Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

FE23-03 (Construction), WETWELL LEVEL MONITORING UPGRADE AT COLLECTIONS PUMP STATIONS

Active
FE23-03 (Construction)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the wetwell level monitoring upgrade at multiple collections pump stations in Orange County, California, with a total estimated value of $450,000 under a firm fixed price structure. The scope includes furnishing, installing, and testing electrical grounding and bonding systems across key locations such as Bay Bridge, Crystal Cove, Edinger, and MacArthur Pump Stations, along with additional sites including Slater, Lido, A St., and 15th St. Work must comply with NFPA 70, UL 467, IEEE 80, IEEE 142, IEEE 837, Cal/OSHA, and OSHA standards, ensuring safety, reliability, and operational integrity. Deliverables require full system integration with instrumentation grounding, conductor routing, and verification testing to industry benchmarks including NETA certification for test personnel and NIST-traceable calibration. The contractor must hold a valid California "A" or "C-10" license and self-perform at least 30% of the work, with subcontracting limited to 70%. All subcontractors must also maintain appropriate state licensure and DIR registration under California labor law. The project has a baseline duration of 250 calendar days, with liquidated damages of $350 per day for delays beyond final completion, and payment terms are net 30 days upon submission of properly formatted applications through OC SAN’s internal PCMS system. No federal invoicing systems like WAWF are used; financial records must be maintained for audit under internal clauses GC-51 and GC-57, though no specific Treasury Account Symbols or federal appropriation codes are provided. Bids must be submitted electronically via the OC SAN Vendor Portal on OpenGov by September 1, 2026, with hard copies of bid security delivered to the Fountain Valley office. Packaging and labeling requirements mandate stainless steel or UV-stable plastic tags with laser engraving, Helvetica font, and specific dimensions for equipment, while hazardous materials must be labeled per OSHA 29 CFR 1910.1200. All equipment must include comprehensive conductor and conduit markings, and no barcoding is required. Insurance must be maintained throughout performance and warranty, and the contractor must execute signed bonds, certificates, and contracts within 15 days of award or face forfeiture. The contracting office is located in Fountain Valley, with primary point of contact Stephanie Reveles, and no designated COR, COTR, or PCO

General Info

Wetwell monitoring upgrade at Orange County pump stations for $450,000, firm fixed price, 250 days, California-licensed contractor.

Agency

California → ProcurementView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(3)

FE23-03 Bid Set Plans

PDFbid-set-plans

FE23-03 Notice Inviting Bids for Wetwell Level Monitoring Upgrade

PDFifb

FE23-03 Wetwell Level Monitoring Upgrade Invitation for Bids

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement
Contacts1 person available
OfficeFountain Valley, CA, 92708, US
Organization / Agency
California → Procurement
View Agency Profile
Office AddressFountain Valley, CA, 92708, US
Contacts
Stephanie RevelesContracts/Purchasing Technician

Interested Companies (22)

Show more
ADS
Huntsville, AL
GSE Construction
Livermore, CA
LEED Electric
Santa Fe Springs, CA

See All 22 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
FE23-03, WETWELL LEVEL MONITORING UPGRADE AT COLLECTIONS PUMP STATIONS. PLEASE SEE NOTICE INVITING BIDS.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Deaerator (DA) and Condensate System UpgradesThe Port of Seattle’s Aviation Project Management Group is seeking contractors to replace the Deaerator and Condensate tanks in the Central Mechanical Plant at Seattle-Tacoma International Airport, with an estimated contract value between $6.25 million and $7.5 million. The scope of work requires full procurement, installation, testing, and commissioning of new equipment in accordance with performance-based specifications outlined in Divisions 0 through 48 of the Project Manual, ensuring compliance with industry standards including ANSI A13.1, UL 969, ASTM E84, ASTM F594, and the International Building Code. All work must be performed on-site with strict adherence to safety protocols requiring OSHA 500-certified Safety Representatives and designated Competent Persons for fall protection, excavation, and lock-out/tag-out procedures, alongside a site-specific safety plan, hot work permits, and a drug-free workplace policy. The contract follows a Lowest Price Technically Acceptable award model, where bidders must be financially and technically responsible, meet bonding and insurance requirements, and demonstrate compliance with WMBE participation goals of at least 5% through documented outreach and self-certification. Submissions must be made electronically via email with a specific subject line format, not exceeding 10 MB per email, and late submissions will be rejected. Materials must be delivered to the site in factory packaging, with responsibility transferring upon arrival, and all labeling must meet ANSI and UL standards using durable brass or multilayer plastic materials with white-on-black contrast text and stainless steel fasteners. Final acceptance is contingent upon successful testing, submission of operation manuals, as-built drawings, and compliance certifications, with inspections conducted exclusively at the project site by the Port or its Engineer, though the Contractor retains sole responsibility for ensuring all work meets contractual obligations.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a wide-ranging modernization and safety upgrade initiative for the airfield infrastructure at the Port of Seattle, targeting critical systems including lighting, pavement, utilities, drainage, and fire access. Key components involve replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to enhance energy efficiency and operational reliability, while also replacing deteriorating pavement and essential utilities to maintain structural integrity and prevent service disruptions. Wildlife hazard mitigation measures include eliminating turf edge dams along runways and taxiways, installing anti-perching devices on airfield signage to deter birds, and addressing ponding issues through regrading and the installation of comprehensive storm drainage infrastructure to reduce wildlife attraction and improve safety. Additionally, the project includes the replacement of failing flush fire hydrant access hatches to ensure prompt and unimpeded access for emergency responders during incidents. All work is coordinated under a single solicitation titled AIRFIELD 2028 ALL PROJECTS, which bundles multiple capital improvement efforts funded through aviation infrastructure programs. The contract is managed by the Aviation Project Management Group at the Port of Seattle, with Yanet Maldonado serving as the primary point of contact for inquiries and coordination. The initiative aligns with long-term aviation safety and operational standards, aiming to reduce risks, improve regulatory compliance, and extend the service life of critical airfield assets through comprehensive, integrated upgrades.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive suite of airfield infrastructure improvements at the Port of Seattle, focusing on modernization, safety, and operational reliability. Key components include the replacement of airfield lighting circuits that demonstrate low megger readings with new LED lighting fixtures and signage to enhance visibility and energy efficiency. Concurrently, failing pavement sections and critical utilities throughout the airfield will be upgraded to prevent deterioration and ensure continued airfield integrity. Wildlife hazard mitigation efforts involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on airfield signs to deter bird activity, and addressing ponding issues through regrading and the installation of storm drainage infrastructure to reduce water accumulation and associated risks. Additional work includes the replacement of deteriorated flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency response teams. The project is classified under NAICS code 237990 and is managed by the Aviation Project Management Group under the Port of Seattle, with Yanet Maldonado serving as the primary point of contact. While the solicitation number is not provided, the forecast was posted on July 23, 2026, indicating this is a planned procurement intended to align with long-term airfield improvement goals under AIP, AUI, CIRCUITS, and FOD initiatives. All work is expected to be performed at the Port of Seattle’s airfield facilities, with an emphasis on maintaining uninterrupted operations during execution.
Aviation Project Management Group

POSTED

about 6 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
International
PRE-QUALIFICATION - Hermitage Dam Rehabilitation Project – Construction Works (Phase 1)The National Water Commission of Jamaica is soliciting prequalification bids for the urgent rehabilitation works of the Hermitage Dam, aiming to enhance its structural stability to meet minimum acceptable standards in line with modern engineering practices. The primary objective is to ensure the continued reliable operation of the water supply pipeline servicing critical communities in the coming years, addressing immediate safety and functionality concerns through targeted construction interventions. This initial phase focuses on pre-qualifying qualified contractors capable of delivering complex geotechnical and civil works under tight timelines and stringent safety requirements. The solicitation, numbered 1618/1422, was posted on July 22, 2026, with a response deadline of August 26, 2026, at 4:00 PM. The project is classified as a construction works tender under Phase 1, with no set-aside provisions applied. Interested entities must meet technical and financial criteria to be considered for inclusion in the pre-qualified bidder pool. All submissions must be directed through the official government procurement portal, and performance of the subsequent works will be localized to the Hermitage Dam site within Jamaica. This prequalification effort is a foundational step before awarding the actual rehabilitation contract, ensuring only competent and credible construction firms proceed to the next stages.
National Water Commission

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Procurement

Same awarding agency