Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Utility Pole Securing and Guidewire Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 7898988.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Streambank Stabilization and Utility Pole Repair Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 21 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Streambank Stabilization and Utility Pole Repair Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Secures utility poles and reinstalls guidewire systems for prime contractors on Village of Johnson utility projects. Re-installs or replaces unearthed guidewires and ensures the pole is structurally stable and properly tensioned using pole bracing equipment, anchors, and tensioning tools. Requires qualified utility line worker certification. Delivers a secured utility pole with four anchored and tensioned guidewires.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity for the Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires the installation of emergency shut-off switches on power tools within the Facility Maintenance Shop in Edinburgh, Indiana. Specifically, the contractor must provide and install two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with OSHA and EPA regulations, national building codes, and Indiana state laws, with Indiana regulations taking precedence if they are more stringent. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bidders must submit a single lump sum proposal with a detailed cost breakdown for labor, materials, and equipment, along with a timeline for substantial completion. A mandatory site visit was required on November 10, 2026, with a response deadline of November 20, 2026. Award will be based on best value, evaluated by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Required submissions include a completed SF 1413, Vendor Questionnaire, W9, proof of a valid Indiana Contractor's License, and certification of compliance with Davis Bacon Act wage rates. The contractor must maintain general liability insurance of at least 1 million dollars per occurrence and automobile liability coverage. Payment terms are Net 30. The contractor is required to provide a one-year guarantee of workmanship and all applicable manufacturer warranties upon substantial completion of the project.
Atterbury Job Corps. – Adams & Associates

POSTED

about 1 hour ago

DEADLINE

in 3 days
View Details
NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting at its center in Minot, North Dakota. The project focuses on correcting deficiencies identified in the 2026 Facility Survey, specifically within the mechanical and electrical rooms of Building 26 (Female Dormitory) and Building 27 (Single Parent Dormitory). The scope of work requires the contractor to provide all labor, materials, and supervision to install LED emergency/exit light fixtures and directional markings in accordance with NFPA 70 (National Electrical Code) and NFPA 101 (Life Safety Code). This solicitation is set aside for Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Bidders must submit a detailed, itemized quotation using the provided bid sheet, along with a current insurance certificate and any applicable state or trade licenses. Compliance with the Davis-Bacon Act regarding prevailing wages and fringe benefits is mandatory. A bond is required for any proposal exceeding 150,000 dollars. Proposals must be submitted to Leana Leavitt by December 4, 2026, at 4:00pm CST, with a scheduled site walk-through on November 23, 2026. Payment terms are Net 30 following service verification and invoice receipt.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 1 hour ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections, installing standardized external oil sampling devices to improve safety, and conducting oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems to ensure positive pressure is maintained to prevent oil oxidation and moisture intrusion. Key deliverables include annotated infrared images, written condition assessment reports for each asset, comprehensive standard operating procedures, and on-site training for up to 20 agency staff members. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. This is a fixed-price contract with a not-to-exceed total price, intended as a single award to the most capable and cost-effective offeror. Qualified bidders must have completed at least two similar projects in the last five years, including at least one for a utility or industrial facility. Proposals are due by December 23, 2026, via the PlanetBids portal and must include a detailed staffing plan, methodology, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. Performance will take place across multiple agency locations, including sites in Ontario, Chino, and Rancho Cucamonga. The agency requires electronic invoicing and payment via ACH, with a standard 30-day approval process.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Eastern Municipal Water District's Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and the Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supplies. Bids must be submitted by 2:00 PM on November 18th, with a final deadline of November 19th, to be considered responsive. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and must adhere to the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. Minimum insurance requirements include 1 million dollars for General Liability per occurrence, 2 million dollars for Aggregate and Completed Operations, 5 million dollars for Excess Liability, 1 million dollars for Auto Liability, and 1 million dollars for Workers Compensation and Employer Liability. Evaluation will prioritize SBE/DBE participation, including any lower-tier participation provided in the quote. Primary points of contact for the solicitation are Lead Estimator Ryan Falk and Amy Roller.
Axia Electric

POSTED

about 1 hour ago

DEADLINE

in 2 days
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves a qualified electrical contractor inspecting, repairing, and certifying emergency lighting systems in accordance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the integration of fixture data and test results into the facility's Computerized Maintenance Management System (CMMS) and the establishment of an automated 30-day functional testing schedule. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Award decisions will be based on overall best value. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wages and FAR clauses regarding small business utilization, contractor whistleblower rights, and security requirements. Contractors must comply with Executive Order 13706 regarding paid sick leave and provide proof of insurance before commencing work. Final acceptance and payment are contingent upon a substantial completion inspection and the resolution of a final punch list.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation (MTC), acting as the operator for the Joliet Job Corps in Illinois, is soliciting bids for a fixed-price, single lump sum subcontract to replace a water-damaged 30KVA, 480V primary, 120/208V secondary transformer. The scope of work includes pre-work coordination, implementing OSHA-compliant lockout/tagout procedures, removing and disposing of the damaged unit according to environmental regulations, and installing a replacement transformer on a structurally adequate elevated support platform anchored to the building. The project is designated for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bids are due by November 25, 2026, and must include a detailed cost breakout on company letterhead, proof of insurance, three references, and the completed MTC Supplier Packet. The contract requires strict adherence to Construction Wage Rate Requirements, necessitating the payment of prevailing wages and fringe benefits as specified in Wage Determination IL20260008. Award is based on overall best value. Once a Notice to Proceed is issued, work must begin within five business days and be completed within 60 consecutive business days, with liquidated damages of $100 per day for delays. For bids equal to or exceeding $25,000, a bid bond of 20% and subsequent performance and payment bonds from an A- rated surety are required. Payment is processed via AIA documents, with a 10% retainage withheld until substantial completion. Final acceptance is contingent upon a joint inspection and the resolution of a punch list, and the contractor must provide a one-year guarantee for workmanship.
Joliet Job Corps

POSTED

about 1 hour ago

DEADLINE

in 9 days
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 237990
New
SLED
Streambank Stabilization and Utility Pole Repair Project
Solicitation # 7898988
The Streambank Stabilization and Utility Pole Repair Project is a critical infrastructure initiative for the Village of Johnson, Vermont, following a July 2024 flood that eroded the Gihon River bank and compromised a utility pole providing power to essential facilities, including the fire station and wastewater treatment plant. The project requires a qualified contractor to provide all labor, materials, and equipment to secure the utility pole and stabilize the stream bank. The work must be completed and demobilized by July 30, 2027, with construction access managed via Route 15. The project is funded through the VT DEC Design/Implementation Block Grant via the LCPC and Watersheds United Vermont, with an estimated probable cost between $100,000 and $200,000. The contract will be awarded to the lowest responsive bidder, with evaluations based on personnel qualifications, past similar projects, and the ability to meet the project timeline. Bidders must submit a sealed bid by December 7, 2026, including a bid guarantee of 5%, a non-collusion affidavit, a debarment affidavit, and a worker classification compliance form. The selected contractor must provide performance and payment bonds for 100% of the contract price and maintain comprehensive insurance, including $1,000,000 per occurrence and $2,000,000 for products/completed operations. Additionally, the State of Vermont has established a 10% participation goal for Disadvantaged Business Enterprises. Final payment is contingent upon a site inspection and approval by the project engineer from DuBois & King, Inc.
Other Heavy and Civil Engineering Construction

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS