Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Emergency Culvert Replacement Project 2026

Closed
3260196State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, WBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must submit their quotes by November 18, 2025, through the Building Connected system, and may coordinate with Lead Estimator Ken Johnston for further project details.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 237310
New
SLED
26-303-0005
Solicitation # 26-303-0005
The Garrie Cut-Off Bridge Replacement Project (Project No. 26-303-0005) is a construction solicitation issued by the Police Jury of Calcasieu Parish, Louisiana, with an engineer's opinion of probable cost totaling $1,476,057.30. The scope of work involves the replacement of a bridge structure in Calcasieu Parish, including localized drainage improvements and scour protection in Ward 5. The project must be substantially completed within 176 calendar days from the date specified in the Notice to Proceed. All work must adhere to the 2016 Louisiana Standard Specifications for Roads and Bridges, AASHTO LRFD Bridge Design Specifications, and U.S. Army Corps of Engineers permits. The contract will be awarded to the lowest responsible bidder based on the sum of the base bid and any accepted alternates. Bidders must submit electronic bids and provide bid security equal to 5% of the total bid amount. The successful contractor is required to furnish performance and payment bonds each equal to 100% of the contract amount and provide a Firearm Entity Non-Discrimination Certification. Payment is processed via monthly invoices, with a 5% retainage withheld for projects equal to or exceeding $500,000. Final acceptance is contingent upon a joint inspection by the Parish Engineer and the successful completion of a punch list within 45 calendar days of substantial completion.
CPPJ Road, Bridge, & Utility

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 237310
New
SLED
Cloverdale Road, Victory Road to Overland Road
Solicitation # CT227-08
Solicitation CT227-08 is an invitation for bids from the Ada County Highway District (ACHD) for bridge deck repairs and infrastructure improvements on Cloverdale Road, spanning from Victory Road to Overland Road in Ada County, Idaho. The scope of work includes bridge deck repairs, the installation of 40-foot steel luminaire poles and LED lighting, interconnect cables, and specific pavement markings using tape for concrete and thermoplastic or paint for asphalt. The project is divided into multiple construction phases, with a requirement for the contractor to manage quality control and adhere to ATSSA and MUTCD standards for work zone traffic control. The contract will be awarded to the lowest cost and responsive bidder, provided the bid does not exceed the Engineer's Estimate by more than ten percent. Bids must be submitted electronically via the ACHD eProcurement Portal by November 4, 2026, at 3:00pm, and must include bid security in the form of a certified check, cashier's check, or bid bond. The intended Notice to Proceed is January 5, 2027, with a substantial completion deadline of October 29, 2027, although specific irrigation and bridge work must be completed by March 15, 2026. The successful bidder must provide performance and labor/material bonds covering two years post-completion and comply with all federal and state laws regarding minimum wage and environmental protection.
Projects

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to rehabilitate roadways on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. The scope of work includes removing and reconstructing asphalt concrete pavement with rubberized asphalt concrete, installing ADA access ramps, curb and gutter, sidewalks, and adjusting utility pull-boxes. Additional requirements include the installation of striping, signage, pavement markings, and specific fiber optic cable labeling and installation standards. The project has an estimated cost of 4,213,400 dollars and must be completed within 70 working days from the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid Proposal. Bidders must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A critical requirement is compliance with the Community Workforce Agreement, which mandates that the contractor and all subcontractors sign a Letter of Assent and strive to meet work hour goals of 40 percent for local hires and 5 percent for veterans, disadvantaged individuals, and Anaheim high school graduates. Bids must be submitted via OpenGov by November 5, 2026, and must include a bid security of 10 percent of the total bid amount. Awarded contractors are required to provide faithful performance and payment bonds, as well as comprehensive general liability insurance.
Public Works

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
301 N. Main Street Parking Lot
Solicitation # 49738
The City of Marysville is soliciting bids for a single prime, stipulated price contract to construct a new public parking lot at 301 N. Main Street in uptown Marysville, Ohio. The scope of work includes clearing and grubbing, removal of drive aprons and sidewalks, installation of pavement, curbs, and under drains, as well as pavement markings and permanent seeding. All construction must adhere to the 2023 Ohio Department of Transportation Construction and Material Specifications, specifically Items 614, 623, and 624, along with City of Marysville standard drawings and ADA compliance for sidewalks and ramps. Bids are due by November 16, 2026, via Bid Express and must be submitted on a unit price basis. The contract will be awarded to the lowest responsive and responsible bidder based on factors including prior performance, financial capacity, and operational resources. Required submission documents include a bid security bond, a Property Tax Affidavit, and a Contractor Equal Employment Opportunity Certification. The successful contractor must also comply with Ohio Revised Code prevailing wage rates. Work is anticipated to commence on November 30, 2026, with an on-site work window between March 1, 2027, and August 31, 2027. Final completion is required within 60 days of starting on-site work and no later than October 31, 2027. The City of Marysville Division of Engineering will serve as the Engineer and owner's representative, overseeing quality control and reviewing monthly applications for payment.
City of Marysville

POSTED

about 5 hours ago

DEADLINE

in 13 days
NAICS: 237310
New
SLED
2027019
Solicitation # 2027019
Solicitation 2027019 is a unit price contract issued by the Spartanburg County Government for the Woodfin Ridge Subdivision project as part of the 2023 Asphalt Roadway Improvement Program. The scope of work focuses on road construction and paving services, specifically involving asphalt surface courses, cement modified recycled base (CMRB), milling, and pavement markings on North and South Woodfin Ridge Drive. Additional requirements include the construction of driveway aprons, mailbox turnouts, and intersection tie-ins. All work must adhere to the SCDOT 2025 Standard Specifications for Highway Construction and the Manual on Uniform Traffic Control Devices, with a target cross slope of 2.0 percent to ensure positive drainage and ADA accessibility. The contractor is responsible for providing HMA/WMA and CMRB mix designs 30 days prior to production, submitting rolling two-week look-ahead schedules every Wednesday, and providing a one-year materials-and-workmanship warranty. Payment is based on estimated quantities for unit price items, including asphalt removal and driveway courses, with a specific price adjustment mechanism for liquid asphalt binder costs based on the SCDOT monthly index. Administrative requirements include maintaining a minimum of 1 million dollars in general liability insurance, complying with South Carolina drug-free workplace laws, and adhering to strict communication protocols through bidexpress.com. Invoices are submitted to the County and are considered past due after 30 days, with no interest accruing on late payments.
Spartanburg County Government

POSTED

about 5 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Emergency Culvert Replacement Project 2026, solicitation number 3260196, is a public works project for Yuba County, California, with an estimated cost of 361,266 dollars. The scope of work involves emergency culvert replacement across various roads in the county, including the installation of corrugated steel and reinforced concrete pipes, traffic control systems, erosion control, and water pollution management. The project must be completed within 60 working days, with work beginning within 15 calendar days of the notice to proceed. Bids are due by 2:00 p.m. on August 12, 2026, and must be submitted as a sealed bid book to the Office of the County Clerk in Marysville. To be considered, bidders must provide a certified cashier's check or bid bond for 10 percent of the total bid price and guarantee the price for 60 days. The award will be granted to the lowest responsive and responsible bidder. Required documentation includes a noncollusion affidavit, debarment and suspension certifications, and EEO compliance. Post-award requirements include performance and payment bonds for 100 percent of the contract price, as well as specific liability insurance and subrogation waivers favoring the County. Project administration, including invoicing and deliverables, is managed electronically through the C-MIS system, and all work must adhere to Caltrans 2025 Standard Specifications and Yuba County Improvement Standards.

General Info

Emergency culvert replacement project, $361,266, 60-day completion, 10% bid bond, Yuba County, California.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeMarysville, CA, 95901, USA
Organization / AgencyCalifornia → Public Works
Office AddressMarysville, CA, 95901, USA
Contacts
Sanjot SainiAssistant engineer

Interested Companies (19)

Security 101 HoldingsWest Palm Beach, FL
edward t navickispenn valley, CA
BRCO ConstructorsRocklin, CA

See All 19 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The estimated cost of the project is $361,266. Complete the work within 60 working days. Each bid shall be accompanied by a certified cashier's check, or bid bond, in the amount of 10 percent of the total bid price, payable to Yuba County Department of Public Works, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening. The County reserves the right after opening the bids to reject any or all bids, to waive any informality in a bid or bid submittal, and to award to the lowest responsive, responsible bidder, as it may best serve the interests of the County.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal path, walking trails, a playground, fitness pods, and extensive landscaping. Key deliverables include a 12-foot main multi-modal path, a 6-foot secondary walking trail, and various paving installations using concrete, stabilized decomposed granite, and PIP rubber. The scope also encompasses site work, electrical installations for pedestrian and street lighting, and adherence to a Final Water Quality Management Plan and Storm Water Pollution Prevention Plan. The engineer's estimate for the project is $11,100,000, with a performance period of 190 contract days. Bidders must hold a Class A contractor's license and provide a California Department of Industrial Relations Registration number. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 pm, with the critical requirement that a hard copy original of the bid bond be delivered to the City Clerk by the same deadline to avoid being deemed non-responsive. The contract will be awarded to the apparent low bidder. Contractual obligations include providing payment, faithful performance, and guaranty bonds, as well as maintaining workers' compensation insurance and complying with California Labor Code prevailing wage requirements. Payment will be issued through monthly progress payments at 95% of the work value, with the final 5% retained until 60 days after the recordation of the Notice of Completion and the submission of as-built plans. Liquidated damages for delays are set at $8,800 per calendar day. All work must conform to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
La Palma Alleys Sewer Improvement Project
Solicitation # RCP2023-21228
The La Palma Alleys Sewer Improvement Project, solicitation RCP2023-21228, is a request for engineering design services issued by the City of Anaheim Public Works Department. The project aims to resolve capacity and operational deficiencies in Central Anaheim by replacing outdated 6-inch sewer pipes with the current 8-inch minimum standard to mitigate root intrusion and offset joints. Additionally, the scope includes identifying solutions to remove a previously unknown sag or siphon between manholes SW070319 and SW071102 on La Palma Avenue, as well as removing an existing siphon at the intersection of La Palma and Harbor. The design must also incorporate neighborhood greening and stormwater capture systems using modified tree wells and catch basins, while adhering to the Central Anaheim Master Plan of Sanitary Sewers and City design standards. Proposals are due by December 3, 2026, at 2:00 PM and must be submitted electronically via the OpenGov portal. The City utilizes a qualifications-based selection process, ranking consultants based on their experience and the qualifications of key personnel before negotiating a fair fee with the top-ranked firm. Awarded contractors must comply with California State Labor Code prevailing wages, Buy America requirements, and provide necessary performance bonds and insurance. Project deliverables include a Preliminary Design Report and CAD drawings, with final acceptance contingent upon the submission of CCTV inspection videos for pipes over four inches in diameter. Contract administration includes monthly invoicing based on a Work Breakdown Structure, with payments tied to the submission of bi-weekly project status reports.
Engineering Services

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS