Engineering & Design Services for Railing Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Engineering and Design Services for Railing Systems supports projects within the Lake Huron and Elgin Area Water Supply System. The selected provider will be responsible for performing field verification of site conditions and dimensions for prime contractors, as well as preparing detailed fabrication and erection drawings. A critical requirement for this contract is the possession of a Professional Engineer license to provide the necessary engineered stamped drawings. The final deliverables include the stamped engineered drawings along with all fabrication and erection documentation. The solicitation was posted on September 18, 2026, with a response deadline of October 1, 2026.
General Info
Agency
NAICS
Place of Performance
CANSet-Aside
Documents
This scope was carved out of RFT-2026-002.
The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.
Lake Huron Primary Water Supply System - Arva Valve Chamber Safety Railings
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Huron Erie Water
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
