Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Electrical Systems Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the installation of comprehensive electrical systems, including conduits, wiring, grounding, and control instrumentation, all aligned with the National Electrical Code and NIST standards to ensure safety, reliability, and regulatory compliance. The work is classified as a subcontract under NAICS code 238210, indicating it pertains to electrical contracting services, and is set to be performed under the oversight of the California-based Procurement agency. The solicitation was posted on July 14, 2026, with a firm deadline for responses set for September 1, 2026, at 6:00 PM, leaving potential contractors approximately seven weeks to prepare and submit proposals. The place of performance and point of contact details are not specified, and there is no set-aside designation, meaning all eligible contractors may compete without restriction. Interested parties must access the full solicitation through the provided online portal for additional requirements or technical specifications.

General Info

Electrical installation contract under NAICS 238210, due September 1, 2026, compliant with NEC and NIST standards.

Agency

California → ProcurementView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Procurement
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of electrical systems including conduits, wiring, grounding, and control instrumentation compliant with NEC and NIST standards.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Main Terminal Improvement Program Emergency PowerThe Main Terminal Improvement Program – Emergency Power project seeks to equip the Main Terminal, concourses, and parking garage with emergency power systems compliant with NEC 700, 701, and 702 requirements, ensuring uninterrupted critical operations in a 24/7/365 airport environment. The contract, issued by the Port of Seattle’s Aviation Project Management Group, has an estimated value of $3,348,000 and will be executed under a two-year term with the possibility of extension at the Port’s sole discretion. Work will be authorized through Service Directives using either firm fixed price or time and expense billing structures, with strict limitations on subconsultant markups—four percent for first-tier and zero percent for second-tier—and no markups allowed on travel, materials, or supplies except for lab services. Billing is monthly with Net 30 payment terms, and consultants must report subconsultant payments electronically via the Port’s Contractor Database System, ensuring transparency in diversity contracting efforts. Proposals must be submitted via email by August 6, 2026, at 12:00 PM PT, with strict formatting requirements including a searchable PDF proposal body limited to eight pages, separate attachments for the Diversity in Contracting Inclusion Plan, Company Information, Resumes, and Evidence of Agreement, and no compressed file attachments permitted. Evaluation prioritizes specialized experience and technical competence of key personnel alongside interview performance, with proposals rated as Outstanding, Good, Acceptable, Marginal, or Unacceptable based on approach, understanding, and risk assessment. Compliance with federal, state, and local laws including Title VI of the Civil Rights Act, Section 504 of the Rehabilitation Act, the Trafficking Victims Protection Act, and Washington State’s Public Disclosure Act is mandatory, along with adherence to non-discrimination and affirmative action obligations that flow down to all subcontractors. Contractors must provide proof of workers' compensation and other specialized insurance coverage, indemnify the Port against negligence-related losses, and maintain all records on generally accepted accounting principles for audit purposes for at least three years post-completion. All deliverables must meet Port-specific standards, including participation in the 30% Design Review and submission of QA/QC checklists, a Design Quality Management Plan, and performance reports, with time being of the essence in all project phases.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the comprehensive design, permitting, and construction of a new camera surveillance system across the Bagwell and North Cargo Operations areas of the Port of Seattle, with the goal of enhancing security and enforcement capabilities through higher-resolution video coverage. Current camera placements, focused primarily on conveyor systems and security doors, will be expanded to include main drive lanes and entrances in the Bagwell area, ensuring improved visibility of vehicle movement and compliance with port regulations. In the North Cargo Operations zone, flexible surveillance will be implemented using Pan Tilt Zoom units to provide dynamic, user-controllable coverage over large surface areas, addressing gaps in existing monitoring. A total of 50 cameras will be installed at 43 distinct locations, combining fixed and adjustable systems to optimize surveillance efficiency and forensic accuracy. The project is led by the Aviation Project Management Group under the Port of Seattle, with Angela Peterson as the primary point of contact and Randa Williams serving as the Project Manager. The work is classified under NAICS code 238210 for electrical contractors and is forecasted with a posted date of July 23, 2026, though no solicitation number or set-aside details are provided. The scope is narrowly focused on operational security enhancement, with no mention of maintenance, training, or future upgrades.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle is planning to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility located in SeaTac, specifically targeting the removal of all PFAS-contaminated components. This project entails the complete dismantling and disposal of the current wet foam system, including tanks, piping, valves, and sprinkler heads contaminated with harmful substances, and the design and installation of a new full dry chemical fire suppression system. The new system will include all necessary components such as reserve tanks, pumps, valves, sprinkler lines, and sprinkler heads, ensuring full compliance with current fire safety standards. All new equipment must be integrated with the facility’s existing fire alarm system to ensure seamless operation and emergency response coordination. This initiative is part of a proactive effort to eliminate environmental and health risks posed by PFAS chemicals previously used in fire suppression. The project is classified under NAICS code 238210 and is being managed by the Port of Seattle’s Aviation Project Management Group. The work is scheduled under a quick turnaround (QTA) framework, indicating urgency and efficiency requirements. Primary point of contact for inquiries is Todd Rehm, with Pat Nakamura serving as the project manager. The solicitation is publicly forecasted with a posting date of July 23, 2026, and all interested parties are directed to the official Port of Seattle procurement portal for further details and future bidding opportunities.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
International
STRUCTURED CABLING INFRASTRUCTURE UPGRADE PARISH COURTS OF JAMAICAThe Court Administration Division of the Judicial Branch of Jamaica is seeking qualified Structured Cabling Contractors to deliver a comprehensive cabling infrastructure upgrade across selected Parish Courts. The scope encompasses the full lifecycle of the project including design, supply, installation, testing, certification, documentation, and commissioning of a modern, standardized structured cabling system. This initiative is integral to the Judiciary’s broader modernization strategy, aiming to establish a secure, scalable, and high-performance network foundation capable of meeting current and anticipated information and communications technology demands. The system must support reliable data transmission, future expansion, and integration with existing and emerging digital services within court facilities. Proposals must be submitted by the response deadline of August 28, 2026, under solicitation number 1519/565, which was posted on July 22, 2026. The contract is managed by Court Management Services under the Government of Jamaica, with all work to be performed at designated Parish Court locations across the country. Contractors are expected to demonstrate proven experience in delivering similar large-scale structured cabling projects with adherence to industry standards for performance, durability, and security. Documentation and certification outputs will be critical components of deliverables, ensuring traceability, compliance, and long-term maintainability of the installed infrastructure.
Court Management Services

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Procurement

Same awarding agency

NAICS: 237990
SLED
FE23-03 (Construction), WETWELL LEVEL MONITORING UPGRADE AT COLLECTIONS PUMP STATIONSThe contract pertains to the wetwell level monitoring upgrade at multiple collections pump stations in Orange County, California, with a total estimated value of $450,000 under a firm fixed price structure. The scope includes furnishing, installing, and testing electrical grounding and bonding systems across key locations such as Bay Bridge, Crystal Cove, Edinger, and MacArthur Pump Stations, along with additional sites including Slater, Lido, A St., and 15th St. Work must comply with NFPA 70, UL 467, IEEE 80, IEEE 142, IEEE 837, Cal/OSHA, and OSHA standards, ensuring safety, reliability, and operational integrity. Deliverables require full system integration with instrumentation grounding, conductor routing, and verification testing to industry benchmarks including NETA certification for test personnel and NIST-traceable calibration. The contractor must hold a valid California "A" or "C-10" license and self-perform at least 30% of the work, with subcontracting limited to 70%. All subcontractors must also maintain appropriate state licensure and DIR registration under California labor law. The project has a baseline duration of 250 calendar days, with liquidated damages of $350 per day for delays beyond final completion, and payment terms are net 30 days upon submission of properly formatted applications through OC SAN’s internal PCMS system. No federal invoicing systems like WAWF are used; financial records must be maintained for audit under internal clauses GC-51 and GC-57, though no specific Treasury Account Symbols or federal appropriation codes are provided. Bids must be submitted electronically via the OC SAN Vendor Portal on OpenGov by September 1, 2026, with hard copies of bid security delivered to the Fountain Valley office. Packaging and labeling requirements mandate stainless steel or UV-stable plastic tags with laser engraving, Helvetica font, and specific dimensions for equipment, while hazardous materials must be labeled per OSHA 29 CFR 1910.1200. All equipment must include comprehensive conductor and conduit markings, and no barcoding is required. Insurance must be maintained throughout performance and warranty, and the contractor must execute signed bonds, certificates, and contracts within 15 days of award or face forfeiture. The contracting office is located in Fountain Valley, with primary point of contact Stephanie Reveles, and no designated COR, COTR, or PCO
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in about 1 month
View Details