Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engine Hose Fabrication

Closed
52000PR260026323Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 326220
New
DIBBS
HOSE ASSEMBLY, NONMETAL
Solicitation # SPE7M0-27-T-0756
Solicitation SPE7M0-27-T-0756 is a small business set-aside issued by the Defense Logistics Agency for the procurement of one nonmetallic hose assembly, identified by NSN 4720015891315. The requirement is managed under the First Destination Transportation program with a delivery timeframe of five days after order, and the final delivery destination is Fort Riley, Kansas. The contract specifies a non-extendable shelf life of 120 months and requires strict adherence to MIL-STD-129 and MIL-STD-130N for marking and identification. Additionally, the contractor must provide supply chain traceability documentation and ensure that no Class I ozone-depleting chemicals are used in the production of the items. Quality assurance is governed by MIL-STD-1916 and ASQ H1331, with inspection and acceptance occurring at the destination. The procurement incorporates various DFARS and FAR clauses, including requirements for safeguarding covered defense information, compliance with the Buy American Act, and the prohibition of covered defense telecommunications equipment. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. The solicitation emphasizes the need for domestic material compliance and requires the contractor to follow specific DLA packaging requirements for procurement.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

about 20 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The U.S. Coast Guard’s Surface Forces Logistics Center is soliciting commercial services for the custom fabrication, assembly, and fitting of marine hoses for Over The Horizon – IV (OTH MK4) and Long Range Interceptor (LRI) vessels under a Firm Fixed Price Purchase Order with solicitation number 52000PR260026323. This procurement is a Total Small Business Set-Aside under NAICS code 326220, restricted exclusively to small businesses, and all offers must comply with applicable Federal Acquisition Regulation clauses including those related to labor standards, equal opportunity, telecommunications restrictions, and Kaspersky Lab prohibitions. Work must be performed on-site at U.S. Coast Guard SBPL Alameda, 1 Eagle Rd, Alameda, CA 94501, where contractors are required to measure and reference existing hoses directly due to the asset’s inability to leave the base, and all new hose assemblies must meet OEM and Maintenance Procedure Card specifications for material, pressure ratings, and safety compliance. The scope includes visual inspection of existing fittings for damage, removal and reinstallation of fittings, cutting and assembling new marine-grade hoses for systems including engine, fuel service, marine gear, cooling, lubrication, and turbocharger components, followed by mandatory hydrostatic pressure and leak testing using contractor-supplied test equipment and safety enclosures. Proposals must be submitted via email to the contracting officer by the deadline of July 14, 2026, with the solicitation number in the subject line, and must demonstrate technical capability, relevant past performance, and fair and reasonable pricing. Failure to comply with safety protocols, contract terms, or performance standards may result in rejection or non-acceptance. Upon award, work must begin within two days and be completed within two working days, with all hazardous waste and debris removed and the site left clean. Any additional work discovered during performance requires immediate reporting through a Condition Found Report with a commercial estimate. All modifications to the contract must be made in writing by the contracting officer, and no oral statements are binding. Invoicing must be submitted through the Invoice Processing Platform at ipp.gov, and the contractor is responsible for obtaining all necessary permits and licenses at no cost to the government.

General Info

Small business to fabricate, test, and install marine hoses on-site at Alameda per OEM specs within two days of award.

NAICS

326220 - Rubber and Plastics Hoses and Belting Manufacturing

Place of Performance

Alameda, CA, 94501, USA

Set-Aside

SBA

Documents

1

U.S. Coast Guard Marine Hose Fabrication SOW

DOCX, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 3(00040)
Contacts1 person available
OfficeBALTIMORE, MD, 21226, USA
Office AddressBALTIMORE, MD, 21226, USA
Contacts
Joshua Richardson

Full Description

Show more

Combined Synopsis/Solicitation & Statement of Work


Commercial Services for Marine Hose Fabrication (OTH MK4 & LRI)


Solicitation Number:


52000PR260026323 (Request For Quote - RFQ)


Agency:


U.S. Coast Guard, Surface Forces Logistics Center (SFLC)


Contract Type:


Firm Fixed Price Purchase Order


Set-Aside Information:


Total Small Business Set-Aside



Table of Contents


Right-click and select 'Update Field' to populate the table of contents.




1. Combined Synopsis & Solicitation


This is a combined synopsis/solicitation for commercial services, prepared in accordance with the format in subpart 12.6 of the FAR and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-87, effective, 7 March 2016. It is anticipated that a competitive price purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency.


1.1 Evaluation Criteria


Quotes will be evaluated based on the following factors:


  • Technical Capability: The offeror’s ability to perform the services described in the Performance Work Statement.
  • Past Performance: The offeror’s record of relevant and recent past performance.
  • Price: Fair and reasonable pricing.

1.2 Points of Contact & Submission


For any questions regarding this solicitation, please contact:



Quotes must be submitted via email to contact@example.gov. The subject line of the email should include the solicitation number: 52000PR260026323.


2. Statement of Work (SOW)


2.1 Scope


The objective of this contract is to obtain professional custom fabrication, assembly, and fitting services for new marine hoses for the Over The Horizon – IV (OTH MK4) and Long Range Interceptor (LRI) vessels. This includes marine gear hoses, engine hoses, and fuel service line hoses. All services must be performed to Original Equipment Manufacturer (OEM) and Maintenance Procedure Card (MPC) specifications to ensure optimal system pressure, leak-free performance, and maritime safety compliance.


Note: The MPC does not state the actual hose lengths; therefore, all newly created hoses must be measured and referenced directly from the present (existing) hoses. Asset is unavailable to leave base, reference must be performed on location.


2.2 Commencement, Prosecution, and Completion of Work


Upon acceptance, the contractor shall commence work within 02 days and work diligently to complete the entire project and have the fabricated hose assemblies ready for delivery or installation by 02 working days.


2.3 Information and Requirements


WARNING: VARIOUS STEPS IN THIS PROCEDURE MAY INVOLVE HIGH-PRESSURE TESTING EQUIPMENT OR SHARP EDGES. OBSERVE ALL SAFETY PRECAUTIONS WHEN WORKING WITH EQUIPMENT WITH SHARP EDGES. FAILURE TO COMPLY MAY RESULT IN SERIOUS PERSONAL INJURY. BEFORE EXECUTING THIS TASK, ENSURE ALL SAFETY AND HANDLING PROCEDURES ARE FOLLOWED.


A. Preliminary Steps


  • All fabricated hoses and fittings must be marine-grade and comply strictly with the exact material and safety specifications outlined on the applicable MPC.
  • Identify and verify the required hose lengths, internal/external diameters, pressure ratings, and fitting types required for the specific LRI and OTH systems.

B. Scope of Work (Fabrication, Assembly, & Testing)


  • Move hose to work space.
  • Inspect existing hose fittings visually for: (1) Burrs, (2) Stripped threads, (3) Bends, (4) Mushroomed areas.
  • Inspect all fuel service lines and fittings for: a. Correct hose, b. Chaffing, c. Splits, d. Holes, e. Bulges, f. Leaks, g. Proper fittings, h. Loose fittings, i. Loose connections.
  • Remove fittings from old hose (retain fittings for reinstallation).
  • Measure length of old hose using a measuring tape (reference from present hose as stated in Scope).
  • Cut a correct length of hose using a metal cutting handsaw.
  • Replace fittings with elbow pipe to tube and ferrule.
  • Install fittings on new hose. Remove any burrs on inside of cut edge.
  • Install swivel and assembly tool into hose and socket until swivel almost touches socket. Check hose for push out.
  • Remove assembly tool from swivel with two wrenches; verify swivel moves freely.
  • Install new hose assembly ensuring there are no twists or kinks.
  • Install hose on to the marine gear lower fitting.
  • Fabricate, assemble, and replace all specific hoses from sea chest, cooler, strainer, raw water pump, aftercooler, marine gear lube, heat exchanger, crankcase breather, lube oil filter, air box, turbocharger, etc.
  • Fabricate new Fuel Service Line Hoses with compliant, fire-resistant materials and secure fittings.
  • Perform hydrostatic pressure and leak testing of all completed hose assemblies to OEM and MPC certified levels. The contractor shall supply all necessary test benches, fittings, connectors, adapters, test plugs, and safety enclosures required.

2.4 Conditions Affecting the Work


Work conditions are subject to standard federal provisions.


2.5 Condition Found Report (CFR)


If additional work items are found, Contractor shall report findings immediately before work continues via CFR along with a commercial estimate of necessary work to be completed outside the original SOW.


2.6 After Award of the Contract


The contractor must immediately notify the contracting officer’s representative of their intended start date. The work shall be done in accordance with the specification.


2.7 Oral Modification


No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.


2.8 Workmanship


All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).


2.9 Permits


The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.


2.10 Clean Up


All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.


2.11 Upon Completion of Work


Contact the COR to arrange for inspection/acceptance of work.


2.12 Place of Performance & Points of Contact


Location of Work:


U.S. Coast Guard SBPL Alameda, 1 Eagle Rd, Alameda, CA 94501


Unit Contacts:


CWO Ricardo Sotelo, SBPL Alameda


Phone:


+1 (555) 000-0000


E-mail:


contact@example.gov




3. Invoicing


Invoicing in IPP: It is now a requirement that all invoicing for Purchase Orders will now be entered and processed through https://www.ipp.gov.


4. FAR Clauses


This order is subject to but is not limited to the following Federal Acquisition Regulations:


  • 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
  • 52.204-26 Covered Telecommunications Equipment or Services-Representation.
  • 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services.
  • 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services.
  • 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.
  • 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders.
  • 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.
  • 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
  • 52.222-41 Service Contract Labor Standards (formerly Service Contract Act).
  • 52.222-42 Statement of Equivalent Rates for Federal Hires.
  • 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment.
  • 52.237-2 Protection of Government Buildings, Equipment, and Vegetation.

4.1 Small Business Specific Clauses


  • FAR 52.219-6: Notice of Total Small Business Set-Aside
  • FAR 52.219-8: Utilization of Small Business Concerns
  • FAR 52.219-9: Small Business Subcontracting Plan
  • FAR 52.219-14: Limitations on Subcontracting
  • FAR 52.219-28: Post-Award Small Business Program Rerepresentation
  • FAR 52.204-10: Reporting Executive Compensation and First-Tier Subcontract Awards
  • FAR 52.222-35/36/37: Equal Opportunity and related clauses

5. Notice to Subcontractors


To ensure a fair and streamlined process, we will not be addressing questions from subcontractors regarding the information already provided in the Statement of Work or the solicitation documents. All necessary details are contained within this package.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 3(00040)

Same awarding agency

NAICS: 336611
Federal
Dry-Dock: USCG STA CAPE MAY (45665) FY27 UWB
Solicitation # 70Z04026QSBPL0016
Solicitation 70Z04026QSBPL0016 is a total small business set-aside request for quote for the FY27 drydock repairs and alterations of the USCG STA Cape May (vessel 45665). The project is scheduled for a period of performance from January 6, 2027, to February 4, 2027, with an anticipated award date of November 12, 2026. The scope of work includes 20 specific technical items, such as hull plating inspection, water jet servicing, diesel fuel tank cleaning, general welding, ultrasonic testing, and the preservation of underwater bodies. All work must adhere to Coast Guard Technical Publication 4993 and SFLC standards, requiring an onsite AMPP, QP-1, or NACE certified inspector to ensure quality control for critical-coated surfaces. The government will award a firm-fixed-price contract based on the lowest price technically acceptable approach. Evaluation factors include technical acceptability, price fairness, and a review of past performance from the last two to three years via CPARS or Past Performance Questionnaires. Quotes must be submitted electronically to Regina Elliott-Dougherty by October 28, 2026, and must include a signed SF1449, an Excel-based schedule of supplies and services, and various certifications regarding welding, insurance, and drydock capabilities. Payments will be processed through the Invoice Processing Platform based on the stage of completion, with 10 percent of the total contract price withheld until all deliverables are accepted.
Ship Building and Repairing

POSTED

about 1 month ago

DEADLINE

in about 5 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS