Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electrical Engineering Oversight (High Voltage)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Electrical Engineering Oversight subcontract for the City of Lodi Electric Utility involves providing independent technical review and oversight of high-voltage electrical designs. The selected professional will be responsible for reviewing detailed designs for 230/60kV systems, overseeing the installation of 230kV SF6 circuit breakers and 230/60kV autotransformers, and evaluating testing and commissioning plans. Key deliverables include technical design reviews and comprehensive commissioning reports. This opportunity requires a Professional Engineer license and falls under NAICS code 541330. The work is to be performed in Lodi, California. Interested parties must respond by the deadline of October 24, 2026.

General Info

Electrical engineering oversight for Lodi high-voltage systems; PE license required by October 24, 2026.

Place of Performance

Lodi, CA, 95240, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260903039.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Guild 230/60 kV Substation Owner’s Engineer Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lodi – Electric Utility (LEU)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs independent technical review and oversight of high-voltage electrical designs for prime contractors on City of Lodi – Electric Utility (LEU) substation projects. Reviews detailed designs for 230/60kV systems, oversees installation of 230/60kV autotransformers and 230kV SF6 circuit breakers, and reviews testing and commissioning plans. Requires PE license. Delivers technical design reviews and commissioning reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details

More opportunities from California → City of Lodi – Electric Utility (LEU)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS