Emergency Culvert Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Emergency Culvert Replacement Project, managed by the Coastside County Water District, involves the replacement of a failed culvert and necessary access road repairs in Half Moon Bay, San Mateo County. Located approximately 100 feet east of Pilarcitos Creek, the project is designed to mitigate public safety risks and ensure the continued delivery of services to customers. A primary objective is to prevent the loss of access to critical water supply infrastructure and protect potable water and fire suppression supply lines from potential disruption. The project is classified as a forecast under NAICS code 237990 and has been granted a Notice of Exemption from detailed environmental review under CEQA Guidelines Section 15269 due to the urgent nature of the public health and safety risks. Administrative oversight is provided by General Manager Mary Rogren and Water Distribution Operations Manager Darin Sturdivan. While the project is essential for infrastructure protection, specific contract values, performance periods, and evaluation factors have not yet been defined.

General Info

Emergency culvert and road repair to restore water supply, fire access, and safety without formal contract specs or pricing.

Agency

California → Coastside County Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Half Moon Bay, CA

Set-Aside

NONE

Documents

(1)

Emergency Culvert Replacement Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coastside County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coastside County Water District
Office AddressN/A
Contacts
Darin SturdivanWater Distribution Operations Manager

Full Description

Show more
The Emergency Culvert Replacement Project (Project) would replace the failed culvert and make necessary access road repairs to ensure continued services to CCWD’s customers and to mitigate risks to public safety and prevent CCWD from losing access to valuable water supply infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, vegetation clearance, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole through clearing, grubbing, and stone rework. The estimated value of the work ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Bids must be submitted as sealed envelopes to Fort Shafter, Hawaii, as electronic submissions are not permitted. Award is based on the lowest responsive and responsible bidder. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is contingent upon pre- and post-dredge multi-beam surveys meeting USACE accuracy standards. Failure to meet the delivery schedule may result in liquidated damages of 2,297 dollars per calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS