Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electrical Engineering for EV Charging Infrastructure

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves providing specialized electrical design and engineering services for prime contractors working on municipal projects for the City of Pinole. The scope of work focuses on the development of Level II dual-port EVSE systems across six different sites. Key responsibilities include conducting site assessments for panel capacity, designing subpanels and trenching, creating detailed electrical plans, and coordinating transformer upgrades through PG&E Rule 29. To qualify for this engagement, the provider must hold a valid California Professional Engineer license and ensure all designs comply with the 2025 California Building Code. The final deliverable consists of permit-ready electrical engineering plans. The project is categorized under NAICS code 541330 and is located in Pinole, California.

General Info

Electrical design for Level II EVSE systems across six City of Pinole sites.

Place of Performance

Pinole, CA, 94564, USA

Set-Aside

NONE

Documents

This scope was carved out of 20261008066.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design Services For Electric Vehicle Charging Infrastructure For The City Of Pinole

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF PINOLE
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → CITY OF PINOLE
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical design and engineering for prime contractors on City of Pinole municipal projects. Conducts site assessments for panel capacity, designs subpanels and trenching, develops detailed electrical plans, and coordinates PG&E Rule 29 transformer upgrades for Level II dual-port EVSE systems. Requires California PE license and compliance with 2025 California Building Code. Delivers permit-ready electrical engineering plans for six sites.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Electrical Engineering Services, Recreation Center Door Holders
Solicitation # 26-087-RFP
The City of West Sacramento is soliciting proposals for electrical engineering design services to install magnetic door holders on fire-rated doors at eight locations within the Recreation Center (Building K) at 2801 Jefferson Blvd. The selected design professional in general responsible charge will be tasked with tying these devices into the existing campus fire alarm system. The scope of work is divided into five primary tasks: project initiation and field verification, code analysis and DSA coordination, creation of permit-ready construction documents, exemption documentation, and construction phase services, which include reviewing contractor submittals and coordinating with a DSA-certified project inspector. The project must comply with Title 24 and CSFM listings, though it is expected to qualify for exemption from DSA plan review under IR A-22 Section 4.1.1. The solicitation, numbered 26-087-RFP, requires proposals to be submitted via the City's e-Procurement Portal by November 20, 2026, at 2:00 pm. Submissions are limited to ten pages and must include a transmittal letter, a technical project approach, and a cost proposal using the provided electronic rate sheet. The City utilizes a qualifications-based evaluation process, weighting proven ability at 37.5%, proposer qualifications at 25%, technical approach at 18.8%, and acceptance of the standard contract at 6.3%, with cost evaluated separately for the highest-ranked proposers. This contract is subject to federal and state regulations, including 2 C.F.R. § 200.326, prevailing wage requirements under Labor Code section 1720, and compliance with state apprentice employment laws.
Capital Projects - Construction

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
RFQ 484-111626 ICE Services in Support of Alternative Delivery and Public-Private Partnership Projec
Solicitation # PE-48401-RFQ-2027-000000632
The Georgia Department of Transportation is soliciting a qualified firm to provide Independent Cost Estimator (ICE) services for Alternative Delivery and Public-Private Partnership (P3) projects statewide. The selected firm will act as an independent advisor, providing cost estimates, risk and value analysis, and construction schedule reviews for delivery methods including Design-Build, Construction Manager/General Contractor, and Comprehensive Development Agreements. Key responsibilities include validating and participating in cost negotiations with developer teams and ensuring no organizational conflicts of interest exist with any contractors under review. The selection process is a multi-phase evaluation consisting of a Statement of Qualifications (60% of the total score) and a Technical Approach (40% of the total score). Phase I focuses on the experience of the Project Manager and Key Team Leaders, resource capacity, and prime consultant past performance. Phase II evaluates the firm's specific technical methodology for pricing risks and maintaining quality assurance. The contract is structured as a multi-phase, project-specific agreement with potential payment models including cost plus fixed fee, cost per unit of work, or specific rates of compensation. To be eligible, the prime consultant must employ the Principal, Project Manager, and Lead Estimator, with the Project Manager requiring a degree in Civil Engineering, Construction Management, or a related field. Firms must maintain an accounting system compliant with FAR Part 31, and those with aggregate contracts exceeding 250,000 dollars must provide an annual CPA overhead audit. Submissions must be delivered in PDF format by the November 16, 2026, deadline and include notarized certification forms and the Georgia Security and Immigration Compliance Act Affidavit.
Department of Transportation-2

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → CITY OF PINOLE

Same awarding agency

NAICS: 541330
SLED
Design Services For Electric Vehicle Charging Infrastructure For The City Of Pinole
Solicitation # 20261008066
The City of Pinole is soliciting proposals for a fixed-fee agreement to provide construction-ready, shovel-ready designs for dual-port, Level II electric vehicle supply equipment (EVSE) across six municipal sites. The project encompasses Pinole City Hall, Pinole Senior Center, Bayfront Park, Pinole Swimming Pool, Meadow Park, and Louis Francis Park, with a total of 29 chargers planned. The scope of work is divided into three primary tasks: conducting site assessments for electrical capacity and ADA compliance, providing design recommendations and cost estimations, and delivering final permit-ready designs that include electrical engineering, demolition, improvement plans, and ADA-compliant striping and signage. The project is subject to rigorous federal and state regulations, including the Build America, Buy America Act, 2 CFR Part 200, the Davis-Bacon Act, and the 2025 California Building Code. Proposals will be evaluated on a 100-point scale focusing on technical expertise, project plan quality, understanding of the scope, regulatory familiarity, cost-effectiveness, and prior performance. Selected vendors must be available to commence work by November 18, 2026, with all final designs delivered by December 18, 2026. Requirements include maintaining specific liability and workers compensation insurance, obtaining a City business tax certificate, and adhering to strict record-keeping and audit standards for three years following final payment.
Engineering Services

POSTED

8 days ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS