Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Electrical Power & Safety Studies

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 26-093.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP Biosolids Facility Upgrade Consulting Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Guelph
ContactsNo contacts available
OfficeN/A
Organization / AgencyCity of Guelph
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical engineering studies and installs high-voltage infrastructure for prime contractors on City of Guelph wastewater projects. Conducts Short Circuit Coordination and Arc Flash Studies and installs electrical panels and cabling. Adheres to Canadian Electrical Code and NFPA 70E. Delivers certified Arc Flash and Short Circuit Coordination reports and installed electrical systems.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
26-169
Solicitation # SJPC-26-169
The Balzano Lift Truck project, solicitation SJPC-26-169, is a public works procurement by the South Jersey Port Corporation for the installation of electric vehicle charging infrastructure at the Balzano Marine Terminal in Camden, New Jersey. The primary objective is to establish charging facilities for two Taylor ZLC-995 top loader trucks and five Ford Lightning work trucks. The technical scope includes the installation of a 1MVA transformer, a 1200A main disconnect, a 480V panel, two 200kW chargers, a 112.5kVA transformer, a 208V panel, and five 11.5kW chargers. The contractor is responsible for all labor, materials, and supervision, including the installation of underground conduits, ground rings, and precast transformer pads, all performed in accordance with NEC 2020, NFPA 70E, and OSHA standards. The contract is subject to stringent regulatory and compliance requirements, including New Jersey State prevailing wage laws, Executive Order 151 regarding equal employment opportunity, and the Build America, Buy America (BABA) act for the 200kW charging stations. Bidders must provide performance and payment bonds, a consent of surety, and disclose political contributions via the NJ ELEC affidavit. The project emphasizes small business participation, with a 25 percent set-aside goal for certified Small Business Enterprises. Award evaluation is based on proposal completeness, with specific rules for resolving discrepancies in favor of unit prices and written words. Final deliverables include a complete set of redline drawings submitted to the owner's engineer upon project completion.
South Jersey Ports

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details

More opportunities from City of Guelph

Same awarding agency

NAICS: 541330
New
International
RFP Biosolids Facility Upgrade Consulting Services
Solicitation # 26-093
The City of Guelph is soliciting proposals from experienced consulting engineering firms to provide design, engineering, and contract administration services for the Biosolids Facility Upgrade at its Water Resource Recovery Centre. The project aims to design and support the construction of a facility capable of meeting biosolids management needs through the 2051 planning horizon. Key deliverables include 100 percent completed design documents and cost estimates, regulatory permit assistance, a third-party inspection and testing plan, and updated operation and maintenance manuals. The scope specifically involves the declassification of a building and tunnel area, requiring HVAC systems to maintain declassified criteria with SCADA system alarm notifications. The contract is a lump sum agreement governed by the City's Procurement By-law and CCDC2 construction documents. Award selection is based on a weighted score consisting of a technical proposal (90 points) and a fees proposal (10 points), with a minimum technical score of 60 percent required to qualify. The selected firm must provide highly qualified personnel, including a Process/Mechanical Lead and Electrical/SCADA Lead with at least 10 years of experience, a Senior Contract Administrator with 8 years of experience, and a Site Inspector with 5 years of experience. Required insurance includes five million dollars in Commercial General Liability and two million dollars in Professional Liability. Performance continues until the later of three years after substantial performance, two years after certification of completion, or three months after the construction warranty expires.
Engineering Services

POSTED

about 23 hours ago

DEADLINE

in 27 days
View Details
NAICS: 236220
New
International
Pre-Qualification of General Construction Contracting Services for City Facilities
Solicitation # 26-075
The City of Guelph is seeking to establish a list of pre-qualified general construction contractors to support the Facilities and Energy Management Department with capital improvements, renovations, repairs, and maintenance across various city-owned facilities. This Request for Pre-qualification (RFPQ), solicitation number 26-075, aims to identify responsible applicants for two distinct project tiers: Category A for projects up to $500,000 and Category B for projects between $500,000 and $2,000,000. The City anticipates inviting pre-qualified suppliers to bid on approximately twenty-five or more projects over an initial three-year term ending December 31, 2029, with the option to extend for two additional one-year periods. Applicants must pass mandatory requirements, including the disclosure of convictions or litigation and the provision of a compliant surety letter from an Ontario-licensed company. Evaluation is conducted in two stages, focusing on corporate qualifications, organizational capacity, key personnel, and category-specific project experience. Successful contractors will be expected to provide all labor, materials, and equipment while adhering to the Accessibility for Ontarians with Disabilities Act and the Workplace Safety and Insurance Act. Contracts may be administered via CCDC 2 Stipulated Price Contracts or the City's Supply and Installation Agreement, featuring a 24-month warranty period and payment terms of 28 days upon receipt of a proper invoice.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS