Streambank Stabilization and Utility Pole Repair Project

Open
7898988State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Streambank Stabilization and Utility Pole Repair Project is a critical infrastructure initiative for the Village of Johnson, Vermont, following a July 2024 flood that eroded the Gihon River bank and compromised a utility pole providing power to essential facilities, including the fire station and wastewater treatment plant. The project requires a qualified contractor to provide all labor, materials, and equipment to secure the utility pole and stabilize the stream bank. The work must be completed and demobilized by July 30, 2027, with construction access managed via Route 15. The project is funded through the VT DEC Design/Implementation Block Grant via the LCPC and Watersheds United Vermont, with an estimated probable cost between $100,000 and $200,000. The contract will be awarded to the lowest responsive bidder, with evaluations based on personnel qualifications, past similar projects, and the ability to meet the project timeline. Bidders must submit a sealed bid by December 7, 2026, including a bid guarantee of 5%, a non-collusion affidavit, a debarment affidavit, and a worker classification compliance form. The selected contractor must provide performance and payment bonds for 100% of the contract price and maintain comprehensive insurance, including $1,000,000 per occurrence and $2,000,000 for products/completed operations. Additionally, the State of Vermont has established a 10% participation goal for Disadvantaged Business Enterprises. Final payment is contingent upon a site inspection and approval by the project engineer from DuBois & King, Inc.

General Info

Contract for stream bank stabilization and utility pole repair in Johnson, Vermont.

Documents

1
PDF, High priority: read this firstrfb
High

Read the document

Due in 21 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 21 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
During the July 2024 flood, the Gihon River encroached on the pole, eroded the riverbank, and unearthed one of the four guidewires. The utility lines provide electric power to the core of the Village of Johnson, including critical facilities such as the wastewater treatment plant, municipal office, fire station, and municipal utility garages. Further erosion of the bank and/or dislodging of the remaining guidewires would have catastrophic impacts on the Village of Johnson. The project involves securing the utility pole and stabilizing the stream bank in accordance with the contract plans. The Village is looking for a firm experienced in comparable construction services. Contract for services will be executed between the selected Contractor and the Village. The selected firm or individual will supply all labor, material, subcontractor coordination, and equipment to complete work. All work shall be performed in accordance with contract documents and all relevant codes, regulations and requirements as deemed necessary by the Village. Coordinate work with all Village appointed points of contact to ensure expedited completion of design and bid package preparation to expedite construction project advertising.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2026-012-247A Meramec Greenway: Unger County Park Tail Realignment
Solicitation # 247A
Great Rivers Greenway is soliciting electronic bids via Bid Express for the Meramec Greenway: Unger Park Realignment project in St. Louis County and Fenton, Missouri. The scope of work includes the realignment of the Meramec Greenway within Unger Park and a trail extension to the terminus at Soccer Park Road and Yarnell Road. Key project components include the construction of a new trailhead with a parking lot, modifications to the Unger Park Disc Golf Course, the creation of two lookouts above the Meramec River, and the installation of landscaping, site amenities, and wayfinding signage compliant with 2023 MUTCD and 2010 ADA standards. All work must be executed according to California Department of Transportation standards and regulations, with specific requirements for plant quality and earthwork density testing. Bids are due by December 15, 2026, and must include a complete Equipment Hourly Rates Schedule and a 5% bid security. The contract will be awarded to the apparent low bidder, provided they are deemed responsible and qualified, with the requirement to submit an AIA Form A305 qualification statement within two business days of a request. The successful contractor must comply with Missouri prevailing wage laws, provide performance and payment bonds via AIA Document A312, and adhere to a detailed work schedule with monthly electronic updates. Administrative requirements include a structured payment process where the Developer's Representative issues a Certificate for Payment within seven days of receiving an application. Additionally, contractors must comply with the Anti-discrimination Against Israel Act and USACE permit conditions.
Great Rivers Greenway

POSTED

about 3 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237990
New
SLED
DNR-250064
Solicitation # DNR-250064
The Ohio Department of Natural Resources is soliciting bids for the Shawnee Marina Seawall Slip project located at the Shawnee State Forest in Stout, Scioto County. The scope of work involves the construction of a seawall slip, specifically requiring the installation of W18x97 steel piles and the drilling of shafts both above and below rock. The project is subject to domestic steel use requirements per Ohio Revised Code Section 153.011 and must adhere to AWS D1.1 structural welding standards. The general contract is estimated at $1,502,347.00, with five additive alternates available for additional 10ft seawall sections at $82,000.00 each. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security form, a power of attorney, and an EDGE affidavit, with a project participation goal of 5.0 percent for EDGE-certified businesses. Compliance with prevailing wage rates, Equal Employment Opportunity requirements, and various state executive orders regarding domestic services and Russian institutions is mandatory. The contractor is required to provide a critical path construction progress schedule and must maintain materials in original containers on-site. Payment is processed via contractor payment requests, with a draft pencil copy required one week prior to formal submission and payment issued within 30 days of acceptance by the Architect/Engineer.
Ohio Department of Natural Resources

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
SLED
DNR-250078
Solicitation # DNR-250078
The Ohio Department of Natural Resources (ODNR) is soliciting bids for the Lake Logan Dam Improvements project located in Falls Township, Hocking County, Ohio. This general contracting project focuses on critical infrastructure upgrades, including a Lake Drain Tower pedestrian access bridge, parking lot catch basins, piping, and concrete gutters, with an optional alternate for a spillway pedestrian crossing bridge. The estimated period for substantial completion of all work is 365 days. The contract includes specific financial allowances for parking lot restoration at 150,000 dollars and monitoring instrumentation at 130,000 dollars, while the alternate spillway bridge is valued at 150,000 dollars. The project is designated as a state of Ohio prevailing wage project and requires strict adherence to ACI 301 concrete standards and ASTM E329 or ASTM C1077 testing documentation. The contractor is responsible for all construction means, methods, and safety programs, with water-control measures requiring approval from ODNR Dam Safety. Bidders must provide comprehensive certifications regarding Ohio ethics laws, conflict of interest laws, and Executive Orders 2019-12D and 2022-02D. Required submission materials include a bid bond or cashier's check, drug-free workplace certificates, and EDGE program commitments, with original security documents due to the contracting authority within three days of the bid.
Ohio Department of Natural Resources

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging
Solicitation # W912PM27BA002
The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center, is soliciting bids for a firm-fixed-price contract to perform maintenance dredging at the Calcasieu River Bar Channel in Louisiana, Pascagoula Harbor in Mississippi, and Panama City Harbor in Florida. The project requires a self-propelled, trailing suction-type hopper dredge capable of operating 24 hours a day, seven days a week. Specific depth requirements include -45 feet MLLW for Calcasieu, -46 feet MLLW for Pascagoula, and -40 feet MLLW for Panama City. Performance is scheduled to begin in the Calcasieu River Bar Channel by January 30, 2027, followed by Pascagoula Harbor from April 1 to July 31, 2027, and Panama City Entrance Channel from August 1 to September 30, 2027. Award will be made as a whole to a single responsible bidder based on the lowest price, with a 10 percent price evaluation preference for HUBZone small businesses. Bidders must select one of four bid lots based on their dredge's pump size and hopper capacity. Key requirements include registration in the System for Award Management, submission of bids via the PIEE website in PDF format, and the provision of a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less. The successful contractor must adhere to EM 385-1-1 safety standards, implement sea turtle protection measures, and provide a certified chief surveyor. Performance and payment bonds are required at 100 percent of the original contract price upon award.
W074 Endist Wilmington

POSTED

about 6 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
SLED
26RFCSP85 Brushy Creek Trail Retaining Wall
Solicitation # 26RFCSP85
Williamson County is soliciting competitive sealed proposals for the Brushy Creek Trail Retaining Wall project (26RFCSP85) to stabilize an existing retaining wall and resolve erosion and drainage issues near UBCWCID Dam No. 7 in Cedar Park, Texas. The scope of work involves rehabilitating approximately 60 linear feet of a 170-foot wall through compaction grouting, localized grading, and the placement of 265 square yards of stone riprap for slope stabilization. Additional requirements include wetland-edge revegetation, the replacement of 145 linear feet of metal wire fence, and the implementation of temporary erosion and sedimentation controls. The project has a construction budget of 200,000.00 dollars and a completion timeline of 90 days. Proposals must be submitted by November 23, 2026, at 3:00 PM CST, and eligibility requires attendance at the mandatory pre-solicitation conference and site walk held on November 9, 2026. Award selection is based on a 100-point scoring system evaluating project manager qualifications, experience, government performance history, and pricing. The successful contractor must comply with Texas Prevailing Wage Law and provide comprehensive insurance coverage, including Workers Compensation and General Liability. Furthermore, payment and performance bonds are required for public works contracts exceeding 25,000.00 and 100,000.00 dollars, respectively, while a 5 percent bid bond is mandatory for solicitations over 100,000.00 dollars.
Wilco

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Vermont → Department of Economic Development

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS