Engineering Services – Preliminary Design & Feasibility for Removal of Three Low-Head Dams, Castleton River

Active
75065State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

PMNRCD is soliciting qualified engineering consultants to conduct a preliminary engineering design and feasibility assessment for the potential removal of the Shirt Factory, Slate Factory, and Water Street low-head dams on the Castleton River in Fair Haven. Utilizing a corridor-based systems approach, the selected consultant will evaluate cumulative impacts on hydraulics, geomorphology, ecology, and infrastructure. The scope includes assessing existing conditions, analyzing removal alternatives, investigating dam ownership and legal responsibilities, and coordinating with regulatory bodies and stakeholders. The project requires the development of conceptual engineering recommendations and 30 percent preliminary designs for each dam, focusing on safety, sediment, water quality, and flood resilience. This work is scheduled to take place from August 2026 through October 2027, with a total available funding amount of 60,000 dollars provided via the WUV Enhancement Dam Removal Design and Implementation Block Grant. Responses for solicitation 75065 are due by September 7, 2026.

General Info

PMNRCD seeks engineering consultants for Castleton River dam removal designs by September 7, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

(1)

RFP 2025 Dam Removal DIBG Fair Haven - FINAL COPY.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, USA

Full Description

Show more
PMNRCD is seeking qualified engineering consultants to complete a preliminary engineering design and feasibility assessment for the potential removal of three low-head dams on the Castleton River in Fair Haven: the Shirt Factory, Slate Factory, and Water Street Dams. The project will use a corridor-based systems approach to evaluate the cumulative hydraulic, geomorphic, ecological, infrastructure, and community impacts of dam removal across the project reach. The study will assess existing conditions and potential removal alternatives, including retention, partial or complete removal, phased removal, and failure scenarios. Preliminary design will evaluate dam safety, sediment conditions, site access and constructability, hydraulic and geomorphic conditions, aquatic habitat and organism passage, water quality, flood resilience, infrastructure risks, public safety, and potential impacts to adjacent properties and public assets. The project will also investigate dam ownership and legal responsibilities, permitting and regulatory requirements, and potential archaeological and historic resource considerations in coordination with the Vermont Division for Historic Preservation. The work will include stakeholder coordination, site investigations, and hydrologic and hydraulic modeling as necessary. The selected consultant will develop conceptual engineering recommendations and 30% preliminary designs for each of the three dams, providing PMNRCD, the Town of Fair Haven, Vermont DEC, and project partners with the technical information needed to evaluate feasibility, benefits, constraints, and readiness for future implementation and final design. The project is anticipated to run from August 2026 through October 2027, with $60,000 in available project funding through the WUV Enhancement Dam Removal Design and Implementation Block Grant (DIBG).

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. This professional services contract involves the design, bidding support, and engineering services during construction for a new municipal groundwater production well to replace and abandon the existing Corydon well. The project is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and matching existing vertical turbine equipment. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction and a negotiated fee for professional services. Proposals are due by September 1, 2026, via the PlanetBids portal. Award selection is based on demonstrated competence and professional qualifications, with weighted factors including relevant experience (25 percent), project approach (25 percent), scope and schedule (20 percent), innovation (10 percent), cost (10 percent), and overall proposal quality (10 percent). The contract is set aside for various small business categories, including Disadvantaged Business Enterprises (DBE). Compliance requirements are extensive, incorporating the Build America Buy America Act for domestic content, the Iran Contracting Act for proposals over one million dollars, and various federal regulations including 2 CFR Part 200 and the Department of Treasury ASAP payment system. The project is scheduled to start on November 2, 2026. Required submittals include a Preliminary Design Report, a detailed cost proposal broken down by task, and various certifications regarding lobbying, debarment, and the use of domestic iron and steel.
Ardurra Group, Inc.

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
05A3042 - Independent Cost Estimator (ICE) and Construction Scheduler in support of CMGC Project Development and Construction Services
Solicitation # 05A3042
The California Department of Transportation (Caltrans) is soliciting Statements of Qualifications (SOQs) for solicitation 05A3042 to secure an Independent Cost Estimator (ICE) and Construction Scheduler. These Architect-Engineer (A&E) services will support CMGC Project Development and Construction Services within the state of California. The estimated contract value ranges from $501,360.00 to $814,710.00, with a 0% DBE Participation Goal. The response deadline for this solicitation is September 16, 2026. Qualified firms must submit an electronic SOQ consisting of seven required sections, including transmittal letters, SF330 forms, availability tables, communication plans, work force analysis, nondiscrimination plans, and California Civil Rights Laws Certification. Key requirements include providing DIR Web record certifications for prevailing wage compliance, DVBE certifications, and a disclosure of potential conflicts of interest. Firms with 50 or more employees must additionally provide a Work Force Analysis and a Nondiscrimination Plan. Proposed key personnel must be documented via SF330 resumes and an availability table, and firms must certify that they have not performed conflicting construction services on related projects.
California Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency