Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Energy was posted on August 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EPICS-Compatible Motion Control Chassis and Modules Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract involves the supply of multi-axis motion controller hardware for prime contractors supporting Department of Energy Office of Science projects. The scope of work includes the delivery of sixteen hardware chassis along with stepper motor controllers and analog/digital I/O modules that are fully compatible with EPICS. All equipment must adhere to the PIP-II Motion Controls Technical Requirements RevA and include necessary ECCN, EAR99, and HTS export certifications. Managed by Fermilab as a DOE contractor, the project is centered in Batavia, Illinois. The procurement falls under NAICS code 334513, with a response deadline set for September 9, 2026.

General Info

Supply sixteen EPICS-compatible motion controller chassis for DOE projects by September 9, 2026.

NAICS

334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

This scope was carved out of 384918-RK.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PIP-II MOTION CONTROL SYSTEM

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies multi-axis motion controller hardware for prime contractors on DOE Office of Science projects. Provides sixteen hardware chassis, stepper motor controllers, and analog/digital I/O modules compatible with EPICS. Ensures compliance with PIP-II Motion Controls Technical Requirements RevA and provides ECCN/EAR99/HTS export certifications. Delivers sixteen hardware chassis and associated modules.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 237130
Federal
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Solicitation # RFP-383167-CD
Fermi Forward Discovery Group, LLC is soliciting proposals for the reconstruction and renovation of the Kautz Road Substation (KRS), designated as UIP subproject SP-2, at the Fermi National Accelerator Laboratory in Batavia, Illinois. This firm-fixed-price subcontract involves comprehensive demolition, building expansion, and the installation of low and medium voltage power systems, including 345kV substation yard equipment and a new prefabricated control house. The project is subject to a critical schedule constraint tied to the Fermilab accelerator shutdown, with on-site construction anticipated to occur between January 1, 2028, and January 1, 2030, with a final project completion deadline of September 30, 2029. The selection process utilizes a best-value tradeoff method where technical factors, including organizational structure, safety compliance, and past performance on high-voltage substation projects, are significantly more important than price. Offerors must meet strict pass/fail thresholds regarding financial capability, such as a current ratio of 1.10 or greater and an aggregate bonding capacity of at least 30 million dollars, as well as rigorous safety performance metrics. The contract mandates compliance with the Davis-Bacon Act for prevailing wages, various FAR and DEAR flow-down provisions, and specific federal anti-discrimination laws. Key milestones include the completion of submittals within 60 days of the Notice to Proceed and the formal issuance of the Authorization for Use and Possession by July 2, 2029.
Power and Communication Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in about 1 month
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group, LLC for the U.S. Department of Energy, is soliciting proposals for the procurement of two solenoid magnets with integrated dipole correctors. This solicitation, number 389116swk, utilizes a best value trade-off source selection process where technical capabilities, infrastructure, and past experience are weighted as significantly more important than price. Proposals are due by 5pm Central on December 9, 2026, with a deadline for questions set for November 30, 2026. The selected subcontractor must provide a detailed Gantt chart, evidence of in-house manufacturing and magnetic testing capabilities, and a history of three similar contracts completed within the last five years. The scope of work requires strict adherence to ASME B31.3 welding and brazing standards and FNAL guidelines. Key deliverables include the hardware and associated material certifications for copper, epoxy, and steel. Acceptance is contingent upon Factory Acceptance Tests conducted at the subcontractor's facility, with specific requirements for field homogeneity and pressure testing. Shipping must be F.O.B. Fermilab in a single batch, utilizing crates equipped with irreversible shock indicators recording loads exceeding 10 G. All units must feature unique serial numbers and specific lead markings to ensure traceability and correct polarity.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

7 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS