Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Battelle Energy Alliance–doe Cntr was posted on January 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Enhanced Frequency Response for Run-of-River Hydropower Plants

Closed
BA-1536Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work includes the installation of 28 wood H-Frame tangent structures and one steel monopole dead-end on a drilled pier. Additionally, the project requires upgrading existing conductors and shield wires to 954 45/7 ASCR Rail conductor and 7/16 inch EHS steel shield wire, as well as the installation of .551 diameter fiber optic ground wire from Structure 107 to Dead-End Structure 79. The contractor is responsible for providing all necessary labor, supervision, tools, equipment, and miscellaneous materials. The contract will be awarded to the responsible bidder offering the lowest cost and best bid, with evaluation factors including price, technical conformance, schedule, qualifications, and performance history. Bids must be submitted in sealed hard copy form to the Procurement Department in Columbus, Nebraska, by December 2, 2026, at 2:00 PM. Required submission documents include the proposal page, price quotation table, bid security, and a W-9 form. The contractor must maintain comprehensive insurance, including workers compensation and commercial general liability, and provide a contract performance bond. A non-mandatory pre-bid teleconference and site visit are scheduled for November 23, 2026.
Nebraska Public Power District

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract outlines a technology focused on enhancing frequency response capabilities of Run-of-River (RoR) hydropower plants through the integration of energy storage systems and advanced control policies. These hydropower plants, prevalent throughout the U.S., currently lack the capability to provide grid support such as frequency regulation due to their design aimed at peak efficiency. By implementing a control policy that leverages frequency control strategies like rate-of-change of frequency (RoCoF) and frequency-Watt (f-Watt) responses, alongside optimized state-of-charge management for energy storage systems, RoR plants can achieve more stable and reliable standalone operation. Additionally, the system employs bounded integral feedback for controlling current and voltage via DC-DC converters and inverters, ensuring closed-loop stability during power transfer and injection. This integrated solution not only improves frequency response and energy storage system performance but also guarantees operational stability and versatility across other renewable energy sources such as solar, wind, and marine energy microgrids. It is applicable for small hydropower plants contributing 3.7 GW to the U.S. grid, offering increased grid stability and resilience, and serves microgrid developers and energy storage solution providers looking to expand functionality in renewable energy contexts. The contract, managed by Battelle Energy Alliance at Idaho National Laboratory, targets licensing opportunities for companies to commercialize this technology, with a response deadline set for January 2026.

General Info

Technology enhances frequency response in Run-of-River hydropower via energy storage and advanced controls.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBattelle Energy Alliance–doe Cntr
Contacts1 person available
OfficeIdaho Falls, ID, 83415, USA
Office AddressIdaho Falls, ID, 83415, USA
Contacts
Technology Deployment

Full Description

Show more

Enhanced Frequency Response for Run-of-River Hydropower Plants


A Control Policy Leveraging Energy Storage Systems for Standalone Operation Stability


There are thousands of Run-of-river (RoR) hydropower plants (HPPs) across the U.S. Many are interconnected to distribution or sub-transmission systems or relatively weakly connected parts of the electric grid. These plants are typically designed and optimized to operate at peak efficiency and cannot provide grid support under current protocols such as frequency regulation. If these hydropower plants could provide frequency regulation, they would enable more independent grid management of local loads (i.e., allow the use of the hydropower plants to form microgrids).


How It Works


This innovative control policy enhances the frequency response of RoR HPPs in standalone mode by integrating energy storage systems through advanced control architecture:


  1. Frequency Control: Utilizes rate-of-change of frequency (RoCoF) and f-Watt (frequency-Watt) strategies to stabilize frequency fluctuations.
  2. Energy Storage Management: Ensures optimal energy storage system (ESS) performance by managing state-of-charge (SOC), preventing overcharge/discharge, and maintaining rechargeability.
  3. Current and Voltage Control: Employs a bounded integral feedback strategy for DC-DC converters and inverters, ensuring closed-loop stability during power injection and transfer.
  4. Integrated System Design: Combines frequency, current, and voltage control to improve response while maintaining operational stability.

The result is a robust solution for energy storage integration, enabling RoR HPPs to deliver reliable performance even under challenging conditions.


Key Advantages


  • Improved Frequency Response: Enhances system stability with advanced RoCoF and f-Watt strategies.
  • Energy Storage Optimization: Prevents energy storage system overcharge/discharge while enabling recharge capabilities.
  • Guaranteed Stability: Utilizes bounded integral control to ensure closed-loop system reliability.
  • Integrated Solution: Combines frequency and current/voltage control for comprehensive performance enhancement.
  • Versatility: Applicable to other renewable systems, including solar, wind, and marine energy microgrids

Applications:


  • Small hydropower plants contribute 3.7GW to the U.S. grid. This technology could be integrated with these assets to enhance grid stability and resiliency.
  • Microgrid Developers: Enhances standalone operation for renewable energy-based microgrids with ESS.
  • Energy Storage Solutions: Expands the functionality of ESS in renewable energy applications.
  • Government and Research Institutions: Supports DOE initiatives for sustainable energy and critical load management.


INL’s Technology Deployment department focuses solely on licensing intellectual property and collaborating with industry partners who can commercialize our innovations.


We do not engage in purchasing, procurement, or hiring external services for technology development. Our objective is to connect with companies interested in licensing and bringing our technologies to market.


More opportunities from Battelle Energy Alliance–doe Cntr

Same awarding agency

New
Federal
ATR Loop Pressurizer Fabrication
Solicitation # INL-27-001
Battelle Energy Alliance, LLC, acting as the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory, is seeking Expressions of Interest for the fabrication of one ASME Section VIII, Division 2 stainless steel pressure vessel for the ATR Loop Pressurizer (1A-NE Loop). The scope of work includes the fabrication, inspection, and physical testing of a vertically oriented, leg-mounted vessel with radial side arms, including the supply of all materials, mounting leg stands, spray nozzles, and lifting lugs. Key technical requirements include a design pressure of 2500 psig, a design temperature of 668 degrees Fahrenheit, and a 60-year design life. The vessel must be constructed from Type 347 and 316 stainless steel and comply with strict nuclear and structural standards, including ASME NQA-1 (2022), AISC 370, and ASCE seismic design codes. The selected vendor will be responsible for shop drawing development, hydrostatic testing at a minimum of 3415 psig, and load testing of lifting lugs. Quality assurance is paramount, requiring a quality program equivalent to ASME NQA-1, full volumetric inspection of side-arm weld joints, and an ASME U-stamp certification. The final product must be cleaned to Class B standards, preserved per STD-7020 A, and delivered in a forklift-compatible horizontal container to WestOne Logistics in Idaho Falls, Idaho. This EOI process serves as a qualification step to identify capable vendors for a subsequent Request for Proposal, with a submission deadline of November 6, 2026.

POSTED

3 days ago

DEADLINE

in 9 days
View Details
NAICS: 562119
Federal
E-Waste Collection Events
Solicitation # INL-26-057
Battelle Energy Alliance LLC, the Management and Operating Contractor for the Department of Energy owned Idaho National Laboratory, is seeking Expressions of Interest from qualified recyclers to organize residential electronic waste collection events. This initiative supports a research project comparing battery-containing device collection strategies in states with and without electronics recycling laws. The goal is to determine if successful methods from regulated states can be effectively applied to nonregulated states to increase collection volumes and public awareness. Eligible locations include a wide range of nonregulated states such as Alabama, Florida, Ohio, and Wyoming, though certain regions of Idaho are excluded. Selected vendors will be required to compile data on existing residential collection trends, organize two to three new collection events per organization, and implement multi-channel advertising campaigns. All activities must be completed by September 30, 2027, with detailed reporting on participant numbers and waste quantities. Participating entities must provide proof of downstream management and industry certifications, such as R2 or e-Stewards. This EOI process, with a submission deadline of November 13, 2026, serves as a preliminary screening to identify qualified vendors who may be invited to participate in a formal Request for Proposal process.
Other Waste Collection

POSTED

29 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS