Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical System Design, Supply, and Installation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 15 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 15 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 15 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 15 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract titled Electrical System Design, Supply, and Installation requires the full scope of electrical systems work including power distribution, lighting, motor controls, and instrumentation to be furnished and installed in strict compliance with NFPA 70 and applicable labeling standards. The work is scoped for performance in Fargo, North Dakota with a zip code of 58102, and all components must meet national electrical safety codes and industry labeling requirements to ensure operational integrity and regulatory compliance. The procurement is structured as a subcontract under a Total Small Business Set-Aside, classified under NAICS code 238210, and is managed by the USDA Agricultural Research Service through its Fargo facility. All bids must be submitted by the deadline of July 30, 2026 at 5:00 PM, with the solicitation posted on June 26, 2026, and participation is restricted to small businesses certified under the SBA’s set-aside program.

General Info

Small business subcontract for electrical systems installation in Fargo, ND, compliant with NFPA 70, due July 30, 2026.

Agency

Department Of Agriculture → USDA Ars Afm ApdView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Fargo, ND, 58102, USA

Set-Aside

SBA

Documents

This scope was carved out of 1232SA26Q0870.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Greenhouse Phase V Renovation (Fargo, ND)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Ars Afm Apd
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → USDA Ars Afm Apd
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Furnish and install electrical systems including power distribution, lighting, motor controls, and instrumentation, compliant with NFPA 70 and labeling standards.

More opportunities from Department Of Agriculture → USDA Ars Afm Apd

Same awarding agency

NAICS: 237110
New
Federal
Install Sewer Lift Station Pumps and Controls, Stoneville, Mississippi
Solicitation # 1232SA26Q1006
Solicitation 1232SA26Q1006 is a Request for Quotation issued by the USDA Agricultural Research Service for the removal of existing sewer lift station pumps and controls and the installation of new direct replacement Homa pumps and controls at Building 6, located at 141 Experiment Station Road in Stoneville, Mississippi. This acquisition is a total small business set-aside under NAICS code 237110. The project requires the contractor to provide all necessary equipment, labor, and materials, with a required performance completion period of 90 days from the date of award. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, evaluating offers for technical acceptability and a neutral or acceptable past performance rating. Offerors must submit detailed pricing including labor, programming, and equipment costs by September 15, 2026, at 2:00 PM Central Time via email to Erin Riffey. Key compliance requirements include the submission of a site-specific safety plan within seven days of award, adherence to the Service Contract Act wage determinations for Mississippi, and compliance with FAR 52.219-14 limitations on subcontracting. Amendment 0001 provides critical responses to RFIs regarding technical specifications and site visits that must be acknowledged by the bidder.
Water and Sewer Line and Related Structures Construction

POSTED

about 19 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238220
New
Federal
Water Softener Install Carl Hayden Research Center
Solicitation # 1232SA26Q1487
Solicitation 1232SA26Q1487 is a combined synopsis and request for quotation issued by the USDA ARS for the installation of a complete water softener system at Building 150 of the Carl Hayden Bee Research Center in Tucson, Arizona. This acquisition is a total set-aside for small business concerns under NAICS code 238220. The scope of work requires the contractor to provide all labor, materials, and warranties to install a 24x72 water softener with a brine salt tank, utilizing copper parts and piping, and establishing a drain line to the floor drain. All work must comply with Federal, State, and Local Code Standards, Unified Facilities Guide Specifications, and ARS 242.1M standards. The contract will be awarded as a firm-fixed price purchase order based on a lowest-price technically acceptable process. Offerors must submit quotations by September 21, 2026, and are required to complete specific blocks of the solicitation form along with certifications regarding SAM registration, recovered materials, and anti-discrimination and DEI compliance. The contractor is responsible for quality control and must adhere to Wage Determination 2015-5473 for Pima County, Arizona. Final acceptance is subject to inspection and approval by the Contracting Officer or Location Monitor to ensure the system is leak-free and functioning properly.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 19 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238210
New
Federal
Supply and Install Greenhouse Evaporative Cooling System, Stoneville, Mississippi
Solicitation # 1232SA26Q1000
Solicitation 1232SA26Q1000 is a combined synopsis and request for quotation issued by the USDA ARS for the supply and installation of an evaporative cooling system at Building 5, Greenhouse 2 in Stoneville, Mississippi. This firm-fixed-price acquisition is a total small business set-aside under NAICS code 238210. The scope of work involves the removal and disposal of eight existing cooling pads and four submersible pumps, followed by the installation of eight new Acme Kool-Cel evaporative cellulose cross-fluted cooling pads and eight Munters Aerotech Vortex VX24F1CT side wall fans across four plant rooms. The project requires a completion timeline of 90 days from the notice to proceed and mandates the submission of a site-specific safety and accident prevention plan within seven days of the award. The government will award the contract based on the lowest price technically acceptable criteria, evaluating the lowest priced offer for technical acceptability and past performance. To be considered responsive, offerors must provide detailed pricing, a completed self-performance and subcontracting disclosure checklist, and specific representations and certifications. All quotations are due by September 15, 2026, at 1300 CT. Key compliance requirements include adherence to FAR 52.219-14 limitations on subcontracting, SAM registration, and the provision of a contract-specific QA/QC plan. Contractors are responsible for incorporating any applicable state taxes into their pricing, as the government will not provide equitable adjustments for such costs.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 19 hours ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS