fixed Price contract to provide high-resolution digital orthophotography, topographic, and bathymetric LiDAR acquisition and processing for approximately 40 square miles at the Bitter Lake National Wildlife Refuge and surrounding areas in Roswell, New Mexico. The primary objective is to gather topographic data to support the design and construction of habitat repairs following the August 2022 flood. Key deliverables include a refined point cloud dataset, a digital elevation model, and topographic and planimetric database development, all adhering to USGS 3DEP LiDAR Base Specifications 2022 rev. A and National Hydrography Dataset standards. The government is utilizing a qualifications-based selection process via Standard Form 330 submissions rather than a traditional RFP. Evaluation criteria focus on professional registration in New Mexico, specialized LiDAR experience, regional proximity, and the ability to meet a strict performance window, specifically completing aerial LiDAR flights between November 2026 and February 2027, with a final project completion date of May 28, 2027. The total performance period is 120 calendar days after the notice to proceed. Submissions must be delivered in PDF format to the contracting specialist by September 24, 2026, at 5:00 PM EDT. Award will be based on the ranking of the top three most qualified firms, and the selected contractor must provide performance and payment bonds and maintain active SAM registration.
Surveying and Mapping (except Geophysical) Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 238160
New
Federal
Z--TX-CADDO LAKE NWR-CLASS ROOM ROOF REPAIR
Solicitation # 140FC126Q0040
Solicitation 140FC126Q0040 is a firm-fixed-price construction project set aside for small businesses, managed by the Department of the Interior's Construction A/E Team. The contract involves the complete removal and replacement of the roofing system on an approximately 840 square foot classroom trailer located at the Caddo Lake National Wildlife Refuge in Karnack, Texas. The scope of work includes removing the existing roof and hauling debris to a legal landfill, installing synthetic felt, drip edge flashing, two low profile vents, and one lead flashing vent, and finishing with 30-year architectural shingles. The contractor must provide a minimum five-year manufacturer warranty and a one-year installation warranty, while maintaining a clean job site using magnets for debris collection. The project has an estimated magnitude of less than 25,000 dollars and is subject to Davis-Bacon Act wage determinations under General Decision Number TX20260105. Performance is scheduled to take place from September 28, 2026, to October 12, 2026, with standard work hours from 7:00 a.m. to 4:00 p.m. local time. Award will be granted to the responsible respondent offering the lowest evaluated price that is determined to be fair and reasonable. Payment requests must be processed electronically through the Invoice Processing Platform System, and the contractor is required to use domestic construction materials in accordance with Buy American preferences.
Roofing Contractors

POSTED

2 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS