Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering Services – Preliminary Design & Feasibility for Removal of Three Low-Head Dams, Castleton River

Closed
75065State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Public Works

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Poultney Mettowee Natural Resources Conservation District is seeking qualified engineering consultants to perform a feasibility assessment and preliminary design for the potential removal of three low-head dams on the Castleton River in Fair Haven, Vermont: the Shirt Factory, Slate Factory, and Water Street dams. The project utilizes a corridor-based systems approach to evaluate the cumulative impacts of dam removal, including hydraulic, geomorphic, ecological, and infrastructure considerations. The selected consultant will develop 30 percent preliminary designs and evaluate various alternatives such as complete removal, partial removal, phased removal, or retention. The scope of work includes hydrologic and hydraulic modeling, site investigations, stakeholder coordination, and the investigation of legal responsibilities, permitting requirements, and historic resource considerations. The project is funded by the WUV Enhancement Dam Removal Design and Implementation Block Grant with a maximum available budget of 60,000 dollars. The period of performance is expected to run from August 2026 through October 2027, with a required kick-off and scoping site visit by October 10, 2026. Consultants must provide an itemized cost proposal and demonstrate relevant experience in dam removal and river restoration, particularly within Vermont. Required qualifications include professional liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as workers compensation insurance. Proposals are due by September 7, 2026, and will be evaluated based on the proposer's qualifications, experience with public engagement, and the clarity of the proposed project schedule and budget.

General Info

PMNRCD seeks engineering consultants for Castleton River dam removal designs by September 7, 2026.

Place of Performance

VT, USA

Set-Aside

NONE

Documents

1
DOCX, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final CompleteOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
PMNRCD is seeking qualified engineering consultants to complete a preliminary engineering design and feasibility assessment for the potential removal of three low-head dams on the Castleton River in Fair Haven: the Shirt Factory, Slate Factory, and Water Street Dams. The project will use a corridor-based systems approach to evaluate the cumulative hydraulic, geomorphic, ecological, infrastructure, and community impacts of dam removal across the project reach. The study will assess existing conditions and potential removal alternatives, including retention, partial or complete removal, phased removal, and failure scenarios. Preliminary design will evaluate dam safety, sediment conditions, site access and constructability, hydraulic and geomorphic conditions, aquatic habitat and organism passage, water quality, flood resilience, infrastructure risks, public safety, and potential impacts to adjacent properties and public assets. The project will also investigate dam ownership and legal responsibilities, permitting and regulatory requirements, and potential archaeological and historic resource considerations in coordination with the Vermont Division for Historic Preservation. The work will include stakeholder coordination, site investigations, and hydrologic and hydraulic modeling as necessary. The selected consultant will develop conceptual engineering recommendations and 30% preliminary designs for each of the three dams, providing PMNRCD, the Town of Fair Haven, Vermont DEC, and project partners with the technical information needed to evaluate feasibility, benefits, constraints, and readiness for future implementation and final design. The project is anticipated to run from August 2026 through October 2027, with $60,000 in available project funding through the WUV Enhancement Dam Removal Design and Implementation Block Grant (DIBG).

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Grand Avenue Bank Stabilization and Stormwater Scoping
Solicitation # 77305
The Northwest Regional Planning Commission is seeking Statements of Qualifications from design and engineering firms to provide scoping services for the Grand Avenue Bank Stabilization and Stormwater project in the Village of Swanton, Vermont. This scoping-only project focuses on assessing viable options to address a failing retaining wall and inadequately sized culverts at Grand Avenue and Greenwich Street, with a requirement to contemplate stream restoration practices. The final deliverable will be a scoping report that identifies a preferred alternative supported by the host community, adhering to the VTrans MAS Guidebook for Municipally Managed Projects and the MAS Project Development Process. Selection will be conducted via a Qualifications Based Selection process in accordance with the Brooks Act, where firms are ranked based on their technical abilities, proposed project team, previous project examples, and references. The top-ranked firm will enter negotiations for the scope of work and cost, with an anticipated project start date in January 2027. Interested consultants must submit a narrative PDF proposal by December 11, 2026. Successful firms must register with the Vermont Secretary of State and provide insurance coverage meeting Municipal Assistance Section specifications before the contract is executed.
Engineering Services

POSTED

about 22 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
Streambank Stabilization and Utility Pole Repair Project
Solicitation # 7898988
The Streambank Stabilization and Utility Pole Repair Project is a critical infrastructure initiative for the Village of Johnson, Vermont, following a July 2024 flood that eroded the Gihon River bank and compromised a utility pole providing power to essential facilities, including the fire station and wastewater treatment plant. The project requires a qualified contractor to provide all labor, materials, and equipment to secure the utility pole and stabilize the stream bank. The work must be completed and demobilized by July 30, 2027, with construction access managed via Route 15. The project is funded through the VT DEC Design/Implementation Block Grant via the LCPC and Watersheds United Vermont, with an estimated probable cost between $100,000 and $200,000. The contract will be awarded to the lowest responsive bidder, with evaluations based on personnel qualifications, past similar projects, and the ability to meet the project timeline. Bidders must submit a sealed bid by December 7, 2026, including a bid guarantee of 5%, a non-collusion affidavit, a debarment affidavit, and a worker classification compliance form. The selected contractor must provide performance and payment bonds for 100% of the contract price and maintain comprehensive insurance, including $1,000,000 per occurrence and $2,000,000 for products/completed operations. Additionally, the State of Vermont has established a 10% participation goal for Disadvantaged Business Enterprises. Final payment is contingent upon a site inspection and approval by the project engineer from DuBois & King, Inc.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS