Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electrical Power System Engineering Consultant

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sacramento Department of Utilities is seeking an Electrical Power System Engineering Consultant to perform specialized power system studies for facility projects. The selected subcontractor will be responsible for on-site data collection and the creation of SKM files to conduct short circuit, load flow, equipment evaluation, coordination, and arc flash hazard analyses. All work must adhere to NEC standards and NFPA 70E Article 130.5, with final deliverables consisting of stamped reports and SKM files. To qualify for this engagement, the consultant must utilize SKM Power Tools for Windows software and provide a California Registered Professional Engineer stamp for all final documentation. This subcontract opportunity is listed under NAICS code 541330, with a response deadline of November 4, 2026.

General Info

Sacramento seeks an electrical consultant for power system studies and stamped SKM reports.

Documents

This scope was carved out of P26141363019.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Electrical Studies for DOU Facilities

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → DOU - Utilities Department of City of Sacramento
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical power system studies for prime contractors on City of Sacramento Department of Utilities facility projects. Conducts on-site data collection, creates SKM files, and performs short circuit, load flow, equipment evaluation, coordination, and arc flash hazard analysis per NFPA 70E Article 130.5 and NEC standards. Requires SKM Power Tools for Windows software and a California Registered Professional Engineer (PE) stamp. Delivers stamped final reports and SKM files.

Similar Contracts

Same NAICS industry code

More opportunities from California → DOU - Utilities Department of City of Sacramento

Same awarding agency

NAICS: 541330
New
SLED
Electrical Studies for DOU Facilities
Solicitation # P26141363019
The City of Sacramento Department of Utilities is seeking a professional engineering firm to conduct comprehensive electrical studies for an initial 31 facilities, with a long-term goal of updating approximately 200 facilities over a five-year term. The scope of work includes Short Circuit, Load Flow, Equipment Evaluation, Coordination, and Protective Relaying Device Analysis, as well as Arc Flash Hazard Analysis and Mitigation Reports. Depending on the facility, the contractor will perform either a Full Electrical Study, which includes data collection and file creation, or a Five-Year Review Study using existing City-provided data. All analysis must be performed using the latest version of SKM Systems Analysis, Inc., Power Tools for Windows software, and final deliverables must be reviewed, stamped, and signed by a Registered Electrical Engineer in the state of California. The project has a proposed budget of 1,320,000 dollars and will be awarded based on best value, considering written proposals and potential interviews. Key requirements include the production and installation of machine-printed arc flash labels compliant with NFPA 70E and NEC standards, as well as the submission of a performance bond within ten days of the intent to award. Proposers must provide a detailed work plan and timeline, and those qualifying as Local Business Enterprises may receive a 5 percent preference. All final reports and electronic SKM files must be submitted via USB or shared drive following approval from the City Engineer.
Engineering Services

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS