Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Electrical Design and Signage Planning

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Government of Canada → City of Port MoodyView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Port Moody, BC, CAN

Set-Aside

NONE

Documents

This scope was carved out of RFP26-15.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Guildford Way Bicycle Facility Improvements – Design

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City of Port Moody
ContactsNo contacts available
OfficeN/A
Organization / Agency
Government of Canada → City of Port Moody
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides specialized electrical engineering for road-related infrastructure for prime contractors on City road projects. Develops electrical drawings and sign plans using electrical CAD and lighting calculation software. Requires a Professional Electrical Engineer (P.Eng) adhering to City and MMCD electrical standards. Delivers electrical design drawings and signage plans.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and land surveying. Additionally, the project requires support for environmental assessments, permitting, hazardous materials surveys, and CPM scheduling. This solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested bidders must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 11, 2026. Qualified firms must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the bond premiums. Bidders must also demonstrate an ability to maintain labor harmony, as Kiewit is signatory to several collective bargaining agreements. Detailed plans and specifications are available for review at Kiewit's Costa Mesa, California office.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Government of Canada → City of Port Moody

Same awarding agency

NAICS: 541330
International
Guildford Way Bicycle Facility Improvements – Design
Solicitation # RFP26-15
The City of Port Moody is soliciting a professional engineering consultant to serve as the Engineer of Record for the Guildford Way Bicycle Facility Improvements and a related pilot project on Murray Street. The primary objective is to establish an all ages and abilities protected bicycle connection between the Coquitlam border and Ioco Road. The scope of work includes the design of a minimum 3.0 meter wide bidirectional bicycle lane on the north side of Guildford Way with a physical buffer, transitioning to protected unidirectional lanes. Additionally, the consultant will manage a pilot project on Murray Street to test the relocation of bidirectional bike lanes to the roadway by removing curbside parking. The project is estimated to span approximately 13 months, with construction targeted for the second and third quarters of 2027. The consultant's responsibilities are divided into several phases, including pre-design, detailed design, tender support, and optional construction administration and close-out services. The total project budget is updated to 2,059,000 dollars, which includes a 1,059,000 dollar grant from TransLink. Proposals are due by September 23, 2026, and will be evaluated based on a weighted scoring system covering company profile, experience, team qualifications, and technical approach. Mandatory key personnel requirements include a Project Manager, Engineer of Record, Contract Administrator, and Inspector.
Engineering Services

POSTED

12 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
International
Ioco Road Utility Upgrade – Phase 1 – First Avenue to April Road
Solicitation # RFP26-16
The City of Port Moody is soliciting proposals for the Ioco Road Utility Upgrade – Phase 1, a construction project spanning from First Avenue to April Road. The scope of work involves approximately 750 meters of road rehabilitation, including curb and gutter installation, asphalt multi-use path construction, landscaping, pavement marking, and signage. Critical utility and drainage improvements include the installation of approximately 170 meters of storm main, culverts, headwalls, manholes, catchbasins, and lawn basins, as well as CIPP lining of the existing sanitary main. The project is governed by the Master Municipal Construction Documents (MMCD) Platinum Edition 2009 and requires substantial performance within 90 days of the Notice to Proceed. Proposals are evaluated through a trade-off process where technical merit and price are weighed against each other. The evaluation is heavily weighted toward the Schedule of Quantities and Prices (40%), followed by comparable work experience (20%), experience of superintendents (15%), technical proposal (15%), company profile (5%), and preliminary construction schedule (5%), with references serving as a mandatory pass/fail requirement. Successful proponents must provide a performance bond and a labour and material payment bond, each equal to 50% of the contract price, and maintain a minimum of $5,000,000 in comprehensive general liability insurance. All submissions must be uploaded electronically via the City of Port Moody’s Bidding System by the specified deadline.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS