Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Environmental Compliance & Monitoring

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Environmental Compliance and Monitoring supports prime contractors on Caltrans District 5 roadway projects within the San Luis Obispo and Santa Barbara regions. The selected provider will be responsible for implementing the Mitigation Reporting or Monitoring Plan, ensuring strict ecological protection through direct coordination with the California Department of Fish and Wildlife and Caltrans. The scope of work requires specialized expertise in the California Environmental Quality Act and CDFW permitting jurisdictions. Key deliverables include the production of comprehensive mitigation reports and all necessary compliance documentation to ensure project adherence to environmental regulations.

General Info

Environmental compliance and monitoring subcontract for Caltrans District 5 roadway projects in California.

Documents

This scope was carved out of SLO-47299-R4.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Santa Margarita 58 CAPM

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Santa Margarita 58 CAPM
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 5 - San Luis Obispo/Santa Barbara
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs environmental monitoring and reporting for prime contractors on Caltrans District 5 roadway projects. Implements the Mitigation Reporting or Monitoring Plan and coordinates with CDFW and Caltrans to ensure ecological protection. Requires expertise in California Environmental Quality Act (CEQA) and CDFW permitting jurisdiction. Delivers mitigation reports and compliance documentation.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Caltrans, District 5 - San Luis Obispo/Santa Barbara

Same awarding agency

NAICS: 237310
SLED
Vandenberg Village Pavement Preservation Project (CAPM)
Solicitation # 05-1N890
The Vandenberg Village Pavement Preservation Project (CAPM), managed by Caltrans District 5 under solicitation 05-1N890, focuses on the rehabilitation of approximately 27 lane miles of pavement on State Route 1 in Santa Barbara County, specifically from post mile 23.000 to 29.891. The scope of work includes the application of Rubberized Hot Mix Overlay, cold planing, shoulder widening and backing, drainage restoration, and guardrail upgrades. Additionally, the project will implement bicycle conflict markings and the rehabilitation of 21 curb ramps to ensure ADA compliance. Construction is anticipated to take place between the summer and winter of 2027, with an estimated duration of 170 to 200 working days. The project is governed by a Mitigated Negative Declaration under CEQA, ensuring that no significant environmental effects will occur provided that specific mitigation measures are followed. Key regulatory requirements include adherence to the Caltrans 2023 Standard Specifications for emissions reduction, air pollution control, solid waste disposal, and temporary traffic control. Necessary permits to be obtained before construction include a Nationwide Permit from the U.S. Army Corps of Engineers, a Streambed Alteration Agreement from the California Department of Fish and Wildlife, and Water Quality Certification from the Regional Water Quality Control Board. A comprehensive Transportation Management Plan and a Mitigation and Monitoring Plan will be developed during the design phase to manage traffic and protect jurisdictional waters and riparian habitats.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
San Benito U.S. Route 101 Pavement Rehabilitation Project
Solicitation # 05-1J840
The California Department of Transportation (Caltrans) District 5 is implementing the San Benito U.S. Route 101 Pavement Rehabilitation project (EA 05-1J840). The project involves the rehabilitation of 30.290 lane miles of pavement along a 7.55-mile section of U.S. Route 101, extending from the Monterey-San Benito County line to the San Benito-Santa Clara County line. Key deliverables include the application of a 0.15-foot rubberized hot mix asphalt overlay, the restoration of 28 culverts across 12 locations, and the installation of a wildlife undercrossing with directional fencing and escape ramps. Additionally, the scope includes upgrading concrete barriers, metal beam guardrails, and end treatments to meet Manual for Assessing Safety Hardware standards, as well as replacing one traffic census station and repairing two others. Construction is expected to begin in July 2030 with an anticipated completion date of January 2034. The project has undergone environmental review under CEQA and NEPA, resulting in a Mitigated Negative Declaration. Mitigation measures are in place to protect biological resources, specifically special-status species such as the western burrowing owl, Monterey hitch, and central California coast roach, and to manage risks associated with abandoned oil and gas wells. The project is funded through the Roadway Preservation Program for delivery in Fiscal Year 2029-2030 and adheres to Title VI of the Civil Rights Act and ADA accessibility requirements.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Big Creek to Carmel Drainage Restoration
Solicitation # EPIMS-MON-61596-R4
The Big Creek to Carmel Drainage Restoration project, identified by Agreement Number EPIMS-MON-61596-R4, is a Lake or Streambed Alteration Agreement executed by the California Department of Fish and Wildlife for the California Department of Transportation District 5. Located on State Route 1 in Monterey County at highway post miles 30.10, 30.86, and 33.87, the project focuses on improving drainage infrastructure. The scope of work includes replacing degraded culverts, headwalls, and drainage inlets, installing rock slope protection, removing vegetation for construction access, and implementing temporary stream diversions and erosion control treatments. The project is governed by Fish and Game Code section 1602 and requires adherence to a specific Mitigation Reporting or Monitoring Plan adopted by the California Department of Fish and Wildlife. Initial approval was granted on January 26, 2026, with a subsequent Amendment No. 1 approved on July 14, 2026, which introduced provisions for night work and modified geotextile fabric inspection periods. The project has been determined to have no significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that the adopted mitigation measures are followed. Key administrative contacts include Lara Bertaina for the lead agency and Mindy Trask for the responsible agency.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
State Route 68 Drainage ImprovementsThe State Route 68 Drainage Improvements project, managed by Caltrans District 5 in San Luis Obispo, involves comprehensive infrastructure repairs and upgrades along State Route 68 in Monterey County, specifically between postmiles 0.2 and 15.7. The scope of work includes the replacement of seven culverts, installation of headwalls, flared end sections, and rock slope protection, as well as electric system upgrades and lighting improvements. Additionally, the project requires the installation of Transportation Management System traffic monitoring equipment at 27 locations. Support services include vegetation trimming and removal, equipment access and staging, and temporary stream diversion and dewatering. Environmental compliance is a critical component of the project, as it is subject to the California Environmental Quality Act and holds a California Endangered Species Act Incidental Take Permit. The project is authorized for the incidental take of the threatened California tiger salamander, with identified impacts including permanent and temporary loss of upland habitat. Project approval is contingent upon the implementation of specific mitigation measures and a monitoring plan to ensure no significant environmental effects occur. The lead agency for this effort is the California Department of Transportation, District 5, with administrative oversight provided by the California Transportation Commission.
Highway, Street, and Bridge Construction

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Alamo Pintado Bridge Replacement
Solicitation # EA 05-1M420
The Alamo Pintado Bridge Replacement project, identified by solicitation number EA 05-1M420, involves the replacement of the scour-critical Bridge Number 51-0130 on State Route 246 in Santa Barbara County, specifically from post miles 30.173 to 30.435. Managed by Caltrans District 5, the scope of work includes the construction of a 120-foot 8-inch long and 59-foot wide three-span concrete deck bridge. Key infrastructure improvements include the installation of straight abutment walls, rock slope protection for embankments and nearby structures, and the upgrade of four outdated ADA curb ramps at the Alamo Pintado Road intersection. Additionally, the project will feature a 14-foot-wide Class 1 Bikeway with two-foot-wide barriers and a northeast retaining wall to ensure continuous pedestrian and cyclist access. Environmental compliance is a primary focus, with the project having completed reviews under CEQA and NEPA, resulting in a Mitigated Negative Declaration. Contractors must adhere to strict biological protections, including inspections by a qualified biologist for American badgers and other wildlife within three days of any ground-disturbing activities. Operational requirements mandate that field work occur between 8:00 am and 3:00 pm, Monday through Friday, with no overnight storage of equipment permitted on site. The project also emphasizes non-discrimination in accordance with Title VI of the Civil Rights Act of 1964 and requires adherence to Caltrans Standard Specifications for the disposal of electrical equipment and the marking of environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

12 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS