Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Equipment Structural Integrity & Welding Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Equipment Structural Integrity and Welding Repair supports greenery projects for OC Waste and Recycling in California. The selected contractor will be responsible for performing visual inspections and structural repairs on equipment frames and welds, specifically evaluating components for corrosion, wear, and damage. Key deliverables include the provision of detailed inspection reports and the execution of necessary welding or structural reinforcements. To qualify for this engagement, contractors must hold a valid California State Contractor’s License, specifically a C-60 Welding license or a similar certification. The solicitation was posted on September 14, 2026, with a response deadline of October 13, 2026. This opportunity falls under NAICS code 811111 and is intended for those capable of providing specialized structural maintenance for prime contractors.

General Info

Subcontract for equipment structural inspections and welding repairs for OC Waste and Recycling.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB-299-3125001-AA.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GREENERY EQUIPMENT MAINTENANCE & REPAIR SERVICES

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → OC Waste & Recycling
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs visual inspections and structural repairs on equipment frames and welds for prime contractors on County of Orange (OC Waste & Recycling) greenery projects. Evaluates frames for damage, wear, and corrosion, and performs welding or structural reinforcement. Requires a valid California State Contractor’s License (C-60 Welding or similar). Delivers inspection reports and completed structural repairs.

Similar Contracts

Same NAICS industry code

More opportunities from California → OC Waste & Recycling

Same awarding agency

NAICS: 325613
New
SLED
Organic Defoamer
Solicitation # IFB-299-3134901-AA
The County of Orange, through OC Waste & Recycling, is soliciting bids under IFB-299-3134901-AA for the procurement of a commercially manufactured organic defoamer. This product is required to support the Olinda Landfill leachate treatment system by rapidly controlling excessive foam to prevent operational disruptions and protect equipment. The selected contractor must provide the defoamer in 55-gallon drums or 275-gallon totes on an as-needed basis, ensuring the product is compatible with existing pumps, piping, and downstream processes. Additionally, the contractor is responsible for determining the appropriate dosage rates and application methods while providing technical support during initial field testing. The contract will be awarded to the lowest responsive and responsible bidder, with specific price preferences applied to certified Orange County Local Small Businesses (OCLSB) and Disabled Veteran Business Enterprises (DVBE). Bidders must submit firm pricing and provide essential documentation, including a valid UEI and D-U-N-S number, a signed W-9, and a Campaign Contribution Disclosure Form. The agreement requires the submission of a Faithful Performance Bond and a Labor and Material Payment Bond, as well as compliance with California safety regulations regarding Safety Data Sheets. Deliveries are to be made to the Olinda Landfill in Brea, California, during standard weekday business hours, with acceptance contingent upon written verification by the County.
Surface Active Agent Manufacturing

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 237120
New
SLED
DBB Prima Zone 4 Phase A Main Gas Line Project
Solicitation # 299-3104108-AR
The DBB Prima Zone 4 Phase A Main Gas Line Project is a solicitation issued by OC Waste & Recycling for the design, permitting, and construction of a Landfill Gas Collection and Control System header installation at the Prima Deshecha Landfill. The scope of work includes trenching, the installation of 20, 24, and 36 inch HDPE SDR-17 piping, the placement of butterfly header valves, and the construction of traffic-rated concrete valve vaults. Additional requirements involve the excavation of approximately 200,000 cubic yards of breccia stockpile, the construction of gravel and asphalt roads, and the restoration of disturbed areas. The project is estimated at 9,120,900 dollars and must be completed within 210 calendar days from the notice to proceed, with liquidated damages set at 8,500 dollars per day for delays. The contract will be awarded to the lowest responsive and responsible bidder among a pre-qualified list of contractors holding a Class A General Engineering license. Bidders must provide a 10 percent bid security and commit to subcontracting at least 3 percent of the total contract value to certified OCLSB or DVBE firms. Compliance requirements include adhering to general prevailing wage rates, submitting certified payroll, and following the County's Safety and Loss Prevention Policy. Technical specifications mandate the use of 3 inch wide detectable foil marker tape and specific LFG identification on vault covers. The successful contractor is required to provide a baseline schedule within 30 days of the notice to proceed and submit weekly and monthly progress updates.
Oil and Gas Pipeline and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS