Engineering Services – Preliminary Design & Feasibility for Removal of Three Low-Head Dams, Castleton River
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
PMNRCD is soliciting qualified engineering consultants to conduct a preliminary engineering design and feasibility assessment for the potential removal of the Shirt Factory, Slate Factory, and Water Street low-head dams on the Castleton River in Fair Haven. Utilizing a corridor-based systems approach, the selected consultant will evaluate cumulative impacts on hydraulics, geomorphology, ecology, and infrastructure. The scope includes assessing existing conditions, analyzing removal alternatives, investigating dam ownership and legal responsibilities, and coordinating with regulatory bodies and stakeholders. The project requires the development of conceptual engineering recommendations and 30 percent preliminary designs for each dam, focusing on safety, sediment, water quality, and flood resilience. This work is scheduled to take place from August 2026 through October 2027, with a total available funding amount of 60,000 dollars provided via the WUV Enhancement Dam Removal Design and Implementation Block Grant. Responses for solicitation 75065 are due by September 7, 2026.
General Info
Agency
NAICS
Place of Performance
VT, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Vermont → Department of Economic Development
Same awarding agency
